| 1 | Taking down cement plaster of any description including racking out joints, hacking for key scrubbing down with water etc and removal of entire debris as ordered outside MD land complete all as directed. |
| 2 | Taking down carefully existing bitumen tarfelt including cement screed any thickness ,cleaning the surface and make free of dirt, foreign particles, laitance followed by grinding all protrusions to make surface modulated and removing all foreign materials / Bituminous primer completely , cleaning and washing the existing surface of roof/slab, terraces including flashings and junctions of parapets/kerb walls etc to the utmost satisfaction of Engineer-in-charge including removal of entire debris as ordered outside MD land complete all as directed. .(Note : Contractor will not throw the debris and suitable arrangements shall be made to take down the materials from roof).. |
| 3 | Removing of tree roots of any girth and height , shrubs and bushes from wall surface/roof top/chajjas up to 15 M height including repairing of cracks and filling the tree root channels and dismantled areas apply a coat of concentrated Glyphosate (41% SL) or Triclopyrwith approved chemical and render unfit for growth of vegetation on building surface and finally making good in cement mortar 1:3 and to match the surface with existing finishes including all T&P required and considering all saftey measures to carry out work upto ht 15 mtrs of bldg etc completed and removal of the complete vegetation outside MD land complete all as directed. |
| 4 | Taking down plaster entire plaster around rainwater spot of size 450x450mm and M&L 10 mm thick plaster the surface with cement mortar 1:3 in slopemixed with water proofing compund @2% weight of cement toward rain water pipe spot all as specified and directed. (Note : WPC measured & Paid separately). |
| 5 | Demolition of plain cement concrete of any description and in any position not otherwise specifically provided for in this Schedule nd removal of debris as ordered outside MD land complete all as directed. |
| 6 | Demolition of reinforced cement concrete of any description and in any position (reinforcement cut as required to facilitate demolition) all as specified & as directed. |
| 7 | Demolition of brickwork , block masonry or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of debris as ordered outside MD land complete all as directed. |
| 8 | Taking down chowkats or frames not exc 1.5 sqm each with shutters (without taking off shutters from frame) and stacking at site where directed. |
| 9 | Dismantling of any type of existing cupboard ,Kitchen Shutter , shelves along with accessories complete all as as directed |
| 10 | Taking down carefully PVC Sheet fixed from any vertical surfaces of description and after completion of wall panneling work refix the taken down PVC Sheet in same or different location as ordered with sufficient qty of adhesive complete to the satisfation of Engineer-in-charge . |
| 11 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for in this Schedule all as directed |
| 12 | Dismantling wall and ceiling boards (fibre, pulp, insulation etc) or insulation boards / slabs / blankets any thickness, including cover fillets complete all as specified and as directed |
| 13 | Dismantling of Existing Wall Paneling of any type and size as complete all as directed. |
| 14 | Dismantling floor, hearth or wall tiling inluding cement mortar bedding (but not backing), stacking serviceable tiles at site and removal of entire debris as ordered outside MD land complete all as directed.(Note : Before dismantling of tiles all sanitory fittings including plumbing items to be carefully taken down after necessary water connections & the same to be refixed in positon as ordered & make necessary water connections & testing on completion without any extra cost to Govt.). |
| 15 | Taking down existing external PVC 75mm pipe carefully and after completion of external Plaster work refixing in same place/ Position complete all as specified and as directed. |
| 16 | Dismantling of Corrugated or semi corrugated steel sheeting etc any thickness including ridges as in roof covering and stacking at site where directed and removal of debris to a distance not exceeding 50 mtr and depositing where directed complete all as directed. |
| 17 | Demolition of stone slabs and tiles of any description or thickness in floors, platform, aprons etc., laid, bedded and pointed in any mortar , stacking serviceable slbs at site and removal of entire debris as ordered outside MOD land complete all as directed. |
| 18 | Demolition and breaking up 150mm bore drain pipes, salt glazed stone ware set in cement mortar including PCC haunching and bedding, complete |
| 19 | Excavating in post holes (or similar holes) each not exc 0.50 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exc 25cm, watering, and removing surplus soil to a distance not exc 50 m and making good surface in soft/ loose soil. |
| 20 | M & L for PCC 1 :4 : 8 type D2 using 40 mm graded crushed stone aggregate as in foundation filling, sunken repairing & mass concrete complete all as specified and directed Please Enable Macros to View BoQ information |
| 21 | M & L for PCC 1 :4 : 8 type D2 using 40 mm graded crushed stone aggregate as in foundation filling, sunken repairing & mass concrete complete all as specified and directed Please Enable Macros to View BoQ information |