|
| 1 | LED lamp 18 W |
| 2 | LED lamp 35 W |
| 3 | LED lamp 50 W |
| 4 | 20W LED Tube light fitting (4 feet in length) |
| 5 | LED Street light fitting 40W- 50 W IP65 &IK08 class |
| 6 | Street light bracket made from 25 mm dia |
| 7 | 2 core 6 sq. mm. aluminium |
| 8 | Grease |
| 9 | Gland Rope |
| 10 | Supplying & erecting crimping type aluminium lugs for cable 70 sq mm complete |
| 11 | Supplying & erecting crimping type aluminium lugs for cable 95 sq mm completecomplete |
| 12 | Supplying & erecting crimping type aluminium lugs for cable 120 sq mm complete |
| 13 | Supplying & erecting crimping type aluminium lugs for cable 185 sq mm complete |
| 14 | Supplying & erecting crimping type aluminium lugs for cable 240 sq mm complete |
| 15 | Supplying & erecting crimping type aluminium lugs for cable 300 sq mm complete |
| 16 | Supplying, erecting & terminating 4 core 70 sq. mm. aluminium armoured cable |
| 17 | Supplying, erecting & terminating 4 core 95 sq. mm. aluminium armoured cable |
| 18 | Supplying, erecting & terminating 4 core 120 sq. mm. aluminium armoured cable |
| 19 | Supplying, erecting & terminating 4 core 185 sq. mm. aluminium armoured cable |
| 20 | Supplying, erecting & terminating 4 core 240 sq. mm. aluminium armoured cable |
| 21 | Supplying, erecting & terminating 4 core 300 sq. mm. aluminium armoured cable |
| 22 | Rewinding of electric motor of 1 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 23 | Rewinding of electric motor of 2 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 24 | Rewinding of electric motor of 3 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 25 | Rewinding of electric motor of 5 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 26 | Rewinding of electric motor of 10 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 27 | Rewinding of electric motor of 60 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 28 | Rewinding of electric motor of 200 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 29 | Rewinding of electric motor of V.T. 120 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 30 | Rewinding of electric motor of V.T. 150 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 31 | Rewinding of electric motor of V.T. 170 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 32 | Rewinding of submersible pump motor of 5 HP with coated copper wires & overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 33 | Rewinding of submersible pump motor of 17.5 HP with coated copper wires & overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.) |
| 34 | Servicing, varnishing and greasing of 60 H.P. Motor |
| 35 | Servicing, varnishing and greasing of 120 H.P. Motor |
| 36 | Servicing, varnishing and greasing of 150 H.P. Motor |
| 37 | Servicing, varnishing and greasing of 170 H.P. Motor |
| 38 | Servicing, varnishing and greasing of 200 H.P. Motor |
| 39 | Replacing the existing bearing of approved make for electric motor of 1 H.P. of all types with due alignment of the shaft and tested. |
| 40 | Replacing the existing bearing of approved make for electric motor of 2 H.P. of all types with due alignment of the shaft and tested. |
| 41 | Replacing the existing bearing of approved make for electric motor of 7.5 H.P. of all types with due alignment of the shaft and tested. |
| 42 | Replacing the existing bearing of approved make for electric motor of 10 H.P. of all types with due alignment of the shaft and tested. |
| 43 | Replacing the existing bearing of approved make for electric motor of 12.5H.P. of all types with due alignment of the shaft and tested. |
| 44 | Replacing the existing bearing of approved make for electric motor of 17.5H.P. of all types with due alignment of the shaft and tested. |
| 45 | Replacing the existing bearing of approved make for electric motor of 60 H.P. of all types with due alignment of the shaft and tested. |
| 46 | Replacing the existing bearing of approved make for electric motor of 120 H.P. of all types with due alignment of the shaft and tested. |
| 47 | Replacing the existing bearing of approved make for electric motor of 150 H.P. of all types with due alignment of the shaft and tested. |
| 48 | Replacing the existing bearing of approved make for electric motor of 170 H.P. of all types with due alignment of the shaft and tested. |
| 49 | Replacing the existing bearing of approved make for electric motor of 200 H.P. of all types with due alignment of the shaft and tested. |
| 50 | Replacing the existing bearing of approved make for pump of 5 H.P. of all types with due alignment of the shaft and tested. |
| 51 | Replacing the existing bearing of approved make for pump of 12.5 H.P. of all types with due alignment of the shaft and tested. |
| 52 | Replacing the existing bearing of approved make for pump of 17.5 H.P. of all types with due alignment of the shaft and tested. |
| 53 | Replacing the existing bearing of approved make for pump of 60 H.P. of all types with due alignment of the shaft and tested. |
| 54 | Replacing the existing bearing of approved make for pump of120 H.P. of all types with due alignment of the shaft and tested. |
| 55 | Replacing the existing bearing of approved make for pump of 150 H.P. of all types with due alignment of the shaft and tested. |
| 56 | Replacing the existing bearing of approved make for pump of 170 H.P. of all types with due alignment of the shaft and tested. |
| 57 | Replacing the existing bearing of approved make for pump of 200 H.P. of all types with due alignment of the shaft and tested. |
| 58 | Supplying and erecting Starter for 0.75 H.P.Motor |
| 59 | Supplying and erecting Starter for 1.5 H.P.Motor |
| 60 | Supplying and erecting Starter for 3.5 H.P.Motor |
| 61 | Supplying and erecting Starter for 5 H.P.Motor |
| 62 | Supplying and erecting contactor for star Delta Motor Starter of 60 H.P. |
| 63 | Supplying and erecting contactor for star Delta Motor Starter of 150 H.P. |
| 64 | Supplying and erecting contactor for star Delta Motor Starter of 170 H.P. to 200 H.P. AX300-30 |
| 65 | Supplying, erecting & marking MCCB of 630A DN-3 4 P |
| 66 | Supplying, erecting & marking MCCB of 800A T6N 4 P |
| 67 | Supplying & erecting relay for Star Delta Motor Starter of 120 H.P. |
| 68 | Supplying & erecting relay for Star Delta Motor Starter of 150 H.P. |
| 69 | Supplying & erecting relay for Star Delta Motor Starter of 170 H.P. |
| 70 | Supplying & erecting relay for Star Delta Motor Starter of 200 H.P. |
| 71 | Supplying & erecting timer for Star Delta Motor Starter of all H.P. |
| 72 | Supplying & erecting of any size electrolyte copper patti or bar in bus bar chamber in panel or any other purpose, 500V with require capacity with 99.9% copper purity with fixing arrangement (like lug or bottle type lug) to both the end with high grade polyolefin insulation sleeve. |
| 73 | Supplying & erecting of any size electrolyte copper patti or bar in bus bar chamber in panel or any other purpose, 500 V with require capacity with 99.9% copper purity with fixing arrangement (like lug or bottle type lug) to both the end with high grade polyolefin insulation sleeve. |
| 74 | Supplying and erecting copper strip of required size used for earthing on wall and/or any other purpose with necessary copper clamps fixed on wall painted with bituminous paint in an approved manner with joints required. |
| 75 | Supplying and erecting current transformer coil with insulation |
| 76 | Supplying and erecting of digital voltmeter of all type starter |
| 77 | Supplying and erecting of digital ammeter of all type starter |
| 78 | Providing, erecting pressure gauge of hquied range complete with syphone tube, isolating vock suitable for 12 mm dia G.Z. pipe and oil changing of all |
