| 1 | Earth work in removing of theks from river bed , side berm as required including hard clay ,chharry , bajri lift up to 1.5m including mannualy compaction and dressing to profile by JCB exacavation . |
| 2 | Earth work in excavation of foundation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.2.6.1 All kinds of soil |
| 3 | Centering and shuttering for P.C.C.in foundation and porcupine including cost of all materials , Labours T& P |
| 4 | Supplying and laying of Steel reinforcement including placing in position at site. including cost of all materials, labours, T&P etc. |
| 5 | Local sand filling in stair base |
| 6 | Sigle filling in Staire base 150mm th |
| 7 | PCC in 1:3:6 in Foundation and Gauge pillars |
| 8 | Supplying and Laying of R.C.C (1:1.5:3) with stone grit and coarse sand including cost of all materials, labour, T&P etc. |
| 9 | Brick Work 1:4 C.M. in Toe wall |
| 10 | Painting of Gauge post / pillar with two coat of water proof cement paint of approved quality on previously new treated surface with this paint to give an even shade after throughly brushing the surface to remove all dirt and remains loose podered material. curing and cost of all materials. |
| 11 | Providing and engaging of sign board at GD site . |
| 12 | Painting of sign board |
| 13 | Writing letter on signboard upto 50mm size . |
| 14 | Writing letter on signboard above 50mm size , but below 80mm size. |
| 15 | Making / construction of coffer bund by cartage earth of 2.00 mtr dia including cost of all materials , Labours , T&P etc. |
| 16 | STOREEarth work in Foundation of masonary work on channel of discharge above 10 cumec including lead upto 30 m lift up to 1.5m and its disposal and back filling for building works. |
| 17 | Supply & laying of PCC 1:3:6 with 20mm to 40 mm size dala grit and coarse sand not less than 2.0 F.M.including cost of all material ,labour and T&P etc. |
| 18 | Supplying & laying of R.C.C( 1:1.5:3 )with 10 mm to 20 mm size stone grit and coarse sand not less than 2.0 F.M. including cost of all materials ,labour T&P etc. |
| 19 | Supply & laying of P.C.C 1:2:4 with 10 mm to 20 mm size stone grit and coarse sand not less than 2.0 F.M.including cost of materials ,labour T&P etc. |
| 20 | Supply and Laying of Brick Ballast 40 mm gauge including cost of all material ,Labour T&P etc. |
| 21 | Supply and Laying of Local sand including cost of all material ,Labour T&P etc. |
| 22 | Supply and Laying of flate Brick solling for apron including cost of all material ,Labour T&P etc. |
| 23 | Supply & Laying of flush pointing (1:3)over brick solling for apron including cost of all materials Labur T&P etc. |
| 24 | Supplying & Laying of mortor (1:4) over roof slab including cost of all materials ,Labour T&P etc. |
| 25 | First Class Brick work in 1:4 cement and chopan sand mortar including cost of all material,labour ,scafolding and T&P etc.required for proper completion of work. |
| 26 | Cement plastering 1:4 on Brick masonary with sand mortor including cost of material ,Labour scofolding and T&P etc. required for proper completion of work . |
| 27 | Distempering two coat of oil bound distemper of approved make of Burger ,Jenson & Nicholsen,Shalimar ,Asian ,Nerolac.over one priming coat of cement primer on new surface after thoroughly brushing the surface free from mortor droping and other foregin matter and also including prepairing the surface even with plaster of paris/shifting and sand papered smooth including cost of all material, labour T&P etc.required for completion of work. |
| 28 | Providing and fixing pressed steel door & window frame confirming to IS 4351 manufatured from commercial mild steel of 1.2 mm thickness including hing ,jamb, lock jamb beadand if required angle threshold of mild steel angle of section 50x25 mm or base tie of 1.0 mm pressed mild steel welded or rigidly fixed together by mechanical means adjustable lugs with split end tail to reach jamb including steel but hing 2.5mm thick with mortor guard ,lock strike plate and soft absorvers as specified as and applying a coat of approved steel primer after pre treatment of the surface as directed by engineer in charge. |
| 29 | Supplying & Fixing of flush door 40mm thick commercial quality confirming to I.S.2202 Part I (1983) including Fixing of wooden ccleat s and stopper and including fixing and adjustment of hing bolt lock handle spring fitting with necessary screw to be supplied by departmental. |
| 30 | Painting two coat over priming coat (but excluding cost of priming coat on steel/new wood surface and other metal surface including cleaning the surface of all dirt and dust other foregin matter sand prepairing and stooping including cost of all materials ,Labour ,T&P etc.as required for completion of work paint shall be used as per standard IS specification . |
| 31 | Providing and fixing 1.0mm M.S.thick sheet sliding shutter with frame & diagonal braces of 40x40x6 mm angle Iron 3.0 mm M.S.Gusset plate the junction and comer 25 mm dia pully 40x40x6 mm angle T Iron guide at the top and bottom resprctivly including applying a primming coat of approved steel primer . |
| 32 | Supplying & fixing Galvanized mosquto havy quallity Iron wir gauge of expanded metal havy quallity our window and including C.P. teak wood batten 3.0x10.00 proper completion with server and including supply of all in materials and T&P etc required for complrtion of work . |
| 33 | P/F Indian Type white verteous china (Orrisa pattern )W.C.pan size 580x440mm Indian make of approved quality including cost of material . |
| 34 | Supply of PVC Bend of 100 mm dia including cost of all materials,Labour ,T&P,etc. |
| 35 | Supply of PVC pipe of 150 mm dia including cost of all materials,Labour ,T&P,etc. |
| 36 | Mild Steel or Iron Plain work such as reinforced concrete (when not included in an over all rate ) wrought to required shape as neccessory including bending supply of all steel and wastages and over lapping and hooks . |
| 37 | Centering & Shuttering for PCC in foundation and porcupine including cost of shuttering. A-R.C.C. above G.L |
| 38 | Centering & Shuttering for PCC in foundation and porcupine including cost of shuttering. B- P.C.C. on Ground |
| 39 | 5cm to7.5 cm Boring of Hand pump including lowering of assmbly and extraction of casing pipe including all cost of materials ,labours ,T&P etc. |
| 40 | E/W in filling by transport for a lead up to 1 km including excavation ,loading ,unloading , manual compaction and dressing including all lift rates shall be applicable for lead beyond upto 1 Km . complete in all respect. |
| 41 | Supply , installation ,testing and commissioning of gride intractive roof top solar phto voltaic power genration system including space frame .As per PAR Sl.No 6.8 Please Enable Macros to View BoQ information |