| 1 | Earth work in excavation by mechanical means (Hydraulicexcavator) / manual means in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) includingdressing of sides and ramming of bottoms, lift upto 1.5 m,including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil |
| 2 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. I Sand filling |
| 3 | Providing and laying dry flat brick flooring in required pattern complete. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level:- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 7 | First class brick work in foundation and plinth including cost of all materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies,shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) |
| 9 | Reinforced cement concrete work in walls (anythickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank |
| 11 | Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts withwooden plank |
| 12 | Half brickmasonryworkwith first class bricks insuperstructureuptofloor five level includingcostofall materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ) |
| 13 | 12 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand) |
| 14 | ProvidingandfixingM.S. roundholdingdownboltswith nuts and wahser plates complete as per standard design. |
| 15 | Providing and fixing M.S. grills of required pattern inframes of windows etc. with M.S. flats, square orround bars etc. all complete. |
| 16 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layerwith power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50m and lift upto 1.5 m :-All kinds of soil |
| 17 | Finishing walls with textured exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issuedby the Manufacturer] New work ( two or more coats applied @ 3.28 litre/10 sqm)over and including priming coat of exterior primer applied@ 2.20 kg/10 sqm Please Enable Macros to View BoQ information |