Water Resources and Irrigation Government Departments Closing in 7 days TDR #55975660

Tender For Akbar Khul And Arabal Gawer Khul Cluster Irrigation Scheme

Issued by Government Departments · pulwama, Jammu and Kashmir
Tender Value
5.85 Crore
Estimated cost
Bid Submission
20 Jul 2026
7 days left
EMD
17.56 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
pulwama → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Akbar Khul And Arabal Gawer Khul Cluster Irrigation Scheme

BOQ

Name of Work:- Akbar Khul and Arabal Gawer Khul Cluster Irrigation Scheme
Sl. No. Item Description
1Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge 1:3:6 or richer mix (i/c equivalent design mix)
2Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Hard Rock (Blasting Prohibited)
3Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock
4Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
5Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
6Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :1 meter from Cutting edge
7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
8Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
9Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
10Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
11Dumping stone excluding cost of stones. in Horizontal on level
12Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
13Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
14Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
15Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc.
16Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
17Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts.
18Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms.
19CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
20Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
21Structural steel work in single section, fixed with or without connectingplate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
22Structural steel work in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete. Welded
23Providing and fixing of Winch machine with all accessories, fixtures, fastings etc (Complete Job) Including carriage (LMR)
24Fixing of Winch machine with all accessories, fixtures, fastings etc(Complete Job) including carriage (LMR)
25Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm
26Lettering with black Japan paint of approved brand and manufacture.
27Hand-packing stones in wire-crates; excluding cost of crates and stones
28Supply of stones (Nallaha Stone)
29Supply of GI wire Crates of mesh Size 100mmx100mm with 4mm wire dia (tolerance 0.05mm) as per Specification under I.S 280:2006
30Supply and fixing of Binding Wire including carriage.
31Carriage of material by mechanical transport, from source to road site / actual site of work including loading / unloading and stacking Stone aggregate 40mm avg lead 35km
32Carriage of material by mechanical transport, from source to road site / actual site of work including loading / unloading and stacking Stone aggregate 20mm avg lead 35km
33Carriage of material by mechanical transport, from source to road site / actual site of work including loading / unloading and stacking Sand avg lead 35 km
34Carriage of material by mechanical transport, from source to road site / actual site of work including loading / unloading and stacking Cement avg lead 3 km
35Carriage of material by mechanical transport, from source to road site / actual site of work including loading / unloading and stacking Steel avg lead 35 km
36Carriage of material by mechanical transport, from source to road site / actual site of work including loading / unloading and stacking Crate avg lead 50 km
37Carriage of material by mechanical transport, from source to road site / actual site of work including loading / unloading and stacking Stone by avg lead 2 kms
38Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Stone aggregate 20mm avg lead 100m
39Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Sand avg lead 100m
40Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Cement avg lead 100m
41Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Stone aggregate 40mm avg lead 200m
42Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Stone aggregate 20mm avg lead 200m
43Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Sand avg lead 200m
44Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Cement avg lead 200m
45Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Stone aggregate 40mm avg lead 300m
46Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Stone aggregate 20mm avg lead 300m
47Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Sand avg lead 300m
48Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Cement avg lead 300m
49Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Earth avg lead 100m
50Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Stone avg lead 400m
51Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Crate avg lead 200mts
52Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Crate avg lead 300mts
53Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking Steel avg lead 300m Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 55975660
AUTHORITY Government Departments
TENDER VALUE 5.85 Crore
LAST DATE 20-07-2026
Authority
Authority Name Irrigation And Flood Control Department
Work Description Tender For Akbar Khul And Arabal Gawer Khul Cluster Irrigation Scheme
Basic Detail
Tender No e-NIT No 01 of 2026-27
Bidding Type Tender
Location
City pulwama
State Jammu and Kashmir
Key Dates
Publish Date 13 Jun 2026
Submission Date 20 Jul 2026
Open Date 21 Jul 2026
Finance
Tender Value 5.85 Crore
Tender Fee 10000
EMD 17.56 Lakhs
Exemption Not Available
Document List
b05a8b9e-417d-446e-bd68-f7d55009bc49.html
BOQ_1011028.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Jul 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
html

b05a8b9e-417d-446e-bd68-f7d55009bc49.html

xls

BOQ_1011028.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders