Name of Work:- Construction of link road from Chosphelling to thangkob Basgo by way of side drain and B/ Wall ( Under capex)
Sl. No.
Item Description
1
Earth work in excavation by mechanical means (Hydraulic excavator) infoundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil.
2
Dry stone pitching ( any thickness ) including cost of stones. On Horizontal.
3
Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 gradedstone aggregate 40 mm nominal size derived from natural sources)
4
Random rubble masonry with hard stone in foundation and plinth includinglevelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 gradedstone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
5
Random rubble masonry with hard stone laid dry in foundation, plinth &wallsLaid without bond stone
6
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4(1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominalsize).
7
Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 20 mm nominal size derived from natural sources)
8
Centering and shuttering including strutting, propping etc. and removal of formwork for : Foundations, footings, bases for columns
9
Providing and fixing M.S Pipe 300mm dia incl trench cutting carriage all complete job.
10
Carriage of material by Mechanical Transport including loading. Unloading and stacking Cement at an avg lead of …...................50 km
11
Sand an avg lead ….......................15 km
12
St aggregate an avg lead …........................ 15 km
13
Stone an avg lead ….............. 08 km Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.