| 1 | TOTAL HIRE CHARGES (EXCLUDING FUEL) FOR PROVIDING 1 NO. HLHR (HEAVY LIFT HIGH REACH) HYDRAULIC CRAWLER CRANE WITH LATTICE BOOM & LUFFING JIB, HAVING CRITICAL LOAD LIFTING CAPACITY OF 203MT (MINIMUM) BELOW HOOK AT AROUND 18M (MINIMUM) RADIUS WITH MAIN BOOM CONFIGURATION AND TO OBTAIN CLEAR HEIGHT BELOW HOOK OF 111M (MINIMUM) ABOVE GROUND LEVEL, ON MONTHLY RENTAL BASIS INCLUDING TOTAL MOBILIZATION AND DE-MOBILIZATION CHARGES TOGETHER FOR THE CRANE TO & FROM SITE, AT BHEL-PSER, (2 X 800 MW) DVC KODERMA PROJECT, JHARKHAND- 825421 AS PER TENDER'S SCOPE & SPECIFICATIONS.NOTE: CHARGES ARE EXCEPT FUEL VOLUME-IIIPRICE SCHEDULE, REV-00 Name of Work: PROVIDING 1 NO. HLHR (HEAVY LIFT HIGH REACH) HYDRAULIC CRAWLER CRANE ON MONTHLY RENTAL BASIS AT BHEL- PSER, (2 X 800 MW) DVC KODERMA PROJECT, JHARKHAND- 825421 TENDER NO.: PSER:SCT:KDM-F2436:26:11559 dated 15-06-2026 Name of the Bidder/ Bidding Firm / Company : 0.0 SCH-1 : TOTAL PRICE SL NO DESCRIPTION PRICE SCHEDULE REF TOTAL PRICE (INR) (In Figures)TOTAL PRICE = TOTAL HIRE CHARGES (EXCLUDING FUEL) FOR 1 CRANE FOR 08 MONTHS + MOBILIZATION AND DEMOBILIZATION CHARGES TOGETHER FOR THE CRANE TO & FROM SITE. |
| 2 | TOTAL HIRE CHARGES (EXCLUDING FUEL) FOR PROVIDING 1 NO. HLHR (HEAVY LIFT HIGH REACH) HYDRAULIC CRAWLER CRANE WITH LATTICE BOOM & LUFFING JIB, HAVING CRITICAL LOAD LIFTING CAPACITY OF 203MT (MINIMUM) BELOW HOOK AT AROUND 18M (MINIMUM) RADIUS WITH MAIN BOOM CONFIGURATION AND TO OBTAIN CLEAR HEIGHT BELOW HOOK OF 111M (MINIMUM) ABOVE GROUND LEVEL, ON MONTHLY RENTAL BASIS INCLUDING TOTAL MOBILIZATION AND DE-MOBILIZATION CHARGES TOGETHER FOR THE CRANE TO & FROM SITE, AT BHEL-PSER, (2 X 800 MW) DVC KODERMA PROJECT, JHARKHAND- 825421 AS PER TENDER'S SCOPE & SPECIFICATIONS.NOTE: CHARGES ARE EXCEPT FUEL NOTE |
| 3 | Bidder's total quoted price is at sl. no. 1.0 above. All other amounts/ rates of each item of works in respective schedules/ parts will be derived based on allocated weightages and rates calculated thereof. As such, any uncalled figure/ amount noted at any other place/ schedule of Volume-III will not be recknoed & will stand null & void. |
| 4 | Bidder to note that total price at Sl. No. 1.0 above shall be considered for evaluation & awarding. As such grand total price should be complete in all respect for the full scope defined and considering all terms and conditions. |
| 5 | SCH-2 is the Break-up of Total price. Individual item rate at SCH-2 shall be derived as per allocated weightages against the Total Quoted Price at SCH-1. |
| 6 | Based on the itemwise weightages allocations, the amount for the individual items of the Bill of Quantity shall be arrived at. The rates of individual items shall be derived from the amount against each items after roundeding off. |
| 7 | Bidders to note that this is an item rate contract. Payment shall be made for the actual quantities of work executed at the unit rate arrived |
| 8 | Based on the itemwise weightage allocations, the amount for the individual items of the Bill of Quantity shall be arrived at and item rates calculated thereof. The rates of individual items shall be derived from the amount against each items and its quantity and weightage after rounding off to upto 4 decimal places. However, RA bill payment shall be done after rounding off the gross amount to two decimal points. Any adjustment, if required, due to such methodology, will be effected / adjusted in final bill. |
| 9 | Any item as per scope of work, if not included in the price quoted above and shown separately will not be taken cognizance of and the offer shall be liable for rejection. |
| 10 | Price format shall not be changed by bidder in any case and it may lead to cancellation of their offer. VOLUME-IIIPRICE SCHEDULE, REV-00 Name of Work: PROVIDING 1 NO. HLHR (HEAVY LIFT HIGH REACH) HYDRAULIC CRAWLER CRANE ON MONTHLY RENTAL BASIS AT BHEL- PSER, (2 X 800 MW) DVC KODERMA PROJECT, JHARKHAND- 825421 TENDER NO.: PSER:SCT:KDM-F2436:26:11559 dated 15-06-2026 Name of the Bidder/ Bidding Firm / Company : 0.0 SCH-2: BREAK UP OF TOTAL PRICE SL NO DESCRIPTION QUANTITY UNIT OF MEASUREMENT WEIGHTAGE ITEM RATE (INR) |
| 11 | MONTHLY RENTAL CHARGES (EXCLUDING FUEL) FOR PROVIDING 1 NO. HLHR (HEAVY LIFT HIGH REACH) HYDRAULIC CRAWLER CRANE WITH LATTICE BOOM & LUFFING JIB, HAVING CRITICAL LOAD LIFTING CAPACITY OF 203MT (MINIMUM) BELOW HOOK AT AROUND 18M (MINIMUM) RADIUS WITH MAIN BOOM CONFIGURATION AND TO OBTAIN CLEAR HEIGHT BELOW HOOK OF 111M (MINIMUM) ABOVE GROUND LEVEL, AS PER TENDER'S SCOPE & SPECIFICATIONS EXCLUDING MOBILIZATION AND DE-MOBILIZATION CHARGES. |
| 12 | TOTAL MOBILIZATION AND DE-MOBILIZATION CHARGES TOGETHER FOR THE CRANE TO & FROM SITE. TOTAL 1.0 Please Enable Macros to View BoQ information |