| 1 | Supply, Installation, Testing & Commissioning of 11 Mtr. Long Pole ( ST-410 SP56) |
| 2 | Supply, Installation, Testing & Commissioning of 9 Mtr. Long Pole (ST-410 SP33) |
| 3 | Supply, Installation, Testing & Commissioning of 70 mm² AB (HT) Cable (3x70+1x70 insulated) mm² XLPE (separating the bundled cable into three individual phase conductors, erection/stringing on insulators with necessary clamps, fittings, accessories, testing and commissioning complete in all respects) |
| 4 | Supply, Installation, Testing & Commissioning of 11 kV Heat Shrinkable Outdoor Cable Termination Kit |
| 5 | Supply, Installation, Testing & Commissioning of Suspension/Tension Clamp with eye hook |
| 6 | Supply, Installation, Testing & Commissioning of G I Channel/ Angle/ Flat for cross, braces of sizes including clamps & Nut Bolts |
| 7 | Supply, Installation, Testing & Commissioning of Mucki clamps/LT Shackles with insulators |
| 8 | Supply, Installation, Testing & Commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 3202 |
| 9 | Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip. |
| 10 | Providing and Painting of Poles Red Oxide |
| 11 | Providing and Painting of Poles Aluminium Paint |
| 12 | Provoding of Cement bottoming 1:2:4 mix as per REC Standards 0.66cum /pole |
| 13 | Providing of Cement bottoming of poles 1:2:4 mix as per REC standards 0.48cum /pole |
| 14 | Supply, Installation, Testing & Commissioning of Danger Plates with Clamps for 9 meter HT Poles |
| 15 | Dismantling of 9-Mtr existing HT Poles |
| 16 | Dismantling of Old ACSR 0.05 Conductor |
| 17 | Supply, Installation, Testing & Commissioning of 11KV Link Set (Line Type polymer insulators fitted with solid copper blades) |
| 18 | \\"Providing Geo-tagged Photographs (8'' × 6'') on photo paper along with soft copies before, during, and after execution of the work, complete. Please Enable Macros to View BoQ information |