| 1 | Providing CC Pavement @ New Union Office in Gingee |
| 2 | Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B |
| 3 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. |
| 4 | Centering charges for corewall including all cost of labour charges |
| 5 | Cement Concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. |
| 6 | Provision for Name board charges |
| 7 | Provision for Photo charges |
| 8 | Providing Plinth Protection Platform @ new Union office in Gingee |
| 9 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. |
| 10 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. |
| 11 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications |
| 12 | Supply and Filling Well Gravel Layer including cost and Conveyence of all charges |
| 13 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS HBG metal to 50 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc, complete. |
| 14 | Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 15 | Painting two coats of newly plastered wall surface with ready mixed Plastic Emulsion Paint of First quality of approved colour over a Priming Coat |
| 16 | Provision for Name board charges |
| 17 | Provision for Photo charges |
| 18 | Providing Fencing Work and Cement Concrete Floor(30000Litre OHT ) with Open Well Cover @ New Union Office in Gingee |
| 19 | Earthwork excavation and depositing on bank with an intial lesd & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed 0.0 - |
| 20 | Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. |
| 21 | Cement concrete in 1:2:4 mix using 20 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. |
| 22 | Chain fensing (2x2) using 10kg galvanized iorn wire) including cost and conveyence all material at site and labour charges etc completed |
| 23 | Rcc Post (0.15x0.15x2.1) |
| 24 | Supply and Fixing Steel Door including all charges |
| 25 | Towards labour Charges for fixing Chain Link Fencing |
| 26 | Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B |
| 27 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. |
| 28 | Centering charges for corewall including all cost of labour charges |
| 29 | Cement Concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. |
| 30 | Toward cost and Supply of Langle 50mmx50mm |
| 31 | Toward cost and Supply of Langle 35mmx35mm |
| 32 | Toward cost and Supply Welt Mesh Allround |
| 33 | Towards conveyence and Fixing charges |
| 34 | Towards Labour charges Cleaning Open Well |
| 35 | Towards Labour charges Welting |
| 36 | Provision for Photo charges |
| 37 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |