| 1 | Carriage of all the concerning material from store centre to JE's dump store& from dump store to the site work including loading, unloading and proper stacking at the site etc. |
| 2 | 63 KVA 11/0.4 KV T/F |
| 3 | 11 KV 3x300 sq mm XLPE Cable |
| 4 | 11 KV 3x300 sq.mm Cable Jointing Kit I/D |
| 5 | 11 KV 3x300 sq.mm Cable Jointing Kit O/D |
| 6 | 11 KV 3x185 sq mm XLPE Cable |
| 7 | 11 KV 3x185 sq mm XLPE O/D J/Kit |
| 8 | 11 KV 3x185 sq mm XLPE I/D J/Kit |
| 9 | 11 KV 3x70 sq mm XLPE cable |
| 10 | 11 KV 3x70 sq mm Cable Jointing Kit Indoor. |
| 11 | 11 KV 3x70 sq mm Cable Jointing Kit Outdoor. |
| 12 | Single core cable 1x630 sq mm |
| 13 | LT PVC Cable 3.5x70 sq mm for Lightening of S/Y |
| 14 | Panther Conductor |
| 15 | 33 KV VCB 800 Amp 750 MVA |
| 16 | Double T/F Control Panel |
| 17 | Single Feeder Control Panel |
| 18 | 11 KV VCB I/C CTR 600/300/5 amp, 350 MVA |
| 19 | 11 KV VCB O/G CTR 200/100/5 amp, 350 MVA |
| 20 | Bus Coupler 350 MVA |
| 21 | MS Round of 32 mm dia |
| 22 | 33 KV LINE ISOLATOR 400/800 A |
| 23 | 33 KV Lightening Arrestor |
| 24 | 33 KV BUS ISOLATOR 400/800 A |
| 25 | 33 KV CT 200/100/1 amp |
| 26 | 33 KV CT 400/200/1 amp |
| 27 | 33 KV PT outdoor (33KV /110V) |
| 28 | ST Pole 11 Mtr Long (Galvanised Bottom) |
| 29 | PCC Pole 11 Mtr Long |
| 30 | ST Pole 9 Mtr Long (Galvanised Bottom) |
| 31 | 11 KV Disc Insulator B&S Type 70 KN |
| 32 | Disc Fittings Dog/Racoon 70 KN B&S |
| 33 | 11 KV Composit Pin Insulator |
| 34 | MS earthing rod |
| 35 | LT PVC Cable 1x240 sq mm |
| 36 | Rail 105 Lbs 9 Mtr Long |
| 37 | Steel Section |
| 38 | Battery Charger 24 Volt |
| 39 | Battery Set 24 Volt |
| 40 | Checking of soil resistivity of S/S land and if required take necessary measure to make soil resistivity as per norms. |
| 41 | Earth mate (30x25 Mtr) & Earthing of substation switch yardEarth Laying of earth mat in the switchyard by laying of M.S. Round of 32 mm dia in 750 mm deep trenches with M.S. Round 32mm dia,3 Mtr. Long earth electrodes as per drawing. The work includes welding of the M.S. Round ,connecting all steel structures in the switchyard with the earth mat by means of G.I. strips of size 50x6mm as per item below and proper levelling (All material shall be provided by the contractor except the supplied item) as per RESSPO Norms. |
| 42 | Excavation of earth for laying mat |
| 43 | Driving of earth electrode. |
| 44 | Laying of earthmat (M.S.) Bar including cutting, shaping and binding etc) |
| 45 | Preparation of joints, proper making and welding; of main earthmat bar joints and applying bitumen, bitumen impregnated on joints i.e. End Joints. Cross Joints, Lap Joints. |
| 46 | Welding of riser strip with earthmat and structure body. |
| 47 | Plinth of 2x5 MVA.33/11 KV T/Fs Construction of plinth of size 3x4 Mtr. for 10 MVA T/F having 0.4 Mtr. above ground level . The work including excavation of foundation base concreting in CC 1:6:12 ratio (cement ,fine sand & brick ballast)first class brick work in cement mortar of ratio 1:4 foundation CC in 1:4:8 ratio (cement ,fine sand & brick blast) and RCC working ratio 1:2:4 (cement ,coarse sand and stone grit of 20mm gauge using MS Bars of 10mm dia( tor ) in reinforcement including its cutting ,bending &binding in required shape .The work also includes laying of 2 No. 4 Mts. long each rail pieces complete with cutting & proper fitting etc. The plinth will be plastered/ finished on top and sides of the plinth .(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 44. |
| 48 | BUS BAR GANTRY &33 KV SECTTIONAL BUSBAR AND STRINGING |
| 49 | BUS BAR GANTRY- Erection, Plinthing & grouting of Bus bar gantry using 9/13 mtr long rail pole as per requirement and channel (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/ Schedule No 40. |
| 50 | 33 KV SECTIONAL BUS BAR AND STRINGINGStringing of 33KV bus bar with ACSR Panther Conductor including fixing of Disc insulators, strings and tension fitting complete with sagging of bus bar etc. and making vertical/Horizontal jumper connections through PG Clamps and connecting all the equipments with each other through connecting clamps.Work includes all the jumpering from cable stand to bus bar and from bus bar to transformer (2no.T/f bay's) as per RESSPO (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 40. |
| 51 | FABRICATION ,ERECTION, GROUTING PLINTHING OF S/S STRUCTURE. |
| 52 | (A) ISOLATOR STRUCTURE :- Erection,Plinthing & grouting (1.9 Mtr Below & 2.6 mtr above ground level because of earth filling) of Isolator structure (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 41. |
| 53 | (B) LIGHTNING ARRESTOR ,C.T. & PT STRUCTURE:- Erection Plinthing & grouting (1.9 Mtr Below & 2.6 mtr above ground level because of earth filling)of L.A. & C.T. structure (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 42. |
| 54 | PLINTH FOR VCB :-Construction of plinth of size 2.0 mtr x 1.5 mtr x 0.9 mtr suitable for erection of upper structure for 33KV VCB including grouting of anchor bolts in proper alignment and level. Scope of work includes excavation of foundation base concreting in CC 1:6:12(cement, fine sand & brick ballast ),1st class brick work in cement mortar of ratio 1:4 CC in ratio 1:4:8 and RCC work in ratio 1:2:4 (cement coarse sand and stone grit of 20mm gauge )(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 55 | Fabrication, erection, plinthing & grouting of cable stand made of two nos MS channel 100x50x3.5 mtr(0.9 Mtr Below & 2.6 mtr above ground level because of earth filling) . Long jointed to each other by means of 05 nos MS strip 50x6 mm of size 150 mm Long each by welding at equal distance interval as per norms and completely providing two nos cable clamp also.(All materials will provide by contractor except MS channel) as per RESSPO Norms/Schedule No 49. |
| 56 | ERECTION & INSTALLATION OF 33/11KV,2x5 MVA TRANSFORMERS A)Erection and installation of 33/11kV,05 MVA transformer in a levelled position on the plinth. The work includes shifting of transformer to the site of installation within the substation premises, assembling fixing and fitting of all accessories and filling of transformer oil to the desired level and ensuring that there is no leakage. Providing & fixing Copper.L-piece/Connector 07 no.for transformer. All the jumpering & connection are included in the scope of work. Work shall be done as per RESSPO Norms(All material shall be provided by the contractor except Transformer) |
| 57 | INSTALLATION OF VCB:- Installation of 33KV VCB- complete work including commissioning.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 58 | INSTALLATION OF ISOLATORS :-Assembling and installation of line /bus isolator on the isolator structure, In case of line isolator proper operation of earth links shall also be insured. The work includes fabrication for proper flexing if required.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 59 | INSTALLATION OF LIGHTNING ARRESTOR ,C.T. & PT STRUCTURE |
| 60 | INSTALLATION OF LIGHTENING ARRESTORSAssembling and installation/ Mounting of lightning arrestors on the L.A.Structure (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 61 | INSTALLATION OF CT:- Installation of CTs on the CT structure, along with C.T. Junction box .(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 62 | INSTALLATION OF PTInstallation of PTs on the PT structure, along with P.T. Junction box(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 63 | Jumpering of all equipments in switch yard with ACSR Conductor P.G. clamps & proper size aluminium lugs.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 64 | Providing & fixing of connector for LA,CT,PT,Isolator etc.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 65 | Earthing by way of boring and lowering of \\"B\\" class GI pipe 50mm dia from ground upto the water level (minimum 30 meter deep) as per standard practice (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 53. |
| 66 | Fabrication, Erection,Plinthing & grouting of Neutral erthing (0.9 Mtr Below & 2.6 mtr above ground level because of earth filling) and grouting of M.S Angle 75x75x6 or 65x65x6mm in L shape & in proper size and alignment to provide support for the separate earthing strips for power transformer neutral including supply and fixing of flexible copper bonds for neutral earthing. (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 52. |
