| 1 | Erection of auxiliary structure required for installation of CTs, PTs, CVTs etc and all other equipments. The job consist of shifting of all material i.e. structure parts, nut bolts washer etc. from store to site of erection. Erection of structure as per relevant drawing and practice using flat/spring washer with each bolt matching holes, cutting notching of members if reqd. shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material & T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost. |
| 2 | Erection of following 132 KV equipments as per instruction manual of various equipment & technical specification including shifting of equipment from different storage location of ETD-I to site if required including all other associated work to complete the job satisfactorily: |
| 3 | 145KV Circuit Breaker |
| 4 | 145KV CT/PT |
| 5 | 145KV Line Isolator |
| 6 | 145KV Tandem Isolator |
| 7 | 145KV Bus Isolator |
| 8 | 145KV Post Insulator |
| 9 | 120KV L.A |
| 10 | C.T. junction boxes with 21 Nos. Disconnecting type link for 145KV CT/CVT |
| 11 | Transformer control & relay panel |
| 12 | Erection of following 33 KV equipments as per instruction manual of various equipment & technical specification including shifting of equipment from store to site including all other associated work to complete the job satisfactorily: |
| 13 | 33 KV VCB |
| 14 | 33 KV Bus Isolator |
| 15 | 33 KV CT |
| 16 | 33 KV LA |
| 17 | 33 KV CT Junction Box |
| 18 | Laying of following sizes of control cable in the cable trenches from C/R Panel to various equipment marshalling boxes/JB etc. in switch yard as per cable schedule, its saddling at every 75mm dist. with M.S. Saddle of size 25x3mm size including carriage of cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per tech. specification: |
| 19 | 2 x 2.5mm unarmored |
| 20 | 4x2.5mm – do - |
| 21 | 6x2.5mm – do - |
| 22 | 10x2.5mm – do - |
| 23 | Termination of following size of cable(including 33 KV side required terminations) as laid above as per cable schedule including making necessary holes in glands, plate or box where ever required, supply and fixing of cable glands of appropriate size. Supply and providing ferrules and No. for each core of cable and its termination with crimping type lugs of Dowell/Tension and all other associated work to complete the job satisfactorily as per tech. specification: |
| 24 | 2x2.5mm unarmored |
| 25 | 4x2.5mm – do – |
| 26 | 6x2.5mm – do – |
| 27 | 10x2.5mm – do – |
| 28 | Interconnection & jumpering of all equipments and Main/Transfer bus bar including cutting, bending of conductor and jumpering clamping above with all other associated work to complete the work satisfactorily as per drawing and tech. specification of newly erected 132 KV DLW bay.(1 Job for each bay) |
| 29 | Stringing of 3-Phase 132 KV Jack Bus Bar with Panther Conductor length of as per Requirement. The work include cutting and bending of conductor, fixing of single/double bolted type tension/suspension fitting . Hosting of disc insulator and shifting of material from erection site to work site with all associated work required for successful completion of Job. (1 Job for stringing of 3 Phase Jack Bus for each bay) |
| 30 | Extension of 132 KV DLW (UPPTCL)-132 KV DLW (Railway) Line by 24 metre with the help of Gantries. The work include cutting and bending of conductor, fixing of single bolted type tension/suspension fitting. Hosting of disc insulator and shifting of material from erection site to work site with all associated work required for successful completion of Job. (1 Job for extension of 24 meters) |
| 31 | Interconnection & jumpering of all equipments and Main bus bar including cutting, bending of conductor and jumpering clamping above with all other associated work to complete the work satisfactorily as per drawing and tech. specification of newly erected LV side 40 MVA transformer bay.(1 Job for each bay) |
| 32 | Dismantling of 03 Nos. of 132KV PT and 03 Nos. of 132KV LA of 132 KV DLW(Railway) Bay,1 No 132KV Bus Isolator and 1 No 132KV Line Isolator, Fire hut. The work includes careful dismantling of above said equipments with the help of derrick pole after opening of Jumpers and terminations and then shifting these equipments to the Open store. |
| 33 | Dismantling of old security fencing and horizontal angle pales, including gas cutting of stay and upright for extension of switchyard, including dismantling base of above ground level and shifting material at safe place. |
| 34 | Erection of pale fencing for switchyard by way of grouting vertical upsise at approx 3 mtr apart in pit size 350x350x370mm with 1:2:4 cement stone, blast and sand ratio and making platform then fixing of horizontal runner and pales with suitable size of nut bolt and washer including cost of men ,material and T&P but excluding cost of pale fencing and including tag welding of pale fencing all other associated work fencing include welding shifting the material to site etc. including cost of nut & Bolt. |
| 35 | Painting of Newly erected pale fencing by scratching, rubbing, with wire brush, cleaning applying one coat of red oxide primer and two coat of synthetic enamel paint of bus green color of standard quality. |
| 36 | Carriage of 20KL transformer oil tank from any Store of UPPTCL Distance 150KM from132KV SS DLW to 132 KV S/S DLW and shifting back after the completion of Work. |
| 37 | Shifting of New 132/33 KV T/F from working site to transformer plinth upto distance approx. 20 mtr including turning of transformer if required. |
| 38 | Shifting of 132/33KV Transformer from stacking place to working site approx. 100Mtr @ 5 Mtr/Job at 132KV S/S DLW. |
| 39 | Complete erection of 40 MVA T/F. The work includes erection of radiators, Conservator tank, all bushings & turrets, Connecting Pipes, Cooling Fans, OLTC RTCC Panel, DM Box, Oil Pumps and associated pipeline including first filling of T/F oil in Main Tank, radiator, Oil Pipe Line & Conservator tank to complete the job Satisfactorily. |
| 40 | Centrifuging of Complete Transformer Oil through Centrifuging Machine till required parameters of BDV and PPM is achieved. Note: Centrifuging Machine shall be arranged by Contractor and the oil test result from any NABL certified lab only acceptable. |
| 41 | Jumpering of HV bushing /LA of 40 MVA TF with panther conductor. |
| 42 | BDV, PPM and DGA Testing of oil sample of Transformer after 15 Days from date of energisation the work includes taking oil sample in sample bottle and testing from any NABL accrediated lab |
| 43 | Cutting straightening , bending, laying 700mm below inside ground and above ground sizes 75x10 mm M.S. Flat for earthing of equipment, and TF Body etc, of New 132 KV DLW bay and 40 MVA Transformer Bay including welding with main earth mat and with object to be earthed, excavation of trenches, its back filling, painting with synthetic enamel bus green color above ground and black bituminous compound underground and all other associated work as required to complete the work satisfactorily. |
| 44 | Cutting straightening , bending, laying 700mm below inside ground and above ground of sizes 50 x6 mm M.S. Flat for earthing of auxiliary structure, equipment structure, and equipments etc., of New 132 KV DLW bay and 40 MVA Transformer Bay including welding with main earth mat and with object to be earthed, excavation of trenches, its back filling, painting with two coat of synthetic enamel bus green color and one coat of primer above ground and black bituminous compound underground and all other associated work as required to complete the work satisfactorily. |
| 45 | Earthing of cable racks with 25x6mm MS flat including cutting, bending and wielding as per the actual need and jointing the same with main earth mat painting with two coat of synthetic enamel bus green color and one coat of primer above ground and black bituminous compound underground and all other associated work as required to complete the work satisfactorily. including the cost of man, material , T&P required for the satisfactorily completion of job. |
| 46 | Fabrication of Delta of HV and LV neutral bushing inside the pit after digging a pit of 1.5mX1.5mX1m depth. Cutting 03 nos. of 40mm MS round of length 03m each by gas cutter and inserting them into earth in triangular shape at a distance of 01 metre. The upper end of these MS round will be connected through MS flat of size 75x10mm by the way of welding and these MS flat should be connected through neutral bushing through 75x10mm MS flat by welding the two MS flats. Also connecting this Delta with Main Earth mat with two different places I.E. X axis and Y axis of main earthmat Grid. |
| 47 | Special earthing of 120 KV/36KV LA consisting of 6 Nos. 3 mtr. long electrodes its placing inside the ground and connecting all six electrodes with 75 x10 mm MS flat and connecting the same with main earth mat two place required excluding cost of MS strip & cost of M S round bar. |
| 48 | Laying of 40 mm dia MS round bar 0.7 Meter below ground level including cutting, bending, straightening, welding, and painting, excavation, back feeling & all other associated work to complete the job satisfactorily as per direction of Engineer in charge (M.S. round bar shall be provided by department). |
| 49 | Fabrication of electrode by 40 mm dia MS rods in length of 3 mtr by making an edge at one end for ease in piercing below 1200mm into the ground using wooden hammer completely at all the junction points along with welding & painting at outer periphery of earth mat as per Technical specification and direction of supervising engineer. (M.S. round bar shall be provided by department). |
| 50 | Interconnection of the earth mat laid with the existing earth mat of the 132 KV S/S DLW at specified point by welding as that complete earth mat acts in coherent manner to provide proper earthing of the substation. |
| 51 | Providing and fixing of name plate made of 02 mm thick aluminum sheet with covering of 3M HIP Type retro reflective sheeting of size 300mmx150mm. The plates to be fixed with the help of nuts and bolts on already installed equipment structure. |
| 52 | Providing and fixing of phase plate equipment/bus made of 02 mm thick aluminum sheet with covering of 3M HIP Type retro reflective sheeting of size 5” dia. The plates to be fixed with the help of nuts and bolts on already installed equipment structure.(01 set= 03 plates each for R,Y and B phase) |
| 53 | Fabrication of display board made of M.S. angle iron 50x50x6mm, 3 long support and M.S. board of 2'x1' M.S. sheet 18 gauge and M.S. flat iron 25x6mm size 2'x1' welded on M.S. sheet after then M.S. pipe of 1.5\\" dia. fitted around M.S. flat on the sheet board and 0.5\\" dia M.S. pipe 4\\" long welded in M.S. angle iron from two places at one side and two at other to complete the display board. Digging pit size 2'x2'x3' and grouting above board with 1:2:4 cement, ballast, sand ratio and making plinth of size 1'x2'. Board shall duly painted by yellow color and equipment name shall be written in black. |
| 54 | Opening of all jumpers of Twin ACSR Panther/Moose connected to 33 KV Bus isolator and main Bus etc and shifting of received material from site to store including proper stacking. |
| 55 | Dismantling of all 3 phase Twin Moose conductor in 3 span of 33 KV main bus with tension fitting and disc insulators etc including shifting and proper stacking of the received material to the store of sub station.(1 job= 1 span per phase) |
| 56 | Stringing of 3 phase twin Moose conductor 3 nos section of 33 KV main bus with fittings insulators, spacers at required intervals etc including shifting of the required materials from the store of the sub station to the site location. (1 job= 1 span per phase) |
| 57 | Jumpering of 33 KV twin Moose/Panther conductor with bus, bus isolator, transformer isolator, PT etc including fitting and tightening of clamp properly and shifting of required material from store to site location. |
| 58 | Fixing of rigid spacer clamps at an equal interval between both moose conductors of twin bus bar. |
| 59 | Shifting of all Material (CT, PT, Isolator, Conductor open and in Drum, Post Insulator, Damaged hardware fittings, Cable Drums, Damaged breaker, Breaker Poles ETC from open store to other site inside the substation premises with due care at 132KV Substation DLW. |
| 60 | Construction of 02 Nos. fire hut of size 3000X 2400X2400 mm duly made of G.I./ M.S. angle post support & frame structure covered by asbestos corrugated (A.C.) roofing sheet and B.C. Plate form as per technical specification consumables and T&P etc. required for the job as per details given below |
| 61 | Grouting of 04 No. 65X65X6 mm G.I./ M.S. Angle posts of size 3000 mm after due fabrication with C.C. mixture in the ratio of 1:2:4 Fixing & welding of open hut type G.I./M.S. angle. Angle frame structure of size 3000X2400X2400 mm by due fabrication with 65X65X6 mm size & 50X50X5 mm size G.I./M.S. angles on above grouted G.I./ M.S. Angle posts by due cutting drilling welding etc. of G.I./M.S. Angles to be provided by department for each fire Hut. |
| 62 | Construction of B.C. Floor/ Platform size3.60X3.00X0.20 M for each fire hut with first class Brick Ballast cement & sand mixture in the ratio of 1:4:8 and finally 12 mm thick plastering with cement & sand mixture in the ratio of 1:4 . |
| 63 | Fixing of 2 No. M.S. B.P. Sheet Board of size 300X150 mm in the angle frame structure of each fire hut after due fabrication by cutting drilling welding etc. of M.S. B.P. Sheet. |
| 64 | Providing and fixing of new tubular asbestos sheet & fixing on framed structure of store with u-clamp jointing seals with seizing compound of store roof for fire hut. |
| 65 | Painting of above angle post& Frame structures with post office red color synthetic enamel paint of first quality in two coats after applying one coat of red oxide Primer and finally writing 'AAG' and 'FIRE' on the M.S. Sheet Boards for each Fire Hut. |
| 66 | SUPPLY |
| 67 | Supply & fixing of 150W outdoor type LED flood light complete fitting with all fixing accessories including bracket and clamps of Philips/Crompton/Havells/Bajaj/Halonix make. Original warranty card should also be submitted along with above material. |
| 68 | Providing/Supply of 2 Ton window air conditioner of Voltas/Carrier/O General make including installation and commissioning of above AC with making wooden frame suitable for 2 ton AC at 132KV Sub Station DLW. Including Providing and Fixing of 5 KVA Copper wounded ,90V-300V 4000W heavy Duty Mainline Voltage Stabilizer ISI marked of Standard Make suitable for 2 Ton AC. |
| 69 | Providing and laying of multi strand 4 sq.mm PVC insulated 'CU' wire for air conditioner. |
| 70 | Providing and fitting of Single Phase MCB of 32 Amp with AC Box circuit wise comprising of load of each circuit. |
| 71 | 132KV Tension insulator String and Associated Hardware Fitting with turn buckle suitable for Moose Conductor |
| 72 | 132KV Tension insulator String and Associated Hardware Fitting without turn buckle suitable for Moose Conductor |
| 73 | 132KV Suspension insulator String and Associated Hardware Fitting with drop clamp suitable for Moose Conductor |
| 74 | Bolted type Double tension fitting suitable for twin Moose conductor complete in all respect having ball and socket, clevis eye, socket clevis, Yoke plate with 2 numbers tension clamp bolted type made of high strength LM-6 aluminium alloy with 5 number U-Bolts complete set Suitable for 33 kV bus bar of twin Moose conductor Without Turn Buckle. |
| 75 | Bolted type Double tension fitting suitable for twin Moose conductor complete in all respect having ball and socket, clevis eye, socket clevis, Yoke plate with 2 numbers tension clamp bolted type made of high strength LM-6 aluminium alloy with 5 number U-Bolts complete set Suitable for 33 kV bus bar of twin Moose conductor With Turn Buckle. |
| 76 | Bolted type Single Tension insulator String and Associated Hardware Fitting with Turn Buckle Suitable for 132KV Jack Bus Panther Conductor. |
| 77 | 33 kV Isolator clamp for twin Moose conductor made of aluminium alloy with nut bolt and washers suitable for RAMA make isolator and as per sample. |
| 78 | Double bolt spacer suitable for twin Moose conductor 250mm space made of high strength LM-6 aluminium alloy complete set. |
| 79 | GI Nut bolt of Size 16x40mm |
| 80 | GI Nut bolt of Size 16x45mm |
| 81 | GI Nut bolt of Size 16x50mm |
| 82 | Spring Washer Size 16x3.5mm |
| 83 | MS Flat 75x10 mm |
| 84 | MS Flat 50x6 mm |
| 85 | MS Flat 25x6 mm |
| 86 | GI Perforted Cable Tray 225 MM |
| 87 | GI Perforted Cable Tray 75 MM |
| 88 | 40mm dia MS electrodes of 3 meter length |
| 89 | Copper Bond as per Sample |
| 90 | Bus Post clamp suitable for Moose Please Enable Macros to View BoQ information |