|
| 1 | Searching of sewer manholes with metal detector / through pipe internal survey and hiring of JCB machine for excavation and dismantling of RCC slab/footpath and providing requisite labour etc. complete in all respect to the entire satisfaction of Engineer-in-charge. |
| 2 | Providing CCTV survey by Pan Till Camera with zooming and rotating 360 degree of pipe line after desilting and proper cleaning of existing storm water line for inspection and condition of pipe line and submit the soft/hard copy of the result showing the location and date of survey complete in all respect to the entire satisfaction of engineer-in-charge. |
| 3 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) For 1400mm i/d sewer line |
| 4 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) For 1800mm i/d sewer line |
| 5 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) For 1600mm i/d sewer line |
| 6 | Operation and Maintenance of master sewer lines of size 700mm - 1800mm dia. of greater Faridabad from sector-78 to 89 including patrolling and resolve all complaints within 24 hrs.(overflow, blockage by high power super sucker machine/ jetting machine, settlement of sewer line, changing of missing manhole cover with in 04 hrs.) |
| 7 | HSR Items- Master Sewerage Scheme Faridabad- Desilting and Cleaning of Master Sewer Lines of dia. 700mm, 800mm, 900mm, 1400mm,1600mm and 1800mm in Greater Faridabad sector-78 to 89 along with Operation and maintenance for 5 years and all other works contingent thereto. Please Enable Macros to View BoQ information |