| 67 | INSTALLATION OF SWITCHGEARS IN CONTROL ROOM |
| 68 | Shifting carefully & safely 11KV I/C,O/G & B/C switchgear from outside of the switchgear room in proper position and alignment and checking-complete work with Mounting of P.T on incoming Switch gear.(All material shall be provided by the contractor except 11 KV I/C, O/G & B/C will be provided by the department)as per RESSPO Norms |
| 69 | Fixing and making bus bar connections in between all switchgears after cleaning and taping with H.T. Tape, empire tape and PVC tape properly. Providing and fixing of 6 mm thick Bakelite separators and plugging of all opening & holes with plastic compound-complete work including cost of all material (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms and strictly to the satisfaction of site in- charge. |
| 70 | Fixing and connecting of all outgoing/incoming 11 kv cables with all switchgears and taping with H.T. Tape, empire tape and PVC tape properly (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms and strictly to the satisfaction of site in- charge. |
| 71 | Shifting carefully & installation of 33KV Double circuit transformer control panel in control room including its grouting. (All material shall be provided by the contractor except 33KV single circuit transformer control panel shall be provided by the department)as per RESSPO Norms |
| 72 | Shifting carefully & installation of 33KV single circuit line control feeder panel in control room including its grouting (All material shall be provided by the contractor except 33KV single circuit line control feeder panel shall be provided by the department)as per RESSPO Norms |
| 73 | EARTHING OF 11KV SWITCHGEARS & 33KV CONTROL PANELSEarthing of indoor equipments by means of M.S strip 50x6mm & connecting to Pipe type earthing as per RESSPO norms. Joints will be welded with high quality arc welding. (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 74 | Fabrication & erection of 11 KV cable exposure type double pole with fixing of necessary clamps and other accessories like danger board, number plate, barbed wire, pin insulators with pins, channels 100x50 mm and MS angle 65x65x6 mm . Its jumpering by single core PVC aluminium cable with proper size of lug.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 29. |
| 75 | Fabrication, erection, plinthing of substation type double pole of ST. Pole 11 Mtr long with fixing of necessary clamp, channel, angle 11 Kv pin, pin insulator , 11 KV TPMO/DO set and sub station type M.S angle accessories with electrode earthing as per RESSPO Norms(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 32. |
| 76 | Grouting of pole in depth of 1/6 the length of pole in ratio 1:4:8 in cement sand and brick ballast and Construction of pole plinth 300mm x 45mm above ground level in 1:2:4 in cement, coarse sand and stone gritt (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 77 | Painting of ST pole with one coat of red oxide & two coats of best quality enamel paint ISI mark (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 78 | Installation of 63 KVA T/F on T/F Plinth/ double pole and commissioning including jumpering with the system (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 79 | Construction of RCC Cable trench 800x850 mm as per drawing including trench cover in Angle fram size angle 75X75X6 MM Trench wall thikness 1500mm grill by MS rod 10 mm dia vartical distance 6\\"horizentel distance 4\\". |
| 80 | H.T.CABLE LAYING |
| 81 | Cable laying 11KV,3X300,3X185 and 3X70 above size sq S/C in normal soil by digging of trench including supply of required material as fine sand, bricks. (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making rings and sealing both ends of the cable. |
| 82 | Cable laying in existing trench S/C all size cable. |
| 83 | Hoisting of 11KV cable providing GI pipe of 4\\" dia and 3M long with making O/D J/Kit proper supporting clamp and its jumpering with existing lines.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 33. |
| 84 | Hoisting of 11 KV cable on 11 switchgear & Cable Stand (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 85 | High Pressure testing of 11 KV XLPE cable. Testing equipment will be arranged by the contractor. |
| 86 | Construction of cable trench of size 300x300 mm including brick work 1:4 in wall of the trench. Brick ballast work in 1:5:10 on foundation, plaster 12 mm thick with coarse sand 1:4 and surface finishing with cement. Providing MS strip at an interval of 0.5 M & MS angle running on both the edges of trench.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 54. |
| 87 | Construction of welded frame type control cable trench cover 0.5 M long suitable for trench including cost of MS/Torr Bar.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 55. |
| 88 | Providing and Laying of following size Armoured copper control cable through underground/cable trench/trenching SGR interlinking through proper connections to transformer control panel/protection board /Battery and Battery Charger/Relays 33/11 KV Transformer junction box/ 33KV VCB ,CTs etc as per site conditions.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 89 | a) 2x2.5mm2 |
| 90 | b) 4x2.5mm2 |
| 91 | Providing & fixing of control cable tray.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 92 | Painting of all structures & equipments.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 93 | Yard levelling of switch yard and brick interloking as per norms as per RESSPO Norms/Schedule No 55. |
| 94 | Painting of feeder name on all cables at every after 5 mtr length as per instruction of site engineer. |
| 95 | Painting of feeder name on D/P & Cable Standas per instruction of site engineer . |
| 96 | Installation of 24 Volt, 15 AH sine wave Battery and battery Charger and its cabinate complete and including its commissioning. (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 97 | Construction of Toe wall around the outdoor Switchyard of the S/s of size 0.75 Mt.at Base and 0.23 Mt. at top as per RESSPO Norms by lst class bricks in the ratio 1:6, Base concreting of the wall to be done in ratio 1:6:12 and plaster 12 mm thick in ratio 1:4. (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 98 | Fabrication of switchyard fencing with wire mesh 10SWG(37mmx50mm) along with Fabrication of one number gate made of MS Angle, MS Channel, MS Flat together with locking arrangement, its Installation including the cost of civil material, angle 50x50x5mm.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 46. |
| 99 | STATION/SWITCHYARD LIGHTING |
| 100 | Erection of 9 Mt. STP after excavation of earth in any type of soil and grouting of CC in ratio 1:4:8 (cement, coarse sand & brick ballast) With plinthing (All material shall be provided by the contractor except Pole)as per RESSPO Drawing/Schedule No 47. |
| 101 | Stringing & sagging of with Lt PVC cable 3.5x70 sq mm three phase four wire including fixing of insulators. Strings and tension fitting complete with sagging etc. (All material shall be provided by the contractor except cable)as per RESSPO Norms |
| 102 | Provided and Fixing of LED flood lamp 120W complete fittings, (standard quality ISI mark with water tight fittings, elbow etc.)on above supports.(All material shall be provided by the contractor )as per RESSPO Norms/Schedule No 47. |
| 103 | Laying and spreading of 3.5 x 150/70/35 Sq.mm PVC LT cable (250 M) from 11/.04 kv,63KVA T/F to LT Distribution Board in switchgear room after digging the trench, laying cable and refilling of trench including connection at both ends after providing and crimpling of lugs of proper size, complete work.(All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 104 | Providing and laying of 2 x 6 sq. mm. aluminium cable from S.G. room to street light supports after digging of trench, laying of cable, providing a brick on top of cable , refilling of trench, making connections at poles with street light fittings, complete in all respect. (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms |
| 105 | Providing & fixing auxiliary items like Table,chair,almirah & lighting board with swicth,socket,MCB & indicator(R,Y,B) etc (All material shall be provided by the contractor except the supplied item)as per RESSPO Norms/Schedule No 48. |
| 106 | Office table wooden |
| 107 | Office chair wooden |
| 108 | Bench wooden |
| 109 | Wall clock |
| 110 | Steel almirah |
| 111 | Notice board |
| 112 | Max - min load record |
| 113 | Key board |
| 114 | 4.5 Kg. CO2 fire extinguisher, portable type |
| 115 | 5 kg. Dry chemical powder fire extinguisher, portable type |
| 116 | Fire bucket 6 no. with stand |
| 117 | SMC MCCB Distribution board (1 No. I/C & 3 No. O/G) |
| 118 | LT Distribution Panel for S/S supply |
| 119 | Rubber matting sheet 8/10mm thick 2x1.5 mtr |
| 120 | Substation Dashboard |
| 121 | Single line diagram of s/s |
| 122 | Return of Balance material including Cable Drum from site to store, including handling, loading, unloading, and transportation as per project requirements |
| 123 | All earthing strip shall be painted by green colour (All Material Shall be arranged by the contractor) |
| 124 | Construction of 33 KV Double Circuit UG Line from 132 Gomti Nagar to New 33/11 KV S/S Rasulpur (Murdahiya) , Gomti Nagar, Lucknow Stock Issue Rate 2026-27 Under Business Plan 2026-27 |
| 125 | Safe loading & carriage including & proper stacking of following store material from ESC Lucknow /JE store to site of work . |
| 126 | 33 KV 3x300 sq mm XLPE Cable |
| 127 | 33 KV 3x300 sq mm XLPE St/Th J/Kit |
| 128 | 33 KV 3x300 sq mm XLPE O/D J/Kit |
| 129 | PCC Pole 11 Mtr Long |
| 130 | 33 KV Composite Pin Insulator |
| 131 | MS earthing rod 20x2500 mm |
| 132 | Steel Section |
| 133 | Laying of 33 kV 3x300 sq. mm XLPE cable D/C including digging of trench 1050 mm deep, 750 mm wide along with required material Sand (0.195 Cub/Mtr), Ist class bricks (26.25 Nos/Mtr), stone pad (2.2 Nos size 600x750x50 mm). The inter axial spacing between two cable should be in between 0.32 M to 0.40 M. (As per JE instruction) and back filling the trench by soil (All the material required for laying will be supplied by the contractor except 33 kV XLPE cable) |
| 134 | 33 kv3x300 Sq. Mm XLPE cable laying in MS/GI pipe 6\\" Dia single circuit (All the material shall be provided by the contractor except cable) as per resspo norms. |
| 135 | 33 kv 3x300 sq. mm XLPE cable laying in RCC Pipe S/C.(All the material shall be provided by the contractor except 33kv cables)as per resspo norms. |
| 136 | Cable laying by drill method HDD Single circuit with HDPE/GI/MS Pipe. 150mm Dia (All the material shall be provided by the contractor except 33kvcables) |
| 137 | Hoisting of 33 kv 3x300 sq. mm XLPE Cable on D/P with GI Pipe Dia 6\\" its jumpering complete with clamps , nuts and bolts .(All the material shall be provided by the contractor except 33kv cables & O/D J/K. )as per RESSPO NORMS |
| 138 | Hoisting of 33 kv 3x300 sq. mm XLPE Cable on cable stand its jumpering complete with clamps , nuts and bolts .(All the material shall be provided by the contractor except 33kv cables & O/D J/K. )as per RESSPO NORMS |
| 139 | High pressure testing of 33kv 3x300 sq.mm.XLPE cable .Testing equipment will be arranged by the contractor |
| 140 | Providing ,fixing &grouting of stone cable route marker on cable route .displaying feeder name, voltage & depth.(All the material shall be provided by the contractor) as per norms. |
| 141 | Fabrication & erection of cable stand with grouting & plinthing as per resspo norms .(steel material provided by department) |
| 142 | Digging of pit of size 3x2x1 mtr. For making straight through joint 33KV work included filling of soil levelling and ramming of the same(ST/Th Providing by department ) |
| 143 | Fabrication & erection of 33 KV cable exposure type double pole with fixing of necessary clamps and other accessories like stone pad, danger board, number plate, barbed wire etc for supporting the hoisting of cable etc. Its jumpering by single core PVC aluminium cable with proper size of lug as per RESSPO norms.(All material to be arranged by contractor except Pole , Pin Insulator, Pin with Nut, M.S. Channel 100x50 sq mm, MS Angle 65x65x6MM, MS Earthing Rod, LT PVC Cable 1x400 sq mm). |
| 144 | Grouting of STP in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mm x 45mm above ground level in 1:2:4 in cement, coarse sand and stone grit as per RESSPO norms. |
| 145 | Scanning/Tracing of existing underneath power cables, water pipe line, gas pipe line, sewer pipe line on proposed route to avoid possibilities of any kind of damage during digging of trench/drilling for laying cable. (Scanning machine will be provided by the contractor) |
| 146 | Plotting of cable layout route & providing the map (i.e. depth Undernet and distance from either side of prominent reference fixed points). The reference must be not more intervals of 100 meter.(All material shall be provided by the contractor) as per norms. |
| 147 | Painting of 33 kv feeder Name on the End type Double Pole/ Cable Exposure/ Cable stand etc as per instruction of site engineer |
| 148 | Providing and laying of warning tape |
| 149 | Painting of all structures & equipment. (All materials shall be provided by the contractor ).as per RESSPO Norms. |
| 150 | All earthing strip shall be painted by green colour (All Material Shall be arranged by the contractor) |
| 151 | Construction of 11 KV Overhead & Double Circuit UG Line for New 33/11 KV S/S Rasulpur (Murdahiya) , Gomti Nagar, Lucknow as per Stock Issue Rate 2026-27 Under Business Plan 2026-27 |
| 152 | Safe loading & carriage including & proper stracking of following store material from ESC Lucknow /JE store to site of work . |
| 153 | 11 KV 3x185 sq mm XLPE Cable |
| 154 | 11 KV 3x185 sq mm XLPE St/Th J/Kit |
| 155 | 11 KV 3x185 sq mm XLPE O/D J/Kit |
| 156 | ACSR Dog Conductor 0.5 Km x 3+3%=1.55 Km for 11 KV |
| 157 | ST Pole 11 Mtr Long (Galvanised Bottom) |
| 158 | 11 KV Disc Insulator T&C Type 45 KN |
| 159 | 11 KV Disc fitting T&C Type 45 KN |
| 160 | 11 KV Composite Pin Insulator |
| 161 | MS earthing rod 20x2500 mm |
| 162 | 11 KV V type x-arm angle 65x65x6mm |
| 163 | Steel Section |
| 164 | MS ANGLE 65X65X6M 5.8KG/MTE |
| 165 | Stay Set 16x1800 |
| 166 | Gi Wire 8 Swg For Guarding A Cross The Line |
| 167 | D/C Laying of 11 kV 3x185 sq. mm XLPE cable including digging of trench 1050 mm deep, 750 mm wide along with required material Sand (0.195 Cub/Mtr), Ist class bricks (26.25 Nos/Mtr), stone pad (2.2 Nos size 600x750x50 mm). The inter axial spacing between two cable should be in between 0.32 M to 0.40 M. (As per JE instruction) and back filling the trench by soil (All the material required for laying will be supplied by the contractor except 11 kV XLPE cable) |
| 168 | 11 kv3x185 Sq. Mm XLPE cable laying in MS/GI pipe single circuit (All the material shall be provided by the contractor except cable) as per resspo norms. |
| 169 | Cable laying by drill method HDD single circuit (All the material shall be provided by the contractor except 11 KV cables) |
| 170 | Hoisting of 11 kv 3x185 sq. mm XLPE Cable on D/P with GI Pipe dia 6\\" its jumpring complete with clamps , nuts and bolts .(All the material shall be provided by the contractor except33kv cables & O/D J/K. )as per RESSPO NORMS |
| 171 | Digging of pit of size 3x2x1 mtr. For making straight through joint 11 KV work included filling of soil levelling and ramming of the same(ST/Th Providing by department ) |
| 172 | High pressure testing of 11 kv 3x185 sq.mm.XLPE cable .Testing equipment will be arranged by the contractor |
| 173 | Stringing,sagging,binding & jumpering of 3 phase 3 wire line with ACSR conductor. (All the material except conductor will be supplied by the contractor) |
| 174 | Fabrication & erection of Single pole Support for 11 KV line on 11 M long ST Pole with fixing of necessary clamps & other accessories like X-arm angle holding clamp, stone pad 300x300x75 mm, F-bracket, MS nut bolts off size, danger board with clamp and bolt & nut, number plate with clamp and nut & bolt, GI barbed wire (2 kg/pole), concreting of support (0.268 cu.m/pole), aluminium binding wire – 6 SWG (0.5 kg/pole), aluminium paint, red oxide paint, earth wire clamp with bolts & nuts, armour rod with ferrule etc. (All material except ST pole 11 meter long, 11 KV V-type cross arm angle 65x65x6 mm, 11 KV pin insulator, 11 KV pin with nut, MS earthing rod 20x2500 mm shall be provided by the contractor) |
| 175 | Fabrication, erection of end type double pole with one side cable exposure for 11 KV line on 11 M long ST pole with fixing of necessary clamps & other accessories like Concreting of support (0.268 cu.m/pole), supporting clamp, nut & bolt washer off size, stone pad 300x300x75 mm, red oxide paint, aluminium paint, stay set 16x1800 grouting, number plate with clamp and nut & bolt, danger board with clamp and bolt & nut, GI barbed wire (2 kg/pole), aluminium binding wire – 6 SWG (0.5 kg/pole), PG clamp, earth wire clamp with nut & bolts etc. (All material except ST pole 11 meter long, M.S. channel 100x50 sq mm (10 kg/mtr), 11 KV disc insulator T&C type 45 KN, stay set 16x1800, stay wire 7/10 SWG, M.S. angle iron 65x65x6 mm bracing (2 nos., 4300 mm), M.S. angle iron 65x65x6 mm for cable dropper, 11 KV disc fitting T&C type 45 KN, MS earthing rod 20x2500 mm shall be provided by the contractor) |
| 176 | Fabrication & erection of Section double pole for 11 KV line on 11 M long ST Pole with fixing of necessary clamps & other accessories like Stone pad 300x300x75 mm, earth wire clamp with bolts & nuts, P.G. clamps for Raccoon, number plate with clamp and nut & bolt, danger board with clamp and bolt & nut, GI barbed wire (2 kg/pole), aluminium binding wire – 6 SWG (0.5 kg/pole), aluminium paint, bolt & nut all sizes (LS), red oxide paint, concreting of support (0.268 cu.m/pole), stay set 16x1800 grouting, E-bracket, holding clamp etc. (All material except ST pole 11 meter long, 11 KV disc insulator T&C type 45 KN, 11 KV pin insulator, M.S. angle iron 65x65x6 mm bracing (2 nos., 4300 mm), M.S. channel 100x50 sq mm (10 kg/mtr), stay set 16x1800, stay wire 7/10 SWG, 11 KV disc fitting T&C type 45 KN, 11 KV pin with nut, MS earthing rod 20x2500 mm shall be provided by the contractor) |
| 177 | Fabrication and fixing of guarding angle on single/double poles. Stringing and sagging of two nos. GI wire with cradle guarding of above 11 kv line as per RESSPO norms. Including provision of all necessary accessories like clamps and hooks etc . 1 No =ONE SPAN OF 40 Mtr, (All material except guarding angle & GI wire will be supplied by the contractor) |
| 178 | Nozeling ,winding & grouting of stay set. (All the material will be arranged by the contractor except stay wire & stay set). |
| 179 | Grouting of STP/PCC in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mm x 45mm above ground level in 1:2:4 in cement, coarse sand and stone grit as per RESSPO norms and its earthing as per RESSPO norms |
| 180 | Painting of STP with one coat of red oxide & two coats of best quality top 2 mtr PO Red paint and remaining al. Paint (ISI mark) as per RESPO norms. |
| 181 | Cutting and chopping of tree braches of trees. |
| 182 | Plotting of cable layout route & providing the map (i.e. depth Undernet and distance from either side of prominent reference fixed points). The reference must be not more intervals of 100 meter.(All material shall be provided by the contractor) as per norms. |
| 183 | Painting of 11 kv feeder Name on the End type Double Pole/ Cable Exposure/ Cable stand etc as per instruction of site engineer |
| 184 | Scanning/Tracing of existing underneath power cables, water pipe line, gas pipe line, sewer pipe line on proposed route to avoid possibilities of any kind of damage during digging of trench/drilling for laying cable. (Scanning machine will be provided by the contractor) |
| 185 | Return of Balance material including Cable Drum from site to store, including handling, loading, unloading, and transportation as per project requirements |
| 186 | Painting of all structures & equipment. (All materials shall be provided by the contractor ).as per RESSPO Norms. |
| 187 | All earthing strip shall be painted by green colour (All Material Shall be arranged by the contractor) Please Enable Macros to View BoQ information |