| 1 | Dismentling of C.C. road (As per Vibhagiy rate Sanction in 2025-26) (A) For sewer Line 250 mm dia (B) For M.H. |
| 2 | Excavation Of Foundation in ordinary soils wit supply of Lab, T&P etc all complete. (As per Vibhagiy rate Sanction in 2025-26) (A) For sewer Line 250 mm dia (B) For M.H |
| 3 | Concrete work with 20 guage Brick Blast. L.sand & Cement in foundation Under floors in prop. Of 10:5:1 including supply Lab, T&P etc all complete. (As per Vibhagiy rate Sanction in 2025-26) (A) For sewer Line 250 mm dia (B) For M.H |
| 4 | Making Barricading Arrangment with sal, Ballies Lab,supply of Lab T&P etc all complete. (As per Vibhagiy rate Sanction in 2025-26) (A) For S.L. (B) For M.H. |
| 5 | 1st class Brick work in 1:4 cement sand , Mortar with supply of Lab, Mat, etc all complete.(As per Vibhagiy rate Sanction in 2025-26) |
| 6 | 12 mm thick plaster with 1:4 cement, Sand mortor with supply of Lab, Mat T&P etc all complete. (As per Vibhagiy rate Sanction in 2025-26) |
| 7 | Providing Bier to Retain Sewage water etc all complete.(As per Vibhagiy rate Sanction in 2025-26) |
| 8 | R.C.C. work cement, C Sand & 2 cm stone Ballast in slab Prop. Of 1:1:5: in slab including supply of lab, Mat etc all complete. ( As per UPJN 2023 24 item code 1019) |
| 9 | Mild Steel Iron work in slab.( As per UPJN 2023 24 item code 1150) |
| 10 | Bailing out of water with 5 H.P. Mud pump including all accessories complete..(As per Vibhagiy rate Sanction in 2025-26) |
| 11 | Cast, Cement ,Concrete for seat fixing in 1:2:4 cement, sand stone with Supply of Lab, Mat, T&P etc all complete..(As per Vibhagiy rate Sanction in 2025-26) |
| 12 | S/L/J of R.C.C. hume pipe 250m.m. dia including supply of Lab, Mat, T&P etc all complete..(As per Vibhagiy rate Sanction in 2025-26) |
| 13 | Making Sewer Line connection with supply of Lab, Mat, T&P etc all complete. |
| 14 | S/F of M.H. R.C.C. frame. 675*75.(As per Vibhagiy rate Sanction in 2025-26) |
| 15 | S/F of M.H. R.C.C. frame. 675*75.(As per Vibhagiy rate Sanction in 2025-26) |
| 16 | Disposal of Surplus earth 10% of Excavated earth etc all complete. |
| 17 | Unforseen work as cartage of Pipe with Loading/Unloading etc all complete. Please Enable Macros to View BoQ information |