| 1 | STP Pole 11 Mtr.Long |
| 2 | STP Pole 13 Mtr.Long SP -72 |
| 3 | STP Pole 9 Mtr.Long |
| 4 | V-Type steel Cross Arm for 33 KV |
| 5 | V-Type Cross Arm 11 KV |
| 6 | 11 KV V-Type Cross Arm Clamp |
| 7 | 11 KV Pin Insulator Polymer |
| 8 | 11 KV Pin Insulator with Pin |
| 9 | 11 KV Disc Insulator with Fitting |
| 10 | 33 KV Pin Insulator with pin |
| 11 | 33 KV Pin with Nut |
| 12 | 33 KV Disc Insulator B&S type 7000 kg |
| 13 | 33 KV Disc Fitting for Dog 7000 kg |
| 14 | F Bracket 33 KV Line |
| 15 | F Bracket 11 KV Line |
| 16 | ACSR Dog Conductor |
| 17 | ACSR Weasel Conductor |
| 18 | 11 KV XLPE Cable 3x185 sq.mm |
| 19 | Cable Box O/D 3x185 Sq.mm. for XLPE 11 KV |
| 20 | Earthing Complete |
| 21 | Stay Complete With Grouting 33 KV Line |
| 22 | Stay Complete |
| 23 | Distribution Box 3 Phase |
| 24 | 11 KV Fuse Set |
| 25 | LT ABC Cable (3x95+1X70+1x16) Sq.mm. |
| 26 | LT ABC Cable (3x120+1X95+1x16) Sq.mm. |
| 27 | 11 KV TPMO Complete |
| 28 | Stone Pad 300x300x75mm |
| 29 | V-Type steel Cross Arm Clamp for 33 KV |
| 30 | T-Off Channel |
| 31 | T-Off Channel Clamp |
| 32 | Nut Bolt & Washer |
| 33 | Danger Board with Clamp & NB |
| 34 | Barbed Wire GI |
| 35 | Number Plat With Clamp |
| 36 | Alluminium Binding Wire |
| 37 | Alluminium Paint |
| 38 | Red Oxide |
| 39 | Concreating Of Pole |
| 40 | Top Channel 125x65 mm 3200 mm with Clamps |
| 41 | Top Channel 100x50x2240 mm2 Nos Clamps |
| 42 | M.S. Angle 65x65x6 Bracing With 4 Nos. Clamp 33 KV |
| 43 | M.S. Angle 65x65x6 Bracing With 4 Nos. Clamp 11 KV |
| 44 | CONCRETING OF STAY |
| 45 | PG Clamp For dog Conductor |
| 46 | PG Clamp For Conductor |
| 47 | E Bracket For 11 KV |
| 48 | Clamp for Top Channel |
| 49 | Top Channel |
| 50 | Clamp With Nut & Bult For Top Dropper |
| 51 | Dropper Channel |
| 52 | Suspension Clamp |
| 53 | EYE Hook |
| 54 | J Hook |
| 55 | Dead End Clamp |
| 56 | Distribution Box Clamp |
| 57 | T/F Base Angle |
| 58 | Holding Clamp |
| 59 | LT Insulator Pearsing Conector |
| 60 | LT Clamp with N&B |
| 61 | LT Fuse Set for 25 KVA With SMC Box complete |
| 62 | LT Fuse Set 63 KVA With SMC Box complete |
| 63 | LT Fuse Set For 100 KVA With SMC Box complete |
| 64 | LT PVC Cable 4x16 Sq.mm. |
| 65 | LT PVC Cable 3.5x70/35 Sq.mm. |
| 66 | LT PVC Cable 3.5x150/70 Sq.mm. |
| 67 | LT Incoming panel with metering equipment & fixing arrangement LS |
| 68 | Copper L-piece 50x225x10mm (L.S) |
| 69 | Copper L-piece 62x225x12mm (L.S) |
| 70 | LT PVC Cable AL3.5x400 sq mm |
| 71 | LT PVC Cable AL1x400 sq mm |
| 72 | LT PVC Cable AL1x240 sq mm |
| 73 | AL Leg long barrel off Size (LS) |
| 74 | 4 Core LT MCB with box (LS) |
| 75 | Neutral cum Earth Wire |
| 76 | Construction of distribution Transformers Plinth of size 5’x5x4’ above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly after that a retaining wall of 9” width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. jall of 12 mm M.S. tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the Plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer. It including the cost of all material, labour T&P, carrier etc. required for proper completion of work. |
| 77 | Body and neutral earthing of distribution Transformers installed by digging of pit up to water level depth (approx. 100’) and then inserting 1-1/4\\" dia G.I. pipe of \\"B\\" grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer including the cost of arrangement of all material, labourer, T&P, carrier etc. required for proper completion of work. |
| 78 | FABRICATION & ERECTION OF FENCING AND CONSTRUCTION OF RETAINING WALL AROUND OF TRANSFORMERS.The complete 11/0.4 KV Substation shall be provided with two meter height fencing and retaining wall around the substation. One No. Gate with proper locking arrangement for entry of personnel shall also be provided. The fencing shall be made of 50x25 mm x10 SWG rectangular welded mesh of wire mesh in length. Wire mesh shall be fixed on panels made of 50x50x6 mm M.S. Angle. The wire mesh on panels will be supported by 25x3 mm M.S. flat on all the bracings diagonally and 50x6 M.S. Flat horizontally at the center of the panel. The panel will be joined by bolts & nuts of appropriate size with each other and on the main support on corners including supply of all material, labour, carrier and T & P etc. required for proper completion of work. The painting of complete fencing shall also be done with one coat of red oxide primer and two coat of synthetic green paint. For construction of retaining wall around the fencing, excavation of earth shall be done in foundation in ordinary soil including disposal of surplus earth at some suitable distance. The dimension of excavation shall be 1m wide, 0.45 m deep and suitable length as per wire mesh. After excavation of earth a cement concreted pad shall be laid in foundation. Concreting shall be done with Ist class brick ballast, coarse sand and cement in proportion of 8:4:1. First class brickwork shall also be done in foundation and super structure in 1:6 Cement and coarse sand including necessary cutting and moulding of bricks in foundation depth of wall 0.30 m, thickness of wall 0.35 m & superstructure brick work thickness of wall 0.23 m & depths 0.30 m including supply of all material, labour, carrier and T & P etc. required for proper completion of work. |
| 79 | Dismantling and removal of existing following materials from the various area preparing their coils and then stacking in the respective JE’s (Store)/Store Center Aligarh as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. |
| 80 | ACSR Conductor (Scrap) |
| 81 | Iron Scrap |
| 82 | LT ABC Cable (Scrap) Please Enable Macros to View BoQ information |