Name of Work:- Provn of Water filtration Plant with connected wks at Pithoragarh.
Sl. No.
Item Description
1
SCHEDULE A PART-I (BUILDING WORK)
2
Construction of RCC UG Sump in M-30 design mix of capacity 6.75 Lakhs Ltr capacity complete all as specified and as shown on drawings.
3
Construction of filtration plant shed complete all as specified and as shown on drawings.
4
SCHEDULE A PART II ( SITE CLEARANCE AND EARTH WORK) for details refer Sch A in pdf folder
5
SCHEDULE A PART III (ROAD/PATH/CULVERT ) for details refer Sch A in pdf folder
6
SCHEDULE A PART IV (EXTERNAL WATER SUPPLY)Design,detailed engineering ,supply,installing and testing and commissioning of Ultra Filtration Treatment plant including all civil foundation works based on Ultra Filtration membrane technology (100 cubic meter / hour - 2 Nos.All the equipment,piping ,pumps and electrical panels to be housed in a plant room or as directed by the Engineer in Charge.The Ultra Filtration Plant shall be designed based on the following parameters:(i) Nature of Sewage-Treated Water from Water Treatment Plant,(ii)Daily Average Flow-3200KLD(2 Stream X 100 Cubic Meter /Hour Each).Civil Foundation works as requd at side shall be in PCC.Civil foundation work shall be as per pump manufacturer GA/foundations drawings.Contractor shall prepare and provide reqd civil and mechanical /Electrical shop drawings for approval of Garrison Engineerr /Accepting Officer before execution of plant and machinery.Contractor shall ensure the submission of detailed GA drawings (Plan and section),P&I Diagram ,Schematic Diagram for the above mentioned component and additional component if so reqd for the complete working of the Utra filtration Plant. Please Enable Macros to View BoQ information
7
SCHEDULE A PART IV (EXTERNAL WATER SUPPLY)Design,detailed engineering ,supply,installing and testing and commissioning of Ultra Filtration Treatment plant including all civil foundation works based on Ultra Filtration membrane technology (100 cubic meter / hour - 2 Nos.All the equipment,piping ,pumps and electrical panels to be housed in a plant room or as directed by the Engineer in Charge.The Ultra Filtration Plant shall be designed based on the following parameters:(i) Nature of Sewage-Treated Water from Water Treatment Plant,(ii)Daily Average Flow-3200KLD(2 Stream X 100 Cubic Meter /Hour Each).Civil Foundation works as requd at side shall be in PCC.Civil foundation work shall be as per pump manufacturer GA/foundations drawings.Contractor shall prepare and provide reqd civil and mechanical /Electrical shop drawings for approval of Garrison Engineerr /Accepting Officer before execution of plant and machinery.Contractor shall ensure the submission of detailed GA drawings (Plan and section),P&I Diagram ,Schematic Diagram for the above mentioned component and additional component if so reqd for the complete working of the Utra filtration Plant. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.