| 1 | De-Centrilized Item |
| 2 | Holding Clamp for SP-55 with N/B |
| 3 | Bracing Clamp Top SP-55 with N/B |
| 4 | Bracing Clamp Bottom SP-55 with N/B |
| 5 | Bracing Clamp for SP-55 with N/B |
| 6 | EARTH WIRE CLAMP FOR SP-55 WITHN/B |
| 7 | S Hook for XLPE Cable rest (GI) |
| 8 | STAY CLAMP FOR SP-55 WITH NUT & BOLT |
| 9 | 11 KV IPC FOR COVERED TO COVERED COND. |
| 10 | 11 KV IPC FOR COVERED TO BARE CONDUCTOR |
| 11 | 11 KV MID SPAN JOINTING KIT |
| 12 | IPC WITH AL. BAIL FOR EARTHING 11KV |
| 13 | 11KV Sus.Ties/Cable Ties on Pin INSULA. |
| 14 | 11KV AAAC COVERED COND. AL-59,99 SQ.MM. |
| 15 | 11 KV TENSION CLAMP WITH BAIL & IPC |
| 16 | NON CENTRALIZED ITEM |
| 17 | FABRICATION OF STEEL |
| 18 | EXCAVATION OF PIT FOR STAY SET |
| 19 | ERECTION OF 11 KV STAY SET |
| 20 | EXCAVATION OF PIT FOR POLE |
| 21 | ERECTION OF SINGLE SP-55 POLE |
| 22 | ERECTION OF SP-55 DOUBLE POLE |
| 23 | GROUTING OF POLE |
| 24 | MUFFING OF POLE |
| 25 | DISMANTLING OF 11 KV LINE(RABBIT) |
| 26 | ERECTION OF BRACKET IN LT LINE |
| 27 | ERECTION OF BRACKET IN 11 KV LINE |
| 28 | LAYING OF RABBIT CONDUCTOR IN HT LINE |
| 29 | GUARDING OF LT/11 KV LINE |
| 30 | CARTAGE SP-55 POLE, 0-20 KM |
| 31 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 32 | LAYING OF 11 KV CABLE POLE TO POLE |
| 33 | FIXING OF IPC WITH AL. BAIL FOR EARTHING |
| 34 | FIXING OF 11KV 90KN TENSION CLAMP B&IPC |
| 35 | FIXING OF 11 KV SUSPENSION TIES |
| 36 | FIXING OF 11 KV MID SPAN JOINTING KIT |
| 37 | FIXING OF 11KV IPC FOR COVERED - COVERED |
| 38 | FIXING OF 11KV IPC COVERED TO BARE COND. |
| 39 | LAYING SPREADING,STRINGING AAAC CONDUCT. |
| 40 | SUPPLY & FIXING OF 11KV J/K 185 SQMM O/D Please Enable Macros to View BoQ information |