Housing Urban and Rular Development Government Departments Closing in 4 days TDR #55954629

Tender For Mobilisation Charges Of All Tools & Plants Along With Accessories, Material, Labour, Supervision Etc. At Site Of Work Required In Connection With Boring And Testing Work, Including Setting Up Boring Rigs And Shifting To Different Bore-Hole

Issued by Government Departments · Asansol, West Bengal
Tender Value
1.30 Lakhs
Estimated cost
Bid Submission
10 Jul 2026
4 days left
EMD
2600
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Asansol → West Bengal
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Mobilisation Charges Of All Tools & Plants Along With Accessories, Material, Labour, Supervision Etc. At Site Of Work Required In Connection With Boring And Testing Work, Including Setting Up Boring Rigs And Shifting To Different Bore-Hole Points Etc. And Also Including Withdrawal Of Same From The Site After Completion Of Work, Complete As Per Direction Of Engineer-In-Charge. B) Detailed Investigation Payment Will Be Made After Successful Completion Of Work. Preliminary Investigation Is Mainly For Collection Of Disturbed Samples Where Deployment Of Heavy Machineries Is Not Involved. , Carriage Of All Disturbed & Undisturbed Samples From Site Of Work To The Divisional Office Or Elsewhere Including Loading And Unloading As Per Direction Of Engineer-In-Charge. Detailed Investigation. Some Samples Are To Be Kept At Sub-Division Office For Additional Testing By The Engineer-In-Charge. Detailed Investigation. Some Samples Are To Be Kept At Sub-Division Office For Additional Testing By The Engineer-In-Charge. , Labour For Boring By Sinking And Finally Withdrawing 50Mm To 100Mm Dia. (Internal) Pipe By A Standard Method To Any Depth Below Ground Level / Bed Level In All Types Of Soil Like Clay, Silt, Sand, Stiff Clay, Mixed Soils Etc. Except Rocks, Including Collection Of Disturbed Soil Samples And Including Preparation And Submission Of Bore-Log As Per Standard Proforma And Also Including Hire Charges Of Tool And Plants Complete As Per Direction Of Engineer-Incharge. A) Depth 0M To 30M , A. Laboratory Investigation: I) Liquid Limit As Per Is 2720 (Part - V). , Ii) Plastic Limit As Per Is 2720 (Part - V) , Iii) Grain Size Analysis By Sieving As Per Is 2720 (Part - Iv). , Iv) Grain Size Analysis By Hydrometer Method As Per Is 2720 (Part - Iv). , V) Determination Of Water Content As Per Is 2720 (Part - Ii). , Vi) Determination Of Specific Gravity As Per Is 2720 (Part - Iii). , Vii) Direct Shear Test As Per Is 2720 (Part - Xiii). , Viii) Determination Of Unconfined Compression Strength As Per Is 2720 (Part - X). A) Undisturbed. , B) Remoulded. , Xii) Determination Of Water Contentdry Density Relation Usingheavy Compaction As Per Is 2720 (Part - Viii). , A) Determination Of Shear Strength Parameters Of A Specimen Tested In Unconsolidated Undrained Tri-Axial Compression Without Measurement Of Pore Water Pressure As Per Is 2720 (Part - Xi). , B) Determination Of Shear Strength Parameters Of A Specimen Tested In Consolidated Undrained Tri-Axial Compression Test With Measurement Of Pore Water Pressure As Per Is 2720 (Part - Xii). , C) Determination Of Shear Strength Parameters Of A Soil From Consolidated Drained Test As Per Is 2720 (Part - X). , Xix) Determination Of Centrifuge Moisture Equivalent As Per Is 2720 (Part- Xix). , Xxiv) Determination Of Ph Value As Per Is 2720 (Part- Viii). , B Field Investigation: Vi) Standard Penetration Tests (S.P.T.) By Split Spoon Sampler In The Bore Hole As Per Is 2131. (I)0.0M - 10.0M , (Ii)10.0M-20.0M , (Iii)20.0M-30.0M , Vii) Static Cone-Penetration Test As Per Is 4968 (Part - Iii). , Viii) Dynamic Cone-Penetration Test Using 50Mm Cone Without Using Bentonite Slurry As Per Is 4968 (Part - I). , Xiii) Load Tests Of Soils (Loading Arrangement Shallbe Done By The Client) As Per Is 1888. A) For Evaluation Of Bearing Capacity & Settlement , B) For Evaluation Of Sub-Grade Modulus , Xiv) Observation Of Water Table , Preparation And Submission Of Report In 6 (Six) Copies, Giving All Relevant Information Data Like Site Plan, Bore Log And Water Table, Test Results, Calculations, Discussions, Suggestions And Recommendations In Respect Of Suitable Foundation Etc. Including Determination Of Silt Factor Calculation Of Waterways And Complete Design Of Foundation Including Analysis Of Bearing Capacities And Settlements In Bound And Presentable Form Complete As Per Direction Of Engineer- In-Charge. B) Detailed Investigation , Gst @ 18%(Cgst 9% + Sgst 9%) Of Above , Labour Welfare Cess@1%

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 25-Jun-2026 Date Extain Date 01-Jul-2026
2 02-Jul-2026 Time Extansion Date 10-Jul-2026

BOQ

Name of Work:-
Sl. No. Item Description
1Mobilisation Charges of all tools & Plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different Bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of Engineer-in-Charge.b) Detailed InvestigationPayment will be made after successful completion of work. Preliminary Investigation is mainly for collection of disturbed samples where deployment of heavy machineries is not involved.
2Carriage of all Disturbed & Undisturbed Samples from site of work to the Divisional office or elsewhere including loading and unloading as per direction of Engineer-in-Charge. Detailed Investigation. Some samples are to be kept at Sub-Division Office for Additional testing By the Engineer-in-Charge. Detailed Investigation. Some samples are to be kept at Sub-Division Office for Additional testing By the Engineer-in-Charge.
3Labour for boring by sinking and finally withdrawing 50mm to 100mm dia. (internal) pipe by a standard method to any depth below ground level / bed level in all types of soil like clay, silt, sand, stiff clay, mixed soils etc. except rocks, including collection of disturbed soil samples and including preparation and submission of bore-log as per standard proforma and also including hire charges of tool and plants complete as per direction of Engineer-inCharge. a) Depth 0m to 30m
4A. Laboratory Investigation: i) Liquid Limit as per IS 2720 (Part – V).
5ii) Plastic Limit as per IS 2720 (Part – V)
6iii) Grain size analysis by Sieving as per IS 2720 (Part – IV).
7iv) Grain size analysis by Hydrometer Method as per IS 2720 (Part – IV).
8v) Determination of Water Content as per IS 2720 (Part – II).
9vi) Determination of Specific Gravity as per IS 2720 (Part – III).
10vii) Direct Shear Test as per IS 2720 (Part – XIII).
11viii) Determination of Unconfined Compression Strength as per IS 2720 (Part – X). a) Undisturbed.
12b) Remoulded.
13xii) Determination of Water ContentDry Density relation usingheavy compaction as per IS 2720 (Part – VIII).
14a) Determination of Shear strength Parameters of a specimen tested in Unconsolidated Undrained Tri-axial compression without measurement of pore water pressure as per IS 2720 (Part – XI).
15b) Determination of Shear strength Parameters of a specimen tested in Consolidated Undrained Tri-axial compression Test with measurement of pore water pressure as per IS 2720 (Part – XII).
16c) Determination of Shear strength Parameters of a soil from Consolidated Drained Test as per IS 2720 (Part – X).
17xix) Determination of Centrifuge Moisture Equivalent as per IS 2720 (Part– XIX).
18xxiv) Determination of pH Value as per IS 2720 (Part– VIII).
19B Field Investigation: vi) Standard Penetration Tests (S.P.T.) by Split Spoon Sampler in the bore hole as per IS 2131. (i)0.0m - 10.0m
20(ii)10.0m-20.0m
21(iii)20.0m-30.0m
22vii) Static Cone-Penetration Test as per IS 4968 (Part - III).
23viii) Dynamic Cone-Penetration Test using 50mm cone without using Bentonite slurry as per IS 4968 (Part – I).
24xiii) Load Tests of Soils (Loading arrangement shallbe done by the client) as per IS 1888. a) For evaluation of Bearing Capacity & Settlement
25b) For evaluation of sub-grade modulus
26xiv) Observation of Water Table
27Preparation and submission of report in 6 (Six) copies, giving all relevant information data like site plan, Bore log and water table, test results, calculations, discussions, suggestions and recommendations in respect of suitable foundation etc. including determination of silt factor calculation of waterways and complete design of foundation including analysis of Bearing Capacities and settlements in bound and presentable form complete as per direction of Engineer-in-Charge.b) Detailed Investigation
28GST @ 18%(CGST 9% + SGST 9%) of above
29Labour Welfare Cess@1% Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 55954629
AUTHORITY Government Departments
TENDER VALUE 1.30 Lakhs
LAST DATE 10-07-2026
Authority
Authority Name Public Works Department
Work Description Tender for Mobilisation Charges Of All Tools & Plants Along With Accessories, Material, Labour, Supervision Etc. At Site Of Work Required In Connection With Boring And Testing Work, Including Setting Up Boring Rigs And Shifting To Different Bore-Hole Points Etc. And Also Including Withdrawal Of Same From The Site After Completion Of Work, Complete As Per Direction Of Engineer-In-Charge. B) Detailed Investigation Payment Will Be Made After Successful Completion Of Work. Preliminary Investigation Is Mainly For Collection Of Disturbed Samples Where Deployment Of Heavy Machineries Is Not Involved. , Carriage Of All Disturbed & Undisturbed Samples From Site Of Work To The Divisional Office Or Elsewhere Including Loading And Unloading As Per Direction Of Engineer-In-Charge. Detailed Investigation. Some Samples Are To Be Kept At Sub-Division Office For Additional Testing By The Engineer-In-Charge. Detailed Investigation. Some Samples Are To Be Kept At Sub-Division Office For Additional Testing By The Engineer-In-Charge. , Labour For Boring By Sinking And Finally Withdrawing 50Mm To 100Mm Dia. (Internal) Pipe By A Standard Method To Any Depth Below Ground Level / Bed Level In All Types Of Soil Like Clay, Silt, Sand, Stiff Clay, Mixed Soils Etc. Except Rocks, Including Collection Of Disturbed Soil Samples And Including Preparation And Submission Of Bore-Log As Per Standard Proforma And Also Including Hire Charges Of Tool And Plants Complete As Per Direction Of Engineer-Incharge. A) Depth 0M To 30M , A. Laboratory Investigation: I) Liquid Limit As Per Is 2720 (Part - V). , Ii) Plastic Limit As Per Is 2720 (Part - V) , Iii) Grain Size Analysis By Sieving As Per Is 2720 (Part - Iv). , Iv) Grain Size Analysis By Hydrometer Method As Per Is 2720 (Part - Iv). , V) Determination Of Water Content As Per Is 2720 (Part - Ii). , Vi) Determination Of Specific Gravity As Per Is 2720 (Part - Iii). , Vii) Direct Shear Test As Per Is 2720 (Part - Xiii). , Viii) Determination Of Unconfined Compression Strength As Per Is 2720 (Part - X). A) Undisturbed. , B) Remoulded. , Xii) Determination Of Water Contentdry Density Relation Usingheavy Compaction As Per Is 2720 (Part - Viii). , A) Determination Of Shear Strength Parameters Of A Specimen Tested In Unconsolidated Undrained Tri-Axial Compression Without Measurement Of Pore Water Pressure As Per Is 2720 (Part - Xi). , B) Determination Of Shear Strength Parameters Of A Specimen Tested In Consolidated Undrained Tri-Axial Compression Test With Measurement Of Pore Water Pressure As Per Is 2720 (Part - Xii). , C) Determination Of Shear Strength Parameters Of A Soil From Consolidated Drained Test As Per Is 2720 (Part - X). , Xix) Determination Of Centrifuge Moisture Equivalent As Per Is 2720 (Part- Xix). , Xxiv) Determination Of Ph Value As Per Is 2720 (Part- Viii). , B Field Investigation: Vi) Standard Penetration Tests (S.P.T.) By Split Spoon Sampler In The Bore Hole As Per Is 2131. (I)0.0M - 10.0M , (Ii)10.0M-20.0M , (Iii)20.0M-30.0M , Vii) Static Cone-Penetration Test As Per Is 4968 (Part - Iii). , Viii) Dynamic Cone-Penetration Test Using 50Mm Cone Without Using Bentonite Slurry As Per Is 4968 (Part - I). , Xiii) Load Tests Of Soils (Loading Arrangement Shallbe Done By The Client) As Per Is 1888. A) For Evaluation Of Bearing Capacity & Settlement , B) For Evaluation Of Sub-Grade Modulus , Xiv) Observation Of Water Table , Preparation And Submission Of Report In 6 (Six) Copies, Giving All Relevant Information Data Like Site Plan, Bore Log And Water Table, Test Results, Calculations, Discussions, Suggestions And Recommendations In Respect Of Suitable Foundation Etc. Including Determination Of Silt Factor Calculation Of Waterways And Complete Design Of Foundation Including Analysis Of Bearing Capacities And Settlements In Bound And Presentable Form Complete As Per Direction Of Engineer- In-Charge. B) Detailed Investigation , Gst @ 18%(Cgst 9% + Sgst 9%) Of Above , Labour Welfare Cess@1%
Basic Detail
Tender No WBPWD/Rds/EEAHDeNIT-01/26-27
Bidding Type Tender
Location
City Asansol
State West Bengal
Key Dates
Publish Date 02 Jul 2026
Submission Date 10 Jul 2026
Open Date 13 Jul 2026
Finance
Tender Value 1.30 Lakhs
Tender Fee Ref. Documents
EMD 2600
Exemption Available
Document List
88cd2715-d10b-457e-b3f0-333502346ee2.html
BOQ_5084187.xls
Tendernotice_1 (12).pdf
Tendernotice_2 (2).pdf
Tendernotice_3.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 02, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 01, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 10, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 4 days
Jul 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Jul 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
html

88cd2715-d10b-457e-b3f0-333502346ee2.html

xls

BOQ_5084187.xls

pdf

Tendernotice_1 (12).pdf

pdf

Tendernotice_2 (2).pdf

pdf

Tendernotice_3.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders