|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Supply of the following sizes of HDPE pipes 6 kg/cm2 confirming to latest relevant I.S.S with HDPE couplers etc complete in all respect F.O.R. destination including all taxes and insurance. |
| 3 | Supply of HDPE/DI Specials conforming to I.S.- 4984/2016 with solvent cement suitable for above HDPE pipe F.O.R destination including all Taxes and insurance. (5.00% Of Item No.1) |
| 4 | Dismantling of following type of surface including sorting out and staking of serviceable materials of disposal of unserviceable materials up to a distance of 50 m. |
| 5 | Excavation for pipe line trenches in Ordinary soil,(lime, clay or sand Including lift up to 1.5m and lead up To 50m and refilling, watering, Ramming of excavated earth in to trenches and disposal of surplus earth up to 50 m from the center of the foundation trenches. |
| 6 | Laying and Jointing PVC Pipe. Heading |
| 7 | Carting from the store the following sizes of HDPE pipe and specials to the site of work lowering them in to trenches and laying true to alignment and gradient including jointing, testing of pipeline and including supply of jointing material such as nut & bolts, rubber insertion, white lead etc. com- plate but excluding cost of trenching and cutting of pipes etc. For making of lengths but including making joints. |
| 8 | Sand filling into the trenches at top of the laid pipe supply of necessary quantity of sand from a distance not exceeding 8Km from site of work and i/c watering,dressing etc.Rate to including supply of all material,labour and T&P etc.required for proper completion of work. |
| 9 | Supply of all materials, labour T&P etc. required and constructs single tap pillar type stand post as per type design. (Stand Post) |
| 10 | Provision for Large crossing of nala,raod & culverts including shifting of telephone cabel etc.along the alignment of pipe line including supply of C.I Tyton pipe and special and also jointing material their laying and jointing testing etc. complete. (3.50Mtr for Nala,Road,Hole etc) |
| 11 | Interconnection of existing pipe line with new pipeline of following sizes including road dismantling and reinstatement of all type of roads including excavation ,bailling out of water,cutting of pipe and making of interconnection with all specials, fittings, labour T&P etc all complete. |
| 12 | Reinstatement of following type of road surface including all material ,labour,T&P etc. Complete. |
| 13 | Making ferrule connection of various nominal dia of new distribution mains in different type of roads with fixing of saddle piece, service connections, fittings, and fixing of brass ferrule of 15mm size including tapping the main. |
| 14 | IN GST 18% Please Enable Macros to View BoQ information |