Tender For M&L For Collecting The Samples From Raw Sewage Sump And Treated Water Sump Monthly From Stp I.E. Before And After Treatment, Sample Handling, Transporting To Nabl Approved Accredited Laboratory To Carry Out The Analysis Of The Following
Tender Overview
Project Description
Tender for M&L For Collecting The Samples From Raw Sewage Sump And Treated Water Sump Monthly From Stp I.E. Before And After Treatment, Sample Handling, Transporting To Nabl Approved Accredited Laboratory To Carry Out The Analysis Of The Following As Per Latest Is Methods Complete All As Specified And As Directed. (I)Bod (Biological Oxygen Demand) (Ii)Cod (Chemical Oxygen Demand) (Iii)Tss(Total Suspended Solids) (Iv) Fecal Coliform (V)Turbidity (Vi)Ph (Vii)Total Kjeldahl Nitrogen (Viii Total Phosphorous (Ix) Total Ammonia Nitrogen , M&L For Cleaning The Raw Sewage Reinforced Cement Concrete Sump Of Capacity Not More Than 2.5 Lakh Litres At Any Location Once In 11 Months.The Cleaning Includes The Following Complete All As Specified And As Directed. A)The Complete Job To Be Carried In A Single Day. B)Removal Of Left Over Dirty Water And Sludge With A Sewage Sludge Removal Pump. C) Removal Of Remaining Sludge From The Floor With The Help Of Industrial Vacuum Cleaner And Scrapping The Hard Accumulated Sewage. D)Spraying Of Non-Toxic, Bio-Degradable, Eco-Friendly Anti-Bacterial Agent To Disinfect The Tank From All Harmful Pathogens. , M&L For Cleaning The Raw Sewage Reinforced Cement Concrete Sump Of Capacity Not More Than 2.5 Lakh Litres At Any Location Once In 11 Months.The Cleaning Includes The Following Complete All As Specified And As Directed. A)The Complete Job To Be Carried In A Single Day. B)Removal Of Left Over Dirty Water And Sludge With A Sewage Sludge Removal Pump. C) Removal Of Remaining Sludge From The Floor With The Help Of Industrial Vacuum Cleaner And Scrapping The Hard Accumulated Sewage. D)Spraying Of Non-Toxic, Bio-Degradable, Eco-Friendly Anti-Bacterial Agent To Disinfect The Tank From All Harmful Pathogens.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Jul-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 15-Jul-2026 |
| 2 | 03-Jul-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 10-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | M&L for collecting the samples from raw sewage sump and treated water sump monthly from STP i.e. before and after treatment, sample handling, transporting to NABL approved accredited laboratory to carry out the analysis of the following as per latest IS methods complete all as specified and as directed.(i)BOD (Biological Oxygen Demand)(ii)COD (Chemical Oxygen Demand)(iii)TSS(Total Suspended Solids)(iv) Fecal Coliform(v)Turbidity(vi)PH (vii)Total kjeldahl Nitrogen (viii Total Phosphorous(ix) Total Ammonia Nitrogen |
| 2 | M&L for cleaning the raw sewage RCC sump of capacity not more than 2.5 Lakh Litres at any location once in 11 months.The cleaning includes the following complete all as specified and as directed.a)The complete job to be carried in a single day.b)Removal of left over dirty water and sludge with a sewage sludge removal pump.c) Removal of remaining sludge from the floor with the help of industrial vacuum Cleaner and scrapping the hard accumulated sewage.d)Spraying of Non-toxic, bio-degradable, eco-friendly anti-bacterial agent to disinfect the tank from all harmful pathogens. Please Enable Macros to View BoQ information |
| 3 | M&L for cleaning the raw sewage RCC sump of capacity not more than 2.5 Lakh Litres at any location once in 11 months.The cleaning includes the following complete all as specified and as directed.a)The complete job to be carried in a single day.b)Removal of left over dirty water and sludge with a sewage sludge removal pump.c) Removal of remaining sludge from the floor with the help of industrial vacuum Cleaner and scrapping the hard accumulated sewage.d)Spraying of Non-toxic, bio-degradable, eco-friendly anti-bacterial agent to disinfect the tank from all harmful pathogens. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender