| 1 | Demolishing R.C.C. Work manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, nishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 4 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc.,including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes |
| 5 | C.G.I. SHEETS ROOFINGProviding corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gram/m |
| 6 | Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete. 0.63 mm thick with zinc coating not less than 275 gram/m2 |
| 7 | 6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Lintel,beams. |
| 9 | Removal of mulba from site of work to beyond muncipal Muncipal limits including loading unloading complete |
| 10 | Carriages of material by MT av lead 10 km sand and bajri |
| 11 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven storey height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup andlock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S.staircase system in the scaffoldings for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will bemade once irrespective of duration of scaffolding.NOTE:- To be used for maintenance work judicially necessary deduction for scaffolding in the existing item to be done |
| 12 | providing and fixing of Inaugration of Name Plate including Pedstal all complete job |
| 13 | Engaging Labours of Clearance of Site, all other allied works |
| 14 | provision for structural Design from an certified consultancy incl;uding vetting of drawing all complete job |
| 15 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work Please Enable Macros to View BoQ information |