| 1 | Earth work in excavation of foundation in hard soil with all leads & lifts including dressing the sides & leveling the bed of the foundation to the required width & required depth including shoring shuttering, propping bullah, pilling, dewatering from foundation supplying & working of pumps including hire & running charges of pumps & all machineries required for the work & providing coffer dam if required & stacking the excavated materials away from the working areas with Cess complete as per specification & direction of the Engineer-in-charge. |
| 2 | Providing & filling good clean river sand of approved quality including watering to complete saturation & ramming complete including cost conveyance, royalty, additional charges, DMF 10% & EMF 5% over royalty Cess & taxes of all materials & cost of all labour & T&P required for the work etc complete as per specification & direction of Engineer-in Charge. |
| 3 | Providing Plain Cement concrete M-15 in foundation upto a required depth below ground level and upto a required height above ground level/bed level using 40mm down graded hard granite aggregates of approved quality from approved quarry including hoisting, lowering, laying compacting in position in layers to proper slope & level including watering, curing and cost, conveyance, Cess, royality, additional charges, DMF 10% & EMF 5% over royalty taxes of all materials etc. with all labour and T&P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer-in-charge. In Foundation |
| 4 | Providing Plain Cement concrete M-15 in foundation upto a required depth below ground level and upto a required height above ground level/bed level using 40mm down graded hard granite aggregates of approved quality from approved quarry including hoisting, lowering, laying compacting in position in layers to proper slope & level including watering, curing and cost, conveyance, Cess, royality, additional charges, DMF 10% & EMF 5% over royalty taxes of all materials etc. with all labour and T&P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer-in-charge. In substructure |
| 5 | Plain Cement Concrete PCC Grade M 20 in open foundation complete as per drawing and technical specifications |
| 6 | RCC M25 using 12mm size crusher broken HBG chips including centering, Shuttering , cost,conveyance, royality, taxes etc. of all materials complete. Raft |
| 7 | RCC M25 using 12mm size crusher broken HBG chips including centering, Shuttering , cost,conveyance, royality, taxes etc. of all materials complete. Rib & Hunch |
| 8 | RCC M25 using 12mm size crusher broken HBG chips including centering, Shuttering , cost,conveyance, royality, taxes etc. of all materials complete. Deck Slab |
| 9 | Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. |
| 10 | Construction fo RCC guard posts of 200 mm dia M15 grade cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause. |
| 11 | CC M30 Wearing coarse using 12mm size crusher broken HBG chips including centering, Shuttering , cost,conveyance, royality, taxes etc. of all materials complete. |
| 12 | Supply of HYSD bars confirming to grade S-415 cutting bending, binding, lapping, splicing, welding etc. (conforming to ISI specification) & jointing if necessary by lapping & tying the grills & placing in position as required for RCC works as per the approved design, hoisting, lowering & laying position including cost & conveyance of tor steel & binding wires of 18 to 20 gauge(as to be approved by the Deptt.) etc. complete (weight of binding wire shall not be considered for payment at all which will be borne by the contractor (standard CO-efficient of different sizes of the steel shall be considered & welding & lapping should confirm to relevant clause of IRC-21/1987) |
| 13 | Providing & laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600mm with 40mm metal providing over the entire surface behind abutment, wing wall, return wall etc. complete. |
| 14 | Finishing wall surface with waterproof cement paint of aproved shade 2 coats including watering, curing,cost of all materials & labour etc. |
| 15 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing. Please Enable Macros to View BoQ information |