Defence Statutory Bodies & Commissions/Committees Closing in 2 days TDR #55978006

Tender For Special Repair To Ups Against Ber Installed At Ahrr Under Ge (E/M) R&R Delhi Cantt-10

Issued by Statutory Bodies & Commissions/Committees · Delhi, Delhi
Tender Value
3 Crore
Estimated cost
Bid Submission
11 Jul 2026
2 days left
EMD
3.75 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Special Repair To Ups Against Ber Installed At Ahrr Under Ge (E/M) R&R Delhi Cantt-10

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 20-Jun-2026 Amendment No 1 Date 04-Jul-2026
2 04-Jul-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 11-Jul-2026

BOQ

Name of Work:- SPL REPAIR TO UPS AGAINST BER INSTALLED AT AHRR UNDER GE (E/M) R&R DELHI CANTT-10
Sl. No. Item Description
1Supplying, installing, testing and commissioning of 100 KVA 3-Ph Input / 3-Ph Output True Online, Modular type, Medical grade, having suitable output isolation transformer, double conversion PWM IGBT-based UPS System, suitable for critical applications requiring high availability. The UPS shall be based on DSP-controlled three-level inverter topology and operate in tower installation mode. The system shall support parallel scalability up to 6 units in N+1 configuration. Input voltage shall be 400V AC, 3-phase, 4-wire with a wide operating range of 340V to 477V and frequency range from 40Hz to 70Hz complete all as specified, directed and comprising of the following specifications :-(a) The output shall be 415V AC, 3-phase, delivering rated power of 100 kW at unity power factor. The inverter shall offer a crest factor of minimum 2.5:1 with THDv<2.0% on linear loads and voltage regulation within ±1%. Inverter overload capability shall include <105% continuous, <110% for 60 minutes, <125% for 10 minutes, <150% for 1 minute, and >150% for 200ms. Transfer from mains to battery shall be seamless (0 ms), while inverter-to-bypass transfer shall be synchronous ≤0 ms and asynchronous ≤20 ms.
2(b) Efficiency shall be up to 96% in double conversion mode and 99% in ECO mode. The UPS shall support battery bus voltage from 360 V to 600 VDC or as per OEM recommendations, and suitable battery charger. Compatible battery types include SMF VRLA, Tubular, and Li-ion. Noise level shall not exceed 65 dB at 1 meter. (c) UPS Operating temperature range shall be 0°C to 40°C, and storage temperature -40°C to +70°C (without battery), -25°C to +55°C (with battery). Relative humidity shall be 5% to 95% non-condensing. System shall operate without derating up to 1000 m altitude; above that, derate by 1% per 100 m.(d) The system shall feature a graphical LCD display capable of storing up to 256 events. Data must be transferred to CMS via SNMP or RS232/ RS485/ Modbus (serial/RCP/IP) or as per OEM recommendations. (e) UPS enclosure shall be IP20/IP21 rated with rear cable entry, forced-air cooling, and powder-coated black texture finish.
3(f) UPS must comply with IEC 62040-1 (safety), IEC 62040-2 (EMC). It shall also meet ISO 9001:2015 for quality and ISO 14001 for environmental management. Vendor must provide full spare and service support for at least 10 years from the date of product discontinuation.(g) The contractor shall submit a Manufacturer’s Authorization Form (MAF) from the OEM of the UPS, covering all warranties, along with the technical bid.(h) Make & Model of the UPS : Schneider- Easy UPS 3M, Vertiv- Liebert EXM2-100KVA, ABB DPA 500-100KVA
4Supplying, installing, testing and commissioning of 30 KVA 3-Ph Input / 3-Ph Output True Online, Modular type, Medical grade, having suitable output isolation transformer, Double Conversion IGBT-based UPS System, suitable for OT & Lighting Application. UPS shall be based on DSP-controlled Three-Level Inverter technology (VFI-SS-III topology) with Cold Start and Soft Start feature. The system shall support battery backup testing without switching OFF Input Breaker. UPS must operate on generator supply with provision for separate mains and bypass input, and comply with IEC 62040-3 standards. System must offer inverter output at unity power factor with <2% THD (linear load) and <5.5% (non-linear load), pure sinewave output and capability to handle 110% load for 60 mins, 125% for 10 mins, and 150% for 1 min. UPS efficiency shall be >96% at 100% linear load. Transfer time from AC to Battery shall be zero, complete all as specified, directed and comprising of the following specifications :-(a) UPS shall support SMF VRLA battery bank with flexible DC bus (384–480V), batteries ranging 65AH–200AH. It must support operation with up to 2 battery failures without shutdown, and provide battery protection via circuit breaker with fuse, DC undervoltage trip, and EPO. Charger shall support minimum 10% AH rating and charge battery to 90% within 10 hours. Note : If, OEM is not manufacturing 30 KVA UPS system, the contractor shall provide the next standard one with higher capacity without any extra cost.
