| 1 | (A) Supply Part-11/.4 KV 100 KVA DISTRIBUTION SUB STATION |
| 2 | 11/.4 KV 100KVA DTR (REC Sep. ord 11/1976 |
| 3 | Prov. ST Pole Pole 9 Mtr. Long W/L 220Kgs |
| 4 | Muff for steel tubular pole with concrete filling |
| 5 | X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 6 | MS A.I.(50X50x6 mm), Length: 2800 mm x(2 Nos for LA's ) |
| 7 | X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 8 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for transformer bed |
| 9 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer] |
| 10 | MS A.I.(50X50x6 mm), Length: (2800 mm) x 1 No. |
| 11 | MS A.I.(50X50x6 mm), Length: (950 mm) x 2 Nos. of bed knee bracing |
| 12 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x2 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
| 13 | G.I. Wire for Earthing |
| 14 | MS Angle Iron (50X50x6 mm), Length : (450 mm)x1 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
| 15 | G.O. Switch handle supporting: [C.I. (75x40x6mm), length: 460mm for Transformer LT Distribution Box and G.O switch fixing assembly |
| 16 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
| 17 | D.O Fuse unit |
| 18 | Surge Arrester, 9 kV Station Class |
| 19 | Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) |
| 20 | Stay set complete |
| 21 | Stay wire (7/3.15mm)( 10 Kg per stay set) |
| 22 | Pipe earthing with GI,Charcoal & Salt |
| 23 | Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 100KVA Trf. as per specification |
| 24 | Half clamp (M.S. Flat 50x6) |
| 25 | Full clamps (M.S. Flat 50x6) |
| 26 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
| 27 | Aluminium Thimbles 300 mm Sq. |
| 28 | Copper Thimble 200 mm sq. |
| 29 | Danger Plate |
| 30 | Barbed wire (REC Sp F 3/1981) |
| 31 | LT Cable 3-1/2 core-185mm sq. |
| 32 | Alluminium Paint |
| 33 | Prov.ACSR, 6/1/3.35 mm |
| 34 | Chain link fencing , angle iron, gate etc. for transfromer fencing |
| 35 | Prov. Transformer Bed plinth for 1x400KVA S/Stn structure complete with CC 1:6:12 R.R. massonery & plastering etc. a/w Chain link fencing, Angle iron Gate etc. for DTR Fencing. |
| 36 | LT Switched caapcitors 36-KVAr for 100 KVA DTR |
| 37 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 38 | Supplying and stacking of good earth at site including royalty and carriage upto 5 k m lead complete (earth measured in stacks will be reduced by 20% for payment). |
| 39 | Fine dressing of the ground. |
| 40 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). |
| 41 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) : Screened through sieve of I.S. designation 20 mm |
| 42 | Filling mixture of earth and sludge or manure in the desired proportion in trenches, flooding with water and leveling (cost of supplying earth and sludge or manure and mixing excluded). |
| 43 | Providing and fixing korean grass turf superior qualitywith earthy 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light, watering with sprinkler and maintenance for 30 days or more till the grass establish properly as per direction of officer incharge. |
| 44 | Finishing walls with Terra kota paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement |
| 45 | Supplying and fixing round stone in kiari (flower border) of flower/grass garden |
| 46 | (A) Erection Part-11/.4 KV 100 KVA DISTRIBUTION SUB STATION |
| 47 | 11/.4 KV 100KVA DTR (REC Sep. ord 11/1976 |
| 48 | Prov. ST Pole Pole 9 Mtr. Long W/L 220Kgs |
| 49 | Muff for steel tubular pole with concrete filling |
| 50 | X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 51 | MS A.I.(50X50x6 mm), Length: 2800 mm x(2 Nos for LA's ) |
| 52 | X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 53 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for transformer bed |
| 54 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer] |
| 55 | MS A.I.(50X50x6 mm), Length: (2800 mm) x 1 No. |
| 56 | MS A.I.(50X50x6 mm), Length: (950 mm) x 2 Nos. of bed knee bracing |
| 57 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x2 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
| 58 | G.I. Wire for Earthing |
| 59 | MS Angle Iron (50X50x6 mm), Length : (450 mm)x1 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
| 60 | G.O. Switch handle supporting: [C.I. (75x40x6mm), length: 460mm for Transformer LT Distribution Box and G.O switch fixing assembly |
| 61 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
| 62 | D.O Fuse unit |
| 63 | Surge Arrester, 9 kV Station Class |
| 64 | Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) |
| 65 | Stay set complete |
| 66 | Stay wire (7/3.15mm)( 10 Kg per stay set) |
| 67 | Pipe earthing with GI,Charcoal & Salt |
| 68 | Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 100KVA Trf. as per specification |
| 69 | Half clamp (M.S. Flat 50x6) |
| 70 | Full clamps (M.S. Flat 50x6) |
| 71 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
| 72 | Aluminium Thimbles 300 mm Sq. |
| 73 | Copper Thimble 200 mm sq. |
| 74 | Danger Plate |
| 75 | Barbed wire (REC Sp F 3/1981) |
| 76 | LT Cable 3-1/2 core-185mm sq. |
| 77 | Alluminium Paint |
| 78 | Prov.ACSR, 6/1/3.35 mm |
| 79 | Chain link fencing , angle iron, gate etc. for transfromer fencing |
| 80 | Prov. Transformer Bed plinth for 1x400KVA S/Stn structure complete with CC 1:6:12 R.R. massonery & plastering etc. a/w Chain link fencing, Angle iron Gate etc. for DTR Fencing. |
| 81 | LT Switched caapcitors 36-KVAr for 100 KVA DTR |
| 82 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 83 | Supplying and stacking of good earth at site including royalty and carriage upto 5 k m lead complete (earth measured in stacks will be reduced by 20% for payment). |
| 84 | Fine dressing of the ground. |
| 85 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). |
| 86 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) : Screened through sieve of I.S. designation 20 mm |
| 87 | Filling mixture of earth and sludge or manure in the desired proportion in trenches, flooding with water and leveling (cost of supplying earth and sludge or manure and mixing excluded). |
| 88 | Providing and fixing korean grass turf superior qualitywith earthy 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light, watering with sprinkler and maintenance for 30 days or more till the grass establish properly as per direction of officer incharge. |
| 89 | Finishing walls with Terra kota paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement |
| 90 | Supplying and fixing round stone in kiari (flower border) of flower/grass garden |
| 91 | (B) Supply Part-CT/PT Unit 100 KVA Trf. (1 Nos.) |
| 92 | Prov. 11KV CT-PT unit i.e. PT (1 unit, 11KV/110V):CT (CT PT Unit Ratio(10/5A)) accuracy class 0.5S. |
| 93 | Prov, Energy meter (3 phase, 4 wire) HT CT type for Above |
| 94 | Pvc Multistrand 4 mm Sq. copper wire with 1 inch GI pipe fir concealing |
| 95 | X-Arm: [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for supporting main channel for CT-PT unit |
| 96 | MS Angle Iron (50x50x5 mm), Length : 2800mmx 4 Nos. |
| 97 | MS Angle Iron (35x35x5 mm), Length : 2800mmx 2 Nos. |
| 98 | Half clamp (MS Flat 50x6 mm) |
| 99 | Full clamp (MS Flat 50x6 mm) |
| 100 | Nut & Bolts off size |
| 101 | Aluminium Thimble |
| 102 | copper Thimble |
| 103 | (B) Erection Part-CT/PT Unit 100 KVA Trf. (1 Nos.) |
| 104 | Prov. 11KV CT-PT unit i.e. PT (1 unit, 11KV/110V):CT (CT PT Unit Ratio(10/5A)) accuracy class 0.5S. |
| 105 | Prov, Energy meter (3 phase, 4 wire) HT CT type for Above |
| 106 | Pvc Multistrand 4 mm Sq. copper wire with 1 inch GI pipe fir concealing |
| 107 | X-Arm: [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for supporting main channel for CT-PT unit |
| 108 | MS Angle Iron (50x50x5 mm), Length : 2800mmx 4 Nos. |
| 109 | MS Angle Iron (35x35x5 mm), Length : 2800mmx 2 Nos. |
| 110 | Half clamp (MS Flat 50x6 mm) |
| 111 | Full clamp (MS Flat 50x6 mm) |
| 112 | Nut & Bolts off size |
| 113 | Aluminium Thimble |
| 114 | copper Thimble |
| 115 | (C) Supply Part-HT LINE WITH ACSR 6/1/3.35 mm sq. ON STEEL POLES (0.430 KM) for 100 KVA |
| 116 | ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 117 | Prov. ST Pole Pole 10 Mtr. Long W/L 300 Kgs for HT span |
| 118 | Muff for steel tubular pole (2000mm long) with concrete filling |
| 119 | X-Arm: [Channel Iron (100x50x6 mm), Length : 1270 mm |
| 120 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2340 mm |
| 121 | MS A.I.(50X50x6 mm), Length: (750 mm) x 4 No. |
| 122 | prov. 11 KV Pin Insulator (Porcelain , 12 KV , 10KN) : 3 No. per pole structure (insulator suitable for heavily polluted area) |
| 123 | Pole Top Bracket [MSCI:100x50x6mm-100mm] |
| 124 | Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) |
| 125 | X-bracing set MS Angle iron 50x50x6, mength 2125 mmx2 No. |
| 126 | Belt set -MS Angle iron 50x50x6, length 1800 mmx2 No. |
| 127 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
| 128 | Stay set complete in all respect i/c clamp ( Single Pole-1No. , /D. Pole Structures-4Nos.) |
| 129 | Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) |
| 130 | D.O Fuse unit |
| 131 | Prov. HT Earthing set complete |
| 132 | Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 133 | Eye Hook for earth wire |
| 134 | Half clamp (M.S. Flat 50x6) |
| 135 | Full clamps (M.S. Flat 50x6) |
| 136 | Danger Plate (250X200X1.6 mm) |
| 137 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
| 138 | Barbed wire (REC Sp F 3/1981) |
| 139 | Alluminium Paint |
| 140 | (C) Erection Part-HT LINE WITH ACSR 6/1/3.35 mm sq. ON STEEL POLES (0.430 KM) for 100 KVA |
| 141 | ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 142 | Prov. ST Pole Pole 10 Mtr. Long W/L 300 Kgs for HT span |
| 143 | Muff for steel tubular pole (2000mm long) with concrete filling |
| 144 | X-Arm: [Channel Iron (100x50x6 mm), Length : 1270 mm |
| 145 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2340 mm |
| 146 | MS A.I.(50X50x6 mm), Length: (750 mm) x 4 No. |
| 147 | prov. 11 KV Pin Insulator (Porcelain , 12 KV , 10KN) : 3 No. per pole structure (insulator suitable for heavily polluted area) |
| 148 | Pole Top Bracket [MSCI:100x50x6mm-100mm] |
| 149 | Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) |
| 150 | X-bracing set MS Angle iron 50x50x6, mength 2125 mmx2 No. |
| 151 | Belt set -MS Angle iron 50x50x6, length 1800 mmx2 No. |
| 152 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
| 153 | Stay set complete in all respect i/c clamp ( Single Pole-1No. , /D. Pole Structures-4Nos.) |
| 154 | Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) |
| 155 | D.O Fuse unit |
| 156 | Prov. HT Earthing set complete |
| 157 | Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 158 | Eye Hook for earth wire |
| 159 | Half clamp (M.S. Flat 50x6) |
| 160 | Full clamps (M.S. Flat 50x6) |
| 161 | Danger Plate (250X200X1.6 mm) |
| 162 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
| 163 | Barbed wire (REC Sp F 3/1981) |
| 164 | Alluminium Paint |
| 165 | (D) Supply Part-THREE PHASE LT LINE WITH ACSR 6/1/3.35 mm sq. ON STEEL POLES(3.255KM) for 100 KVAS/Stn |
| 166 | ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 167 | Prov. ST Pole Pole 9 Mtr. Long W/L 220Kgs |
| 168 | Muff for steel tubular pole (2000mm long) with concrete filling |
| 169 | Shackle insulators (16KN) (RECD-3/761)(ISS No 1445/1977) |
| 170 | D-iron (U-Clamp) (RECD-4/79)(ISS No 7935/1975) |
| 171 | LT Saty Set Complete REC No 31/1983 |
| 172 | Kit Kat I.C. |
| 173 | Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) |
| 174 | Prov. Full clamp |
| 175 | Earthing set complete Coil Earthing (spec J-1/72) |
| 176 | Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 177 | M.S.Nuts & Bolt off Sizes |
| 178 | Aluminium paint |
| 179 | (D) Erection Part-THREE PHASE LT LINE WITH ACSR 6/1/3.35 mm sq. ON STEEL POLES(3.255KM) for 100 KVAS/Stn |
| 180 | ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 181 | Prov. ST Pole Pole 9 Mtr. Long W/L 220Kgs |
| 182 | Muff for steel tubular pole (2000mm long) with concrete filling |
| 183 | Shackle insulators (16KN) (RECD-3/761)(ISS No 1445/1977) |
| 184 | D-iron (U-Clamp) (RECD-4/79)(ISS No 7935/1975) |
| 185 | LT Saty Set Complete REC No 31/1983 |
| 186 | Kit Kat I.C. |
| 187 | Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) |
| 188 | Prov. Full clamp |
| 189 | Earthing set complete Coil Earthing (spec J-1/72) |
| 190 | Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 191 | M.S.Nuts & Bolt off Sizes |
| 192 | Aluminium paint Please Enable Macros to View BoQ information |