|
| 1 | LT Distribution starter panel sheet steel enclosure made out of 2mm CRCA sheet totally enclosed, powder coated free standing, floor mounted type, dust& vermin proof, outward opening, lockable doors having hidden hinges and a bolted back cover both using non-deteriorating neoprene rubber gaskets to provide IP-54 protection. The each part of the fabricated panel will be strictly subjected to seven tank treatment. The various components, assemblies and sub equipment’s of the panel will be as per standard given in relevant IS. The bus bar of the panel will be shaped out of high conductivity, electrolytic conductor and shall be liberal sized in aluminum. The control wiring of the panel will be done with PVC flexible copper wires of 1.5mm cross section. Each wire will be terminating with a ferule crimped to the wire, size 1200MM x1000x350mm. Having following components of approved make. |
| 2 | MCCB 415V, Four pole 3phase High breaking capacity 36KA 50Hz, 200Amp with spreader - |
| 3 | MCCB 415V, TP 3phase High breaking capacity 36KA 50Hz,100Amp with spreader & Handle |
| 4 | MCB Single pole 6Amp. |
| 5 | MCB Triple pole 32Amp |
| 6 | PVC insulated copper flexible cable single core 16 sq.mm Make :- Havells/ Finolex/ Grandlay |
| 7 | Power capacitors 415V unit of 10Kvar |
| 8 | Over load relay24-40 |
| 9 | Over load relay 4.5-7.5 |
| 10 | Amp. Meter Digital |
| 11 | Volt Meter Digital |
| 12 | Motor protection Relay MPR-300 16-44 Amp. |
| 13 | Power contactor 220V 3phase70Amp. |
| 14 | Power contactor 220V 3phase50Amp. |
| 15 | Power contactor 220V 3phase18Amp. |
| 16 | Star delta timer on delay |
| 17 | Indicating lights LED type RYB & On/OFF |
| 18 | Current Transformer200/5,100/5 |
| 19 | On load change over switch 200Amp. Open execution type |
| 20 | Fitting of the above components in panel enclosure with terminal blocks, channels, ferrules, thimble, support insulator on bus bar, required hard wares, control wiring in 1.5sq mm wire complete in all respect. |
| 21 | Testing & commissioning of panel, as per required parameters with relevant IS. testing of the panel prior to switching on as follow :- (1) Continuity and earth testing (2) Meggaring of all equipment’s for phase to phase, neutral to body, neutral to earth and phase to earth. (3) Checking for all tightness of nut and bolts (4) Alignments of doors etc. Interlocking tests. All function tests Please Enable Macros to View BoQ information |