5(b) The system must include intuitive LCD display with UPS status, I/O voltage, battery level, breaker status, and fault logs (upto 500 events). Alarm conditions must include Mains Fail, Rectifier Fail, Inverter Fail, Low Battery, Over Temp, Fan Fail, etc. UPS must include REPO (EPO) switch and support SNMP, Modbus (serial/TCP/IP). (c) System shall have automatic bypass on overload / fault conditions and facility for bypass enable / disable. Cabinet shall be IP20 rated with bottom cable entry. UPS must operate in 0–40°C without derating, support 20–90% RH non-condensing, and have noise level <65 dBA at 1m.(d) UPS shall comply with IEC 62040-1, IEC 62040-2, ISO 9001:2015, ISO 14001:2015, ISO 45001:2018. Surge protection per IEC 62040-2. Input, Output and Earth cabling by client using ISI-marked multi-strand flexible copper cable. The earth resistance shall be monitored and displayed continuously using smart earth resistance monitoring system. Warranty: 1 Year. OEM must provide service and spare support for 10 years after product discontinuation.(e) The contractor shall submit a Manufacturer’s Authorization Form (MAF) from the OEM of the UPS, covering all warranties, along with the technical bid.(f) Make & Model of the UPS : Schneider Easy UPS 3-Phase Modular-30KVA, Vertiv Liebert APM2 Series-30KVA, ABB Conceptpower DPA-30 KVA Please Enable Macros to View BoQ information
6(b) The system must include intuitive LCD display with UPS status, I/O voltage, battery level, breaker status, and fault logs (upto 500 events). Alarm conditions must include Mains Fail, Rectifier Fail, Inverter Fail, Low Battery, Over Temp, Fan Fail, etc. UPS must include REPO (EPO) switch and support SNMP, Modbus (serial/TCP/IP). (c) System shall have automatic bypass on overload / fault conditions and facility for bypass enable / disable. Cabinet shall be IP20 rated with bottom cable entry. UPS must operate in 0–40°C without derating, support 20–90% RH non-condensing, and have noise level <65 dBA at 1m.(d) UPS shall comply with IEC 62040-1, IEC 62040-2, ISO 9001:2015, ISO 14001:2015, ISO 45001:2018. Surge protection per IEC 62040-2. Input, Output and Earth cabling by client using ISI-marked multi-strand flexible copper cable. The earth resistance shall be monitored and displayed continuously using smart earth resistance monitoring system. Warranty: 1 Year. OEM must provide service and spare support for 10 years after product discontinuation.(e) The contractor shall submit a Manufacturer’s Authorization Form (MAF) from the OEM of the UPS, covering all warranties, along with the technical bid.(f) Make & Model of the UPS : Schneider Easy UPS 3-Phase Modular-30KVA, Vertiv Liebert APM2 Series-30KVA, ABB Conceptpower DPA-30 KVA Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 55978006
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 3 Crore
LAST DATE 11-07-2026
Authority
Authority Name Military Engineer Services
Work Description Tender For Special Repair To Ups Against Ber Installed At Ahrr Under Ge (E/M) R&R Delhi Cantt-10
Basic Detail
Tender No CEDZ/TOKEN-32 OF 2025
Bidding Type Tender
Location
City Delhi
State Delhi
Key Dates
Publish Date 04 Jul 2026
Submission Date 11 Jul 2026
Open Date 16 Jul 2026
Finance
Tender Value 3 Crore
Tender Fee 2000
EMD 3.75 Lakhs
Exemption Available
Document List
ae2b22e9-d41d-46c7-b1b9-b6484aa97cb1.html
BOQ_864549.xls
tender83183.rar
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 04, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 04, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 11, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 2 days
Jul 11, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Jul 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
html

ae2b22e9-d41d-46c7-b1b9-b6484aa97cb1.html

xls

BOQ_864549.xls

rar

tender83183.rar

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders