| 1 | S.E. 1-Construction of Wall |
| 2 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means. |
| 3 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means. |
| 4 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. |
| 5 | Providing and constructing gabain structures for erosion control, river training works and protection works with wire crates of size 2.0m x 1.0m x 0.30m each divided into 1 m compartments by-cross netting, made from 4 mm galvanized steel wire @ 32Kilogramper 10Sq.m having minimum tensile strength of 300Mpa conforming to IS:280 and galvanizing coating conforming to IS 4826, wovan into mesh with double twist, mesh size not exceeding 100 x 100mm, filled with boulders with least dimension of 200mm, all loose ends to be securely tied with 4mm galvanized steel wire etc. complete. |
| 6 | Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching / cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching etc. complete. |
| 7 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources). |
| 8 | Sub Estimate 2 :- Quality control |
| 9 | STONE/ RUBBLE: Crushing Value/Compressive Strength, Water Absorption & Specific Gravity, |
| 10 | SOIL / MURUM: Liquid limit & plastic Limit. |
| 11 | SOIL / MURUM: Compaction Test ( Proctor Density ). |
| 12 | Sub Estimate 3 :-Royalty Charges |
| 13 | Royalty Charges for Earth.(Bidder should Quote the same rate given as per Schedule B in tender document) |
| 14 | Royalty Charges for Metel.(Bidder should Quote the same rate given as per Schedule B in tender document) Please Enable Macros to View BoQ information |