|
| 1 | Construction of GLR at School Street in Chinnathambinadaroor Village in Poigai Panchayat in Kadayanallur Pancchayat Union |
| 2 | For Delivery Line Arrangements |
| 3 | Supply and delivery of 40 mm dia 10 KSC PVC pipe |
| 4 | Earth work excavation with an initial lead and lift in hard stiff clay, black cotton, hard red earth, sub murram gravel, stone and earth mixed boulders as per SS20B. |
| 5 | Refilling excavated earth including all cost and Al Lbour charges etc,complete. |
| 6 | Laying of PVC rigid pipes with lead of 200m lowering into trench, laying in proper grade, alignment, jointing PVC coupler with specials and tested to the required pressure including conveyance of water upto 1km lead during the testing. |
| 7 | For GLR Arrangememts |
| 8 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete. |
| 9 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. |
| 10 | Filling with Excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete. |
| 11 | Supplying and filling with sand including cost and conveyance and all labour charges such as watering and ramming etc., complete. |
| 12 | Random Rubble Measonry in CM 1:5 mix using required bond stone with simulataneous pointing including all cost and conveyance and all labour charges etc., complete. |
| 13 | Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete. |
| 14 | Centering charges for RCC works including all cost and conveyance all materials to site etc., complete. |
| 15 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. |
| 16 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete excluding cost of steel without centering. |
| 17 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete |
| 18 | Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete |
| 19 | Exterior Emulsion painting two coats with best approved quality and colour emulsion paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 20 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |