|
| 1 | Supply of required materials for any specific pump while servicing / overhauling the pumps. The contractor shall arrange the required materials promptly, taking utmost care to commission the Pump at the earliest as directed. Gland bolts for stuffing box. |
| 2 | Supply of required materials for any specific pump while servicing / overhauling the pumps. The contractor shall arrange the required materials promptly, taking utmost care to commission the Pump at the earliest as directed. Rubber bushes. |
| 3 | Supply of required materials for any specific pump while servicing / overhauling the pumps. The contractor shall arrange the required materials promptly, taking utmost care to commission the Pump at the earliest as directed. Oil Paper (for locking of all type). |
| 4 | Supply of required materials for any specific pump while servicing / overhauling the pumps. The contractor shall arrange the required materials promptly, taking utmost care to commission the Pump at the earliest as directed. Coupling bolts. |
| 5 | Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 3\\" & 4” dia. valve. |
| 6 | Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 6” dia. valve. |
| 7 | Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 8” dia. valve. |
| 8 | Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 10” dia. valve. |
| 9 | Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 12” dia. valve |
| 10 | Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 80mm dia. valve. |
| 11 | Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 100mm dia. valve. |
| 12 | Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 150mm dia. valve. |
| 13 | Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 250mm dia. valve. |
| 14 | Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 300mm dia. valve. |
| 15 | Replacing bearing of any size for Pump/Motor etc. after removing the old existing bearings as directed. |
| 16 | Re-conditioning of valves of any size as shown and as directed by and replacing the same as directed. |
| 17 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Impeller (Cast Iron) DSM 2E pump |
| 18 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Impeller (Cast Iron) DSM 3ME pump |
| 19 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Impeller (Cast Iron) 3 UP 3 pump |
| 20 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Impeller (Cast Iron) 4 UP 3 pump |
| 21 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Pump Shaft (Material C-40) DSM 2E |
| 22 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Pump Shaft (Material C-40) DSM 3ME |
| 23 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Pump Shaft (Material C-40) 3 UP 3 pump |
| 24 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Pump Shaft (Material C-40) 4 UP 3 pump |
| 25 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Interstage Ring (C.I.) DSM 2E |
| 26 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Interstage Ring (C.I.) DSM 3ME |
| 27 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Casing Ring (C.I.). DSM 2E pump DE/NDE side |
| 28 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Casing Ring (C.I.). DSM 3ME pump DE/NDE side |
| 29 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Casing Ring (C.I.). 3 UP 3 pump DE/NDE side |
| 30 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Casing Ring (C.I.). 4 UP 3 pump DE/NDE side |
| 31 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Shaft Sleeve for (C.I.). 4 UP 3 pump DE/NDE side |
| 32 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Shaft Sleeve for (C.I.). 3 UP 3 pump DE/NDE side |
| 33 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Stuffing box bush (C.I.). DSM 3ME pump |
| 34 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Stuffing box bush (C.I.). 3 UP 3 pump |
| 35 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Gland Followers (C.I.). DSM 2E pump |
| 36 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Gland Followers (C.I.). DSM 3ME pump |
| 37 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Gland Followers (C.I.). 4 UP 3 pump |
| 38 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Gland Followers (C.I.). 3 UP 3 pump |
| 39 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Lantern Ring for all type of pump (Nylon Material) 3 UP 3 pump |
| 40 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Lantern Ring for all type of pump (Nylon Material) 4 UP 3 pump. |
| 41 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Lantern Ring for all type of pump (Nylon Material) DSM 3ME |
| 42 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cartridge (C.I.) DSM 3ME pump DE/NDE side |
| 43 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cartridge (C.I.) 3 UP 3 pump DE/NDE side |
| 44 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cartridge (C.I.) 4 UP 3 pump DE/NDE side |
| 45 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cover (C.I.) DSM 3ME pump DE/NDE side |
| 46 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cover (C.I.) 3 UP 3 pump DE/NDE side |
| 47 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cover (C.I.)4 UP 3 pump DE/NDE side |
| 48 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed .For Dowel pins for bush/casing/ring for all type of pumps. |
| 49 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed .For Impeller key/coupling key for any type of pump. |
| 50 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed . For Nut (steel) for shaft/Bearing/Sleeve/Impeller. DSM 3ME pump DE/NDE side |
| 51 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed . For Nut (steel) for shaft/Bearing/Sleeve/Impeller. 3 UP 3 pump DE/NDE side |
| 52 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed . For Nut (steel) for shaft/Bearing/Sleeve/Impeller. 4 UP 3 pump DE/NDE side |
| 53 | Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Liquid/water Deflector (Rubber) for any type of pump. |
| 54 | Identifying after inspecting the foot valve & assorted fitting, providing and fixing with New Foot valve for any special pump to its suction line. The contractor shall arrange the required material promptly, taking utmost care to commission the same at the earliest. 4” dia. foot valve of Flagged type (C.I.) |
| 55 | Identifying after inspecting the foot valve & assorted fitting, providing and fixing with New Foot valve for any special pump to its suction line. The contractor shall arrange the required material promptly, taking utmost care to commission the same at the earliest. 6” dia. foot valve of Flagged type (C.I.) |
| 56 | P/F a leather washer for 4” dia. foot valve. |
| 57 | P/F a leather washer for 6” dia. foot valve. |
| 58 | Servicing of water pump, including replacement of Gland packing, Greasing of Ball Bearings, Inspection of Alignment of pump , rectification, if necessary, tightening the foundation Nut Bolts as required. Testing the pump operation to run the pump effectively & smoothly. Servicing system shall be done once in a month or as required to the satisfaction of Engineer In-charge for the following capacity. (No extra payment shall be made for gland packing & grease .) Upto 10 H.P. |
| 59 | Servicing of water pump, including replacement of Gland packing, Greasing of Ball Bearings, Inspection of Alignment of pump , rectification, if necessary, tightening the foundation Nut Bolts as required. Testing the pump operation to run the pump effectively & smoothly. Servicing system shall be done once in a month or as required to the satisfaction of Engineer In-charge for the following capacity. (No extra payment shall be made for gland packing & grease .) above 10 H.P. upto 50 H.P. |
| 60 | Overhauling of pump, including de-assembling of pump, Inspection of material parts for Wear and Tear, cleaning of all the parts of pump. Replacement of worn out parts as required ( parts as per the list of Item no.3 & 13 ) , including Ball bearings, Gland packing & Grease. Replacement of rusted and broken Nut Bolts of Foundation & base plate, repairing of priming lines, valves, base plate, etc. Remaining checking & insuring that all parts are fixed at proper places alongwith Do’well pins, locking bearings coupling with lock washer and lock nut, assembling in proper manner & finally doing the True Alignment & Testing the Delivery pressure rating & satisfactory trial etc. all as directed by the Engineer In-charge. (No extra payment shall be made for gland packing & grease.) Upto 7.5 H.P. |
| 61 | Overhauling of pump, including de-assembling of pump, Inspection of material parts for Wear and Tear, cleaning of all the parts of pump. Replacement of worn out parts as required ( parts as per the list of Item no.3 & 13 ) , including Ball bearings, Gland packing & Grease. Replacement of rusted and broken Nut Bolts of Foundation & base plate, repairing of priming lines, valves, base plate, etc. Remaining checking & insuring that all parts are fixed at proper places alongwith Do’well pins, locking bearings coupling with lock washer and lock nut, assembling in proper manner & finally doing the True Alignment & Testing the Delivery pressure rating & satisfactory trial etc. all as directed by the Engineer In-charge. (No extra payment shall be made for gland packing & grease.) 10 HP to 25 H.P. |
| 62 | Overhauling of pump, including de-assembling of pump, Inspection of material parts for Wear and Tear, cleaning of all the parts of pump. Replacement of worn out parts as required ( parts as per the list of Item no.3 & 13 ) , including Ball bearings, Gland packing & Grease. Replacement of rusted and broken Nut Bolts of Foundation & base plate, repairing of priming lines, valves, base plate, etc. Remaining checking & insuring that all parts are fixed at proper places alongwith Do’well pins, locking bearings coupling with lock washer and lock nut, assembling in proper manner & finally doing the True Alignment & Testing the Delivery pressure rating & satisfactory trial etc. all as directed by the Engineer In-charge. (No extra payment shall be made for gland packing & grease.) 25 HP to 50HP |
| 63 | Inspecting the specified pump in connection with Shaft, Sleeve alongwith connected fittings and machining the existing old shaft as per requirement and/or otherwise alongwith sleeve and assorted fittings |
| 64 | Servicing of valves of any type and size inclusive of necessary greasing, gland packing materials, etc. as specified and as directed. |
| 65 | Removing, adjusting, unserviceable 6” dia. old Water Meter from existing locations & connecting the pipe line with 6” dia. Flanged distance piece for restoring Water Supply, transporting the meter from RCF site to BMC Hydraulic Department & back to RCF site and Re-fixing. The tested water meter in position at the existing place after removing the distance piece, etc. as directed. All above job to be got done through BMC’s Licenced Plumber. |
| 66 | Material direct purchase/Parts repaired on lathe machine: Supply/Repair of pump parts as replacement/repair of broken parts etc. as per RCF requirement. (Payment as per actual cost as per tax invoice plus 10% for transporation, handling etc.) |
| 67 | Providing & Supplying, loading, transporting on site, unloading, lowering in trenches and assembling of C.I. specials Conforming IS : 1538 etc complete in all respect and as directed by Engineer in Charge.: Flanged specials upto 300 mm dia |
| 68 | Fabricating ,Supplying & transporting M.S. material of required thickness suitable for lead joint / mechanical joints to site of work , minor fixtures such as man hole frame & covers, pressure and non-pressure type blank flanges, loose flanges, rings, saddle pieces, small pieces to form saddle pieces, collars, clamp collars, bends / tees of various sizes with or without suitable sockets / flanges, small pieces of pipes with or without suitable sockets / flanges, end caps, ladders, platforms, stiffener rings etc. Payment will be made as per actual weight of material. |
| 69 | Providing and fixing CI Mechanical joint split collars suitable for repair of cracks/ leakages of CI/ DI pipes (Inclusive of Odd size pipes) as per RCF specifications complete with sealing rubber gasket made of SBR and galvanized 'T' bolts and nuts. The whole assembly mechanically and Hydraulically tested to the provisions laid down in IS 1538/1993 or IS13382/1992 whichever is applicable. This item includes dewatering of body water cleaning of pipe and arresting leakages etc complete as directed by Engineer in Charge: FOR 80MM DIA PIPES |
| 70 | Providing and fixing CI Mechanical joint split collars suitable for repair of cracks/ leakages of CI/ DI pipes (Inclusive of Odd size pipes) as per RCF specifications complete with sealing rubber gasket made of SBR and galvanized 'T' bolts and nuts. The whole assembly mechanically and Hydraulically tested to the provisions laid down in IS 1538/1993 or IS13382/1992 whichever is applicable. This item includes dewatering of body water cleaning of pipe and arresting leakages etc complete as directed by Engineer in Charge: FOR 100MM DIA PIPES |
| 71 | Providing and fixing CI Mechanical joint split collars suitable for repair of cracks/ leakages of CI/ DI pipes (Inclusive of Odd size pipes) as per RCF specifications complete with sealing rubber gasket made of SBR and galvanized 'T' bolts and nuts. The whole assembly mechanically and Hydraulically tested to the provisions laid down in IS 1538/1993 or IS13382/1992 whichever is applicable. This item includes dewatering of body water cleaning of pipe and arresting leakages etc complete as directed by Engineer in Charge: FOR 150MM DIA PIPES |
| 72 | Supply of single phase quarter turn electric actuator with butterfly valve of Flowtork/ Marsh make or equivalent : Actuator model : QFT03 , Size -80 mm, For on /off Application |
| 73 | Supply of single phase quarter turn electric actuator with butterfly valve of Flowtork/ Marsh make or equivalent : Actuator model : QFT05, Size -100 mm, For on /off Application |
| 74 | Supply of single phase quarter turn electric actuator with butterfly valve of Flowtork/ Marsh make or equivalent : Actuator model : QFT05,Size -150 mm, For on /off Application |
| 75 | Supply of single phase quarter turn electric actuator with butterfly valve of Flowtork/ Marsh make or equivalent : Actuator model : QFT05,Size -200 mm, For on /off Application |
| 76 | Supply butterfly valve only with lever of Flowtork/ Marsh make or equivalent 80 mm Butterfly valve only with lever |
| 77 | Supply butterfly valve only with lever of Flowtork/ Marsh make or equivalent 100 mm Butterfly valve only with lever |
| 78 | Supply butterfly valve only with lever of Flowtork/ Marsh make or equivalent 150 mm Butterfly valve only with lever |
| 79 | Supply butterfly valve only with lever of Flowtork/ Marsh make or equivalent 200 mm Butterfly valve only with lever |
| 80 | Supply of 230vac 50hz, with RC network motor, of Flowtork/ Marsh make or equivalent : 230vac 50hz, with RC network motor, QFT 03 |
| 81 | Supply of 230vac 50hz, with RC network motor, of Flowtork/ Marsh make or equivalent : 230vac 50hz, with RC network motor, QFT 05 |
| 82 | Supply of 230vac 50hz, with RC network motor, of Flowtork/ Marsh make or equivalent : 230vac 50hz, with RC network motor, QFT 10 |
| 83 | Supply of 230vac 50hz, with RC network motor, of Flowtork/ Marsh make or equivalent : 230vac 50hz, with RC network motor, QFT 20 |
| 84 | Supply 2 feet Extension rod for actuator |
| 85 | Supply of Labours for 8 hrs, with necessary tools for odd & unmeasurable jobs such as fixing of parts accessories/ fittings after necessary removal etc. (Which is not covered under respective items as specified and as directed. Skilled worker including welder, gas cutter etc. with tools & tackles such as gas for cutting and welding machine with welding rods, if required. (981*1.25=1226.25) |
| 86 | Supply of Labours for 8 hrs, with necessary tools for odd & unmeasurable jobs such as fixing of parts accessories/ fittings after necessary removal etc. (Which is not covered under respective items as specified and as directed. Unskilled worker whereever required. (Helpers / rigger) (832.5*1.25=1040.63) |
| 87 | For day to day monitoring of Township water supply system including rectification or minor trobleshooting of automation system of values, Panels located in all six pump houses etc, keeping check on pump houses water tanks Maintainging water meter readings, checking levels of water tanks at all six pump houses, Township buildings etc (timiing 06:00 Hrs to 22:00 Hrs) or round the clock whereever required as dirtected by EIC. Please Enable Macros to View BoQ information |