Tender For Provn Of Water Filtration Plant With Connected Wks At Pithoragarh.
Tender Overview
Project Description
Tender for Provn Of Water Filtration Plant With Connected Wks At Pithoragarh.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 11-Jul-2026 | Amendment to Date 11 Jul 2026 | Date | 27-Jul-2026 |
| 2 | 20-Jul-2026 | Amendment to date | Date | 04-Aug-2026 |
| 3 | 27-Jul-2026 | date extension as on 27 Jul 2026 | Date | 11-Aug-2026 |
| 4 | 03-Aug-2026 | DATE EXTENSION CORRIGENDUM | Date | 18-Aug-2026 |
| 5 | 17-Aug-2026 | Date amendment | Date | 25-Aug-2026 |
| 6 | 17-Aug-2026 | Date amd | Date | 01-Sep-2026 |
| 7 | 10-Aug-2026 | AMENDMENT TO DATE | Date | 25-Aug-2026 |
| 8 | 10-Aug-2026 | AMENDMENT TO DATE | Date | 25-Aug-2026 |
| 9 | 31-Aug-2026 | Amendment to date as on 31 Aug 2026 | Date | 15-Sep-2026 |
| 10 | 14-Sep-2026 | AMDT to date | Date | 29-Sep-2026 |
| 11 | 24-Aug-2026 | AMENDMENT TO DATE AS ON 24 AUG 2026 | Date | 08-Sep-2026 |
| 12 | 07-Sep-2026 | amendment to date as on 07 Sep 2026 | Date | 22-Sep-2026 |
| 13 | 21-Sep-2026 | Amendment to date as on 21 Sep 2026 | Date | 08-Oct-2026 |
| 14 | 14-Sep-2026 | AMDT to date | Date | 29-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | SCHEDULE A PART-I (BUILDING WORK) |
| 2 | Construction of RCC UG Sump in M-30 design mix of capacity 6.75 Lakhs Ltr capacity complete all as specified and as shown on drawings. |
| 3 | Construction of filtration plant shed complete all as specified and as shown on drawings. |
| 4 | SCHEDULE A PART II ( SITE CLEARANCE AND EARTH WORK) for details refer Sch A in pdf folder |
| 5 | SCHEDULE A PART III (ROAD/PATH/CULVERT ) for details refer Sch A in pdf folder |
| 6 | SCHEDULE A PART IV (EXTERNAL WATER SUPPLY)Design,detailed engineering ,supply,installing and testing and commissioning of Ultra Filtration Treatment plant including all civil foundation works based on Ultra Filtration membrane technology (100 cubic meter / hour - 2 Nos.All the equipment,piping ,pumps and electrical panels to be housed in a plant room or as directed by the Engineer in Charge.The Ultra Filtration Plant shall be designed based on the following parameters:(i) Nature of Sewage-Treated Water from Water Treatment Plant,(ii)Daily Average Flow-3200KLD(2 Stream X 100 Cubic Meter /Hour Each).Civil Foundation works as requd at side shall be in PCC.Civil foundation work shall be as per pump manufacturer GA/foundations drawings.Contractor shall prepare and provide reqd civil and mechanical /Electrical shop drawings for approval of Garrison Engineerr /Accepting Officer before execution of plant and machinery.Contractor shall ensure the submission of detailed GA drawings (Plan and section),P&I Diagram ,Schematic Diagram for the above mentioned component and additional component if so reqd for the complete working of the Utra filtration Plant. Please Enable Macros to View BoQ information |
| 7 | SCHEDULE A PART IV (EXTERNAL WATER SUPPLY)Design,detailed engineering ,supply,installing and testing and commissioning of Ultra Filtration Treatment plant including all civil foundation works based on Ultra Filtration membrane technology (100 cubic meter / hour - 2 Nos.All the equipment,piping ,pumps and electrical panels to be housed in a plant room or as directed by the Engineer in Charge.The Ultra Filtration Plant shall be designed based on the following parameters:(i) Nature of Sewage-Treated Water from Water Treatment Plant,(ii)Daily Average Flow-3200KLD(2 Stream X 100 Cubic Meter /Hour Each).Civil Foundation works as requd at side shall be in PCC.Civil foundation work shall be as per pump manufacturer GA/foundations drawings.Contractor shall prepare and provide reqd civil and mechanical /Electrical shop drawings for approval of Garrison Engineerr /Accepting Officer before execution of plant and machinery.Contractor shall ensure the submission of detailed GA drawings (Plan and section),P&I Diagram ,Schematic Diagram for the above mentioned component and additional component if so reqd for the complete working of the Utra filtration Plant. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-10 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysCorrigendum-11 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-12 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-13 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 13 daysCorrigendum-14 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender