| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed:All kinds of soil. |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed:Ordinary rock. |
| 3 | Providing and laying cement concrete 1:4:8 mix (1 cement:4 course sand :8 graded stone aggregate 40mm nominal size) incl. Curing but cxcl. Cost of form work |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as perapproved design mix, including pumping of concrete to site of laying but excluding thecost of centering, shuttering, finishing and reinforcement, including admixtures inrecommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used asper design mix is content considered payable or recoverable separately.All works above plinth level upto floor V level |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc |
| 7 | Reinforcement for RCC work incl. straightening, cutting Bending , placing in position and binding all complete.(cold twisted bars) |
| 8 | Steel work welded in built up sections/framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 9 | Replacement of damaged window Glass panels |
| 10 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )Dry |
| 11 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )wet |
| 12 | .Carriage of cement by Mechanical Transport from nearest market (to be identified by engineer in charge) to road side of work including cost for loading and unloading.for an av. distance of 30Km and 500 m H/L |
| 13 | .Carriage of Sand by Mechanical Transport from source (to be identified by engineer in charge) to site of work including cost for loading and unloading.for an av. distance of 30Km And 500m H/L |
| 14 | .Carriage of stone aggregate (Crushed) below 40 mm by Mechanical Transport from source (to be identified by engineer in charge) to site of work including cost for loading and unloading.for an av. distance of 30Km and 500m H/L |
| 15 | .Carriage of stone aggregate (Crushed) above 20 mm by Mechanical Transport from source (to be identified by engineer in charge) to site of work including cost for loading and unloading.for an av. distance of 30Km and 500m H/L Please Enable Macros to View BoQ information |