|
| 1 | Taking down centrifugal pump set from existing position for carrying out repair works and re-assembling, re-installing the pump set after repairs in original position for pump capacity 1/1.5/2.5 HP complete all as specified and as directed. Note: Spare parts, winding wire required for renewal shall be measured and paid separately. |
| 2 | Taking down centrifugal pump set from existing position for carrying out repair works and re-assembling, re-installing the pump set after repairs in original position for pump capacity 60/50 HP complete all as specified and as directed. Note: Spare parts, winding wire required for renewal shall be measured and paid separately. |
| 3 | Taking down centrifugal pump set from existing position for carrying out repair works and re-assembling, re-installing the pump set after repairs in original position for pump capacity 100/120 HP complete all as specified and as directed. Note: Spare parts, winding wire required for renewal shall be measured and paid separately. |
| 4 | Dismantling and opening the motor from pump set in existing position for carrying out rewinding work with new super enamelled copper wire of suitable gauge as per existing and heat varnishing complete with all other material required for rewinding by carrying the motor to outside the cantonement area, reassambling and refixing the same with pump in original position for the 1/1.5/2.5 HP 3 phase, complete all as specified and as directed by Engr-in-Charge. |
| 5 | Dismantling and opening the motor from pump set in existing position for carrying out rewinding work with new super enamelled copper wire of suitable gauge as per existing and heat varnishing complete with all other material required for rewinding by carrying the motor to outside the cantonement area, reassambling and refixing the same with pump in original position for the 60/50 HP 3 phase, complete all as specified and as directed by Engr-in-Charge. |
| 6 | Dismantling and opening the motor from pump set in existing position for carrying out rewinding work with new super enamelled copper wire of suitable gauge as per existing and heat varnishing complete with all other material required for rewinding by carrying the motor to outside the cantonement area, reassambling and refixing the same with pump in original position for the 100/120 HP 3 phase, complete all as specified and as directed by Engr-in-Charge. |
| 7 | Supply only Impeller CI, spare part, for pump set including motor complete for 50 HP centrifugal pump, complete all as specified and as directed. |
| 8 | Supply only Pump shaft, spare part, for pump set including motor complete for 50 HP centrifugal pump, complete all as specified and as directed. |
| 9 | Supply only Neck ring, spare part, for pump set including motor complete for 50 HP centrifugal pump, complete all as specified and as directed.. |
| 10 | Supply only Shaft Sleeve, spare part, for pump set including motor complete for 50 HP centrifugal pump, complete all as specified and as directed. |
| 11 | Supply only Bearings in repairs as per sample, spare part, for pump set including motor complete for 50/60 HP centrifugal pump, complete all as specified and as directed. |
| 12 | Dismantling of all electric water connections lifting of submersible pump and motor including column pipe with the help of chain pulley block for pump capacity 15 HP, opening of pump and motor, cleaning, servicing and replacement of spare parts complete all as specified and as directed. |
| 13 | Material and labour for rewinding work for 3 phase submersible motor of capacity 15 HP with new PVC insulatedd super enammel copper wire of suitable gauge as per existing complete all as specified and as directed. |
| 14 | Supply only Impeller CI, spare part, for pump set including motor complete for 15 HP submersible pump set, complete all as specified and as directed. |
| 15 | Supply only Neck ring, spare part, for pump set including motor complete for 15 HP submersible pump, complete all as specified and as directed. |
| 16 | Supply only Bearing top as per sample, spare part, for pump set including motor complete for 15 HP submersible pump, complete all as specified and as directed. |
| 17 | S & F in repair of nuts and bolts of suitable sizes for fixing in different parts of pump and motor, complete all as specified and as directed. |
| 18 | S & F in repair water proof un armoured multistranded copper cable 70 Sqmm, Single core, single phase, 440 volts, complete all as specified and as directed. |
| 19 | S & F in repair water proof un armoured multistranded copper cable 50 Sqmm, Single core, single phase, 440 volts, complete all as specified and as directed. |
| 20 | S & F in repair water proof un armoured multistranded copper cable 35 Sqmm, Single core, single phase, 440 volts, complete all as specified and as directed. |
| 21 | S & F in repair water proof un armoured multistranded copper cable 25 Sqmm, Single core, single phase, 440 volts, complete all as specified and as directed. |
| 22 | S & F in repair water proof un armoured multistranded copper cable 16 Sqmm, Single core, single phase, 440 volts, complete all as specified and as directed. |
| 23 | S & F in repair water proof un armoured multistranded copper cable 10 Sqmm, single core, single phase, 440 volts, complete all as specified and as directed. |
| 24 | S & F in repair tyre coupling of series F 80 suitable for 50/60 HP centrifugal pumping set complete all as specified and as directed. |
| 25 | S & F in repair tyre coupling of series F 90 suitable for 50/60 HP centrifugal pumping set complete all as specified and as directed. |
| 26 | S & F in repair Rubber star coupling of suitable sizes for fixing in pump, complete all as specified and as directed. |
| 27 | Supply and fixing Copper thimbles of size 25 Sqmm to 50 Sqmm of single core and includingr removing burnt thimbles from existing copper cables and cable make to suitable for fixing new thimbles complete all as specified and directed |
| 28 | S & F 3 HP DOL starter suitable for monoblock pump of capacity 2.5/3/5 HP and compressor of Iron Removal Plant (IRP), complete all as specified and as directed by Engr-in-Charge. Please Enable Macros to View BoQ information |
| 29 | S & F 3 HP DOL starter suitable for monoblock pump of capacity 2.5/3/5 HP and compressor of Iron Removal Plant (IRP), complete all as specified and as directed by Engr-in-Charge. Please Enable Macros to View BoQ information |