| 1 | Providing of all material, carting from site of work, lowering into trenches with true to alignment, laying and jointing of full length of GI pipe of Following dia B-Medium Class Conferming to IS:1239/2004 including supply of all material , specials with its cutting threading and testing of pipeline etc complete. |
| 2 | 150 mm dia |
| 3 | 100 mm dia |
| 4 | 80 mm dia |
| 5 | 65 mm dia |
| 6 | 50 mm dia |
| 7 | 40 mm dia |
| 8 | 32 mm dia |
| 9 | 25 mm dia |
| 10 | 20 mm dia |
| 11 | 15 mm dia |
| 12 | Supply of HDPE pipe including laying jointing Field testing, commissioning complete at site of HDPE PN-6 (pe100 grade compound)pipe as per IS 4984 and specifications for water application including all cost of material, labour required, transpotation, loading, unloading & stacking etc. |
| 13 | 63 mm dia |
| 14 | 50 mm dia |
| 15 | 90 mm dia |
| 16 | Excavation of earth for Pipe Line of soil mixed with shingle and boulder with lift upto 1.50 m and lead upto 50m including filling back, watering and ramming of Excavated earth in to trenches & all necessary work labour T&P etc complete. |
| 17 | Supply & fixing of Sluice Valve Confirming to IS -14846-2000 (PN -10) |
| 18 | 150 mm dia |
| 19 | 125 mm dia |
| 20 | 100 mm dia |
| 21 | 80 mm dia |
| 22 | Supply and fixing of G.M. Gate valve |
| 23 | 65 mm dia |
| 24 | 50 mm dia |
| 25 | 40 mm dia |
| 26 | 32 mm dia |
| 27 | 25 mm dia |
| 28 | Providing and fixing brass ball cock of approved quality |
| 29 | 20 mm dia |
| 30 | 15 mm dia |
| 31 | Supply & fixing of C.I. Air Valve |
| 32 | 25 mm dia |
| 33 | Installation of temporary stand post including supply of all materials, labour, t&p. etc. including fixing of precast plateform complete and Dismentlling of above after Mela (Precast plateform Shall be provide by Department F.O.C). |
| 34 | Installation of fire hydrants including all necessary fittings, Fixing of above fire hydrants including supply of fixing material such as nut-bolts, rubber packing etc., labour, T&P, etc. (Fire hydrants Shall be provide by Department F.O.C).) |
| 35 | Provision for temporary water connection in camps including supply of all materials, labour, T&P, etc. complete |
| 36 | Supply and fixing of 1000 Litre PVC tank including all arrangements with out let pipe and Inlet pipe pipe, specials, etc at site complete. |
| 37 | Supply & fixing and cartage of M.S. stand for tank of size 2.70 x 2.70 x 2.70 Mtr.approximate weight 7.0 Qtl.for tank including all arrangements |
| 38 | Provision for gang for maintenance of pipe line during Kumbh mela for repair of leakages etc. in three shifts complete.( For 120 Days ) (Fitter - 1, junior Fitter - 2 , Beldar - 8) in one Shift |
| 39 | Fitter |
| 40 | Junior fitter |
| 41 | Beldar |
| 42 | Supply and fixing of 500 Litre PVC tank including all arrangements with out let pipe and Inlet pipe pipe, specials, etc at site complete |
| 43 | Supply & fixing and cartage of M.S. stand of size 1.20 x 1.8 x 1.5 Mtr.approximate weight 2.80 Qtl. for tank including all arrangements . |
| 44 | Provision for arrangment and fixing of 5000 Litre PVC tank including supply and fixing of all arrangements with out let pipe and Inlet pipe pipe, specials, etc complete |
| 45 | Supply & fixing and cartage of M.S. stand of size 2.70 x 2.70 x 3.60 Mtr.approximate weight 8.0 Qtl.for tank including all arrangements |
| 46 | Supply, installation, testing and commissioning of two tap water cooler as per IS:1475 (ISI Marked) of cooling capacity 150 LPH at rated condition and storage tank material SS 304 with capacity of 300 liters, (i.e. 150/300 water cooler) of well known brand including inbuilt water purification system around 200 LPH potable water with comprehencive warranty of whole unit for one year |
| 47 | Supply and fixing of 5000 Litre PVC tank including all arrangements with out let pipe and Inlet pipe pipe, specials, etc at site complete |
| 48 | Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design. |
| 49 | With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 |
| 50 | Dismentling of following size of Pipe Line cleaning stacking and carting back to storeG.I. (Medium) Pipe |
| 51 | 150 mm dia |
| 52 | 100 mm dia |
| 53 | 80 mm dia |
| 54 | 65 mm dia |
| 55 | 50 mm dia |
| 56 | 40 mm dia |
| 57 | 32 mm dia |
| 58 | 25 mm dia |
| 59 | 20 mm dia |
| 60 | 15 mm dia |
| 61 | Dismantling of C.I. sluice valve including stacking of useful materials within a lead of 50 metres |
| 62 | Up to 150 mm diameter |
| 63 | Above 150 mm diameter |
| 64 | Dismentling of G.M. Gate valve |
| 65 | Up to 65 mm diameter |
| 66 | Dismentling of brass ball cock |
| 67 | 15 mm to 20 mm dia |
| 68 | Dismantling of C.I. Air Valve up to 25 mm dia |
| 69 | dismentling of fire hydrant |
| 70 | dismentling of water connection |
| 71 | dismentling of PVC Tank |
| 72 | dismentling of pillary type stand post and carting to divisional store. |
| 73 | dismentling of water cooler with filter |
| 74 | Cartage of dismantled materials such as pipes/specials/sluice valve/ air valves etc. from camping site to divisional store. For 5.0 km |
| 75 | Stacking of dimantled material in divisional store |
| 76 | E & M WorksMOTI CHOOR (EXISTING MINI TUBEWELL)Development of TW by 250 PSI/900 CFM Air compressor as below including Erection of compressor at site of work. |
| 77 | Running of compressor for development and testing of tube well. |
| 78 | Development of TW by suitable size of OP Unit as below including Erection of OP Unit and camp equipage at site of work. |
| 79 | Lowering of suitable size submersible pump motor set with column pipe and running of D.G. Set, running of OP Unit for development and yield test of tube well. |
| 80 | Cost of hiring charges for 25 KVA D.G. set including cartage up to site and installation and providing operator (24x7) for 4 Months. |
| 81 | Fuel cost for average 2 Hrs. running per day for 4 Months. |
| 82 | Cable for D.G Set of size 1 x 3 x 6 mm 2 submersible cable from change over Switch To D.G. set |
| 83 | MOTI CHOOR (NEW HAND PUMP-03)Transportation of suitable truck mounted ODEX drilling rig machine with all necessary connection T&P required for drilling including installation and leveling of Rig machine etc.complete in all respect as per direction of Engineer incharge. |
| 84 | Drilling of bores as per IS 2800-1979 using ODEX 115 (Tubex) attachment required drilling in alluvial, boulder, pebbles, gravel, rockey stone, sticky clay etc. including cost of attachement consumable stores, bits, water POL etc.complete with system of simultaneous lowering of 125 mm nominal bore 5.4 mm thick MSERW fin cut casing pipe complete in all respect as per direction of Engineer-In-charge. |
| 85 | Supply & Fixing of 125 mm dia 5.4 mm thick as per IS 1239/4270 MSERW fin cut casing pipe from approved manufacturers complete in all respect. |
| 86 | Supply and fixing of suitable Casing shoe of EN-24 Steel as per requirement of ODEX Attachment complete in all respect. |
| 87 | Chemical & Becteriological test of water sample |
| 88 | S/F of Single phase 1 HP submersible pump set . |
| 89 | S/F of 1 HP Starter Panel. |
| 90 | S/F 32 mm size PVC flexible pipe. |
| 91 | S/F 1.5 sq.mm single core, copper cable. |
| 92 | S/F of PVC elbow, nipple, cap etc. |
| 93 | Provision of maintenance staff ( for mini Tubewell -01nos Existing Hand Pump-01, 02, New Hand Pump-01) for 04 months. |
| 94 | Pump Operator-12 nos (3X8X7 base) |
| 95 | SAPTH RISHI EXISTING MINI TUBEWELLDevelopment of TW by 250 PSI/900 CFM Air compressor as below including Erection of compressor at site of work. |
| 96 | Running of compressor for development and testing of tube well. |
| 97 | Development of TW by suitable size of OP Unit as below including Erection of OP Unit and camp equipage at site of work. |
| 98 | Lowering of suitable size submersible pump motor set with column pipe and running of D.G. Set, running of OP Unit for development and yield test of tube well. |
| 99 | Cost of hiring charges for 25 KVA D.G. set including cartage up to site and installation for 4 Months. |
| 100 | Fuel cost for average 2 Hrs. running per day 4 Months. |
| 101 | Cable for D.G Set of size 1 x 3 x 6 mm 2 submersible cable from change over Switch To D.G. set |
| 102 | SAPTH RISHITransportation of suitable truck mounted ODEX drilling rig machine with all necessary connection T&P required for drilling including installation and leveling of Rig machine etc.complete in all respect as per direction of Engineer incharge. |
| 103 | Drilling of bores as per IS 2800-1979 using ODEX 115 (Tubex) attachment required drilling in alluvial, boulder, pebbles, gravel, rockey stone, sticky clay etc. including cost of attachement consumable stores, bits, water POL etc.complete with system of simultaneous lowering of 125 mm nominal bore 5.4 mm thick MSERW fin cut casing pipe complete in all respect as per direction of Engineer-In-charge. |
| 104 | Supply & Fixing of 125 mm dia 5.4 mm thick as per IS 1239/4270 MSERW fin cut casing pipe from approved manufacturers complete in all respect. |
| 105 | Supply and fixing of suitable Casing shoe of EN-24 Steel as per requirement of ODEX Attachment complete in all respect. |
| 106 | Chemical & Becteriological test of water sample |
| 107 | S/F of Single phase 1 HP submersible pump set . |
| 108 | S/F of 1 HP Starter Panel. |
| 109 | S/F 32 mm size PVC flexible pipe. |
| 110 | S/F 1.5 sq.mm single core, copper cable. |
| 111 | S/F of PVC elbow, nipple, cap etc. |
| 112 | Provision of maintenance staff ( for Existing mini Tubewell -01 nos, New Hand Pump-01) for 04 months. |
| 113 | Pump Operator-12 nos (3X8X7 base) Please Enable Macros to View BoQ information |