| 1 | Credit of Old bricks available during dismantling. |
| 2 | Credit of old Brick Bats to be dismantled. |
| 3 | Less credit old Pumping set and panel board |
| 4 | Less Credit of Old Steel (-) |
| 5 | Supplying, erection, testing and commissioning of Horizontal Split casing pumping set for Raw water motor of capavity 600 X LPM 20.00 m head as per specification of Engineer-In-Charge complete in all respects Make KSB, CRI, Kirtosker, Crompton Greeve, Lubi, Aqua) 600 LPM X 20 M Head |
| 6 | Design, construction, testing and commissioning of 0.50 MLD capacity Water Treatment Plant including inlet channel, Alum dozing Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, Pumping machineries and electric cabling. Control panels entire piping network of suitable size, laying the DI pipe from raw water pump to inlet box of Water Treatment Plant, Water Treatment Plant to Clear Water Tank. and Suction Well for Clear Water including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house include chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per PHED Norms |
| 7 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)DOL Starter :- 1.Main MCCB(ABB/LandT/ SCHNEIDER), Controlling MCB - 2nos2.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01nos3. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 01nos4. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS) - 1each5. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos6. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos7. CT RATIO - 100/5 (AE/KAPPA/LandT)8. CAPACITOR BANK AS PER LOAD REQUIREMENT9. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS)10. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB)11. SINGLE PHASE PREVENTER(SECURE/SELEC/TECHNO/ABB) 600 LPM x 20 Mtr Head = 5 BHP |
| 8 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)START DELTA STARTER :- 1. Main MCCB (ABB/LandT/SCHNEIDER - 01nos2. Controlling MCB - 01nos3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos5. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS)6. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos7. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos9. CAPACITOR BANK AS PER LOAD REQUIREMENT10. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS) - 01 nos11. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB) - 01 nos12. SINGLE PHASE PREVENTER (SECURE/SELEC/TECHNO/ABB) -01 nos13. ELCB BREAKER (ABB/LandT/SCHNEIDER) 1600 LPM x 45 Mtr Head = 30 BHP |
| 9 | Operation and Maintenance upto five years for complete scope of work mentioned in the DNIT as well as existing infrastructures (Disinfection material supplied by PHED) as per schedule-IV after three Months trial run and then 12 months of defect liability period (Operation and Maintenance chargeable to the A/Mtc. estimate) Operation and maintenance during the defect liability period (Operation only) per year |
| 10 | Operation and Maintenance upto five years for complete scope of work mentioned in the DNIT as well as existing infrastructures (Disinfection material supplied by PHED) as per schedule-IV after three Months trial run and then 12 months of defect liability period (Operation and Maintenance chargeable to the A/Mtc. estimate) Operation and Maintenance of 1st Year |
| 11 | Operation and Maintenance upto five years for complete scope of work mentioned in the DNIT as well as existing infrastructures (Disinfection material supplied by PHED) as per schedule-IV after three Months trial run and then 12 months of defect liability period (Operation and Maintenance chargeable to the A/Mtc. estimate) Operation and Maintenance of 2nd Year |
| 12 | Operation and Maintenance upto five years for complete scope of work mentioned in the DNIT as well as existing infrastructures (Disinfection material supplied by PHED) as per schedule-IV after three Months trial run and then 12 months of defect liability period (Operation and Maintenance chargeable to the A/Mtc. estimate) Operation and Maintenance of 3rd Year |
| 13 | Operation and Maintenance upto five years for complete scope of work mentioned in the DNIT as well as existing infrastructures (Disinfection material supplied by PHED) as per schedule-IV after three Months trial run and then 12 months of defect liability period (Operation and Maintenance chargeable to the A/Mtc. estimate) Operation and Maintenance of 4th Year |
| 14 | Operation and Maintenance upto five years for complete scope of work mentioned in the DNIT as well as existing infrastructures (Disinfection material supplied by PHED) as per schedule-IV after three Months trial run and then 12 months of defect liability period (Operation and Maintenance chargeable to the A/Mtc. estimate) Operation and Maintenance of 5th Year |
| 15 | Item Description HSR Item |
| 16 | H.S.R. Items DNIT Name : Pinjokhara village:- DNIT for upgradation of water works, Repair of existing structure, laying of distribution system at village Pinjokhara, Tehsil Tosham, District Bhiwani” Construction of S/S tank, Construction of 2 Nos CWT, Construction of P/chamber, Construction of RCC Suction Scour Well for RW and CW, Pumping Machinery, Construction of sluice valve houdies for proposed S/S Tank, Laying of DI pipe line for Head works, Construction of 0.50 MLD capacity WTP, Re-Construction of Boundary wall, Repair of S/S Tank, Repair/Replacement of existing open inlet channell, Dismantling of existing HLT, Filter Bed, Pump chamber, Distribution system, Construction of Sluice Valve Houdies Operation and Maintenance during defect liability period of 12 months after successful completion of 3 Months trial run and thereafter for 5 years complete in all respect and all other works contingent thereto” Please Enable Macros to View BoQ information |