| 1 | M&L for scrapping old epoxy paint surfaces and cleaning of all dust ,dirt, paint, moisture, oil, grease and all foreign material from the floor by mechanically scarifying, grinding, vacuum cleaning by using scrubbers, hard blowers , vacuum cleaners, moisture testing etc for 1-2 mm top concrete layer till good concrete surface free from all foreign materials is obtained and then cleaned by acid itching with alkaline wash followed by healthy water wash then the floor should be cleaned by using appropriate solvent, degreaser/cleaner to remove all residues to the entire satisfaction of GE. |
| 2 | M&L for application of low viscous epoxy primer having resin and hardener mixed and laid to a thickness as per manufacturer’s instructions with in pot life to the entire satisfaction of GE. Test certificate to be provided by manufacture. |
| 3 | M&L for treatment of construction joints and floor cracks by racking the old material, joints filling material, cutting and repairing the joint/surface with high strength epoxy resin mortar and dressing the joint to perfect right angle and filling with cold applied high performance and hybrid carbon resistance PU joint sealant of thickness 10mm x 25mm all as per manufacturer’s instructions and entire satisfaction of GE. |
| 4 | M&L for screed of 5 mm thick made of solvent free combination of epoxy resin, modified amine hardeners of high crushing strength and mechanically inert aggregate made in a uniform thickness laid on the prepared surface using a squeegee or a notched trowel. The mixing of material should be done correctly with an electric variable speed mixer and the entire contents should be mixed thoroughly and spread to uniform thickness before expiry of pot life as per manufacturer’s instructions. The record of measurement of thickness at random places should be maintained. The screed layer so laid has to be de-aerated by spiker rolled to dislodge air pockets as per manufacturer’s instruction and to the entire satisfaction of GE. Test certificate to be provided by manufacture. |
| 5 | M&L for providing/applying EPU based self levelling top coat of Flexo hard EPU to yield and average thickness of 1mm. The volumetric mixing ratio will be 2:1 as per manufacturer's instructions. The compressive strength of the top coat will be in the range of 45-50% and Flexural strength in the range 40-45 Mpa. Top coat wear resistance (weight loss) /Abrasion Resistance < 37mg all as per manufacturer's instructions and entire satisfaction of GE. Test certificate to be provided by manufacture. |
| 6 | M&L for preparation of new epoxy PU anti static floor surface gloss surface and application of 10 cm width or girth epoxy polyurethane paint marking in white/orange/golden/yellow over primer in lines, dashes, arrows, letters etc all as per manufacturer’s instructions and entire satisfaction of GE. |
| 7 | Dismantling expanded metal, any thickness or mesh, fixed with steel or wood fillets, if any weight per sqm not exc 4 Kg complete all as specified & as directed. |
| 8 | S&F for welded wire mesh netting size 2.4mm dia and 25mm mesh lathing to wood or metal studding, joists, etc. in walls, ceilings, stanchions, beams, etc. including all laps, cutting and waste for height 10mtr to 12mtr including all scaffolding, safety equipment required to fixing the wire mesh etc complete all as specified & as directed. |
| 9 | Dismantling wrought iron or mild steel work of any description not otherwise provided for gates etc. complete all as specified & as directed. |
| 10 | M&L for Rolled sections as in framing for cladding, glazing and the like fixed with angle cleats and connecting plates, for height 10mtr to 12 mtr including all scaffolding, safety equipment required to fixing the material etc. conforming to Grade E-165 (Fe 290) including necessary cutting, welding etc and fixing in position complete all as specified & directed. |
| 11 | M&L for complete removal of existing treatment and for preparation of old painted surface and applying two coat of exterior weather proof paint emulsion APEX of Shade as selected by GE complete all as specified and as directed upto 10mtr height of building. |
| 12 | M&L for preparation of old treated surfaces on ceiling applying one coat of white wash on walls complete all as specified and directed upto height of G+2 bldg by Engineer-in-Charge. |
| 13 | M&L for complete removal of existing treatment and preparation of old surfaces of walls and applying two coats of oil bound distemper oil emulsion white or tinted on walls including chalk whitening over plaster surface wall to achieve smooth finish to wall upto height of G+2 bldg etc complete all as specified and as directed. |
| 14 | M&L for complete removal of old steel surfaces paint of any description or girth over 10 cm width or girth and applying two coat of high gloss deco paint with spray machine including cleaning, stopping and rubbing down, removing all drops and dirt all upto height of 10 mtr to 12 mtr including scaffolding and safety equipment all as specified and directed. |
| 15 | M&L for preparation of old steel surfaces of any description or girth over 10 cm width or girth and applying one coat of synthetic enamel paint including cleaning, stopping and rubbing down, removing all drops and dirt all as specified and directed by Engr-in-Charge. |
| 16 | M&L for preparation of new steel surfaces of any description or girth over 10 cm width or girth and applying two coats of synthetic enamel paint over red oxide with spray machine including cleaning, stopping and rubbing down, removing all drops and dirt all upto height of 10 mtr to 12 mtr including scaffolding and safety equipment complete all as specified and directed. |
| 17 | Taking down cement plaster on brick/stone walls etc including racking out joints, hacking for key, scrubbing down with water etc. complete all as specified and directed. |
| 18 | M&L for rendering 10mm thick in CM 1:6 on fair faces of brick work or concrete surfaces, finished surface even & smooth without using extra cement complete all as specified and directed. |
| 19 | M&L for rendering 15mm thick in CM 1:4 on fair faces of brick work or concrete surfaces, finished surface even and fair without using extra cement external surface including mixing of water proofing compound @ 200 ml/bag complete all as specified and as directed.Note:- Water proofing compound shall be measured and paid separately. |
| 20 | M&L for rendering 5mm thick in cement and sand mortar 1:3 on concrete surface in ceiling complete all as specified and as directed. |
| 21 | Supply only liquid water proofing compound complete all as specified and as directed. |
| 22 | M&L for preparation of new plastered surfaces of walls and applying two coats oil bound distemper over a coat of chalk whitening preparatory to distemper complete all as specified and directed. |
| 23 | M&L for preparation of new plastered surfaces of walls and applying two coats of apex over a coat of alkali primer on walls etc complete all as specified and as directed. |
| 24 | M&L for preparation of new plastered surfaces of walls and applying three coats of white wash on ceiling complete all as specified and directed. |
| 25 | M&L for Pre- painted galvalume aluminium zinc coating GI based corrugated steel sheet 1 mm thick of an colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws. The cladding system shall be fixed with screws as per manufacture instruction. All sheets to be coated with AZ 150 GSM coating etc including dismantling of plain or corrugated steel sheeting, any gauge, thickness or similar pattern roof coverings from height 10mtr etc complete all as specified and directed. |
| 26 | M&L for 2mm thick fibre glass reinforced translucent corrugated sheeting with two corrugations side lap fixed with coach screw and washer in roof, wall etc. including dismantling of plain or corrugated steel sheeting, any gauge, thickness or similar pattern roof coverings from height 10mtr etc complete all as specified and directed. |
| 27 | M&L for drain pipe made of 1mm GI sheet size as directed by GE, with valley gutter including all support fixing complete all as specified and directed by Engr-in-charge. |
| 28 | S&F bird board of 1mm thick GI sheet with screws, size and colour as directed by GE, fixed at site complete all as specified and directed. Please Enable Macros to View BoQ information |
| 29 | S&F bird board of 1mm thick GI sheet with screws, size and colour as directed by GE, fixed at site complete all as specified and directed. Please Enable Macros to View BoQ information |