| 79 | Rewinding and oil changing of all starter auto transformer |
| 80 | Supplying and electing Auto transformer of all starter. |
| 81 | Servicing & greasing of AB switch |
| 82 | Supplying and erecting 200 amp main switch |
| 83 | Supplying and erecting 250 amp main switch |
| 84 | Supplying and erecting 400 amp main switch |
| 85 | Fuse wire 100 amp 60 gauge |
| 86 | Supplying and erecting of backlight plate |
| 87 | Supplying and erecting base plate 200 amp |
| 88 | Supplying and erecting of contractor kit of all starter |
| 89 | Supplying and erecting of OCB |
| 90 | Supplying and erecting of OCB coil |
| 91 | Supplying and erecting of moving tip contact assembly |
| 92 | Supplying and erecting of moving tip contractor |
| 93 | Supplying and erecting of 200 amp IC cut –out witch |
| 94 | Supplying and erecting of transformer packing |
| 95 | Supplying and erecting of HT/LT stud |
| 96 | Supplying and erecting of air breather |
| 97 | Supplying and erecting bank of all polyproistence capacitors |
| 98 | Supplying, erecting and giving test and trail of 60 H.P. Stuffing box |
| 99 | Supplying, erecting and giving test and trail of 120 H.P. Stuffing box |
| 100 | Supplying, erecting and giving test and trail of 150 H.P. Stuffing box |
| 101 | Supplying, erecting and giving test and trail of 170 H.P. Stuffing box |
| 102 | Supplying, erecting and giving test and trail of 200 H.P. Stuffing box |
| 103 | Supplying, erecting and giving test and trail of 60 H.P. shaft |
| 104 | Supplying, erecting and giving test and trail of 120 H.P. shaft |
| 105 | Supplying, erecting and giving test and trail of 150 H.P. shaft |
| 106 | Supplying, erecting and giving test and trail of 170 H.P. shaft |
| 107 | Supplying, erecting and giving test and trail of 200 H.P. shaft |
| 108 | Supplying, erecting and giving test and trail of 60 H.P.connection plate |
| 109 | Supplying, erecting and giving test and trail of 120 H.P.connection plate |
| 110 | Supplying, erecting and giving test and trail of 150 H.P.connection plate |
| 111 | Supplying, erecting and giving test and trail of 170 H.P.connection plate |
| 112 | Supplying, erecting and giving test and trail of 200 H.P.connection plate |
| 113 | Supplying, erecting and giving test and trail of gland sleeve of all pump |
| 114 | Supplying, erecting alighnment and giving test and trail of Ampiler Sleeve 10 to 17 H.P. Submercible pump. |
| 115 | Supplying, erecting alighnment and giving test and trail of tyre coupling 60 H.P.pump |
| 116 | Supplying, erecting alighnment and giving test and trail of coupling 200 H.P.pump |
| 117 | Supplying, erecting alighnment and giving test and trail of coupling bush stud 200 H.P.pump |
| 118 | Spider Bush for 150 Hp Pump |
| 119 | Alighnment of pump motor of 200 HP |
| 120 | Supplying and erecting of lock of panel, starter etc |
| 121 | Oil paper |
| 122 | Dismantling of 10 H.P. Pump |
| 123 | Dismantling of 17.5 H.P. Pump |
| 124 | Dismantling of 60 H.P. Pump |
| 125 | Dismantling of 120 H.P. Pump |
| 126 | Dismantling of 150 H.P. Pump |
| 127 | Dismantling of 170 H.P. Pump |
| 128 | Dismantling of 200 H.P. Pump |
| 129 | Assembling with over oiling of 10 H.P.Pump |
| 130 | Assembling with over oiling of 17.5 H.P.Pump |
| 131 | Assembling with over oiling of 60 H.P.Pump |
| 132 | Assembling with over oiling of 120 H.P.Pump |
| 133 | Assembling with over oiling of 150 H.P.Pump |
| 134 | Assembling with over oiling of 170 H.P.Pump |
| 135 | Assembling with over oiling of 200 H.P.Pump |
| 136 | Pole clamp MS flat for pole or pipe with nut bolts |
| 137 | Nut Bolts TVS |
| 138 | Supply of 3307 A bearing for College Pump |
| 139 | Supply of 6307 2Z bearing for College Pump |
| 140 | Supply of NU 320 ECM C3 Filter Motor bearing 200 hp pump house Kherdi |
| 141 | Supply of 7322 BECBM Malewadi motor bearing 150 hp Pump |
| 142 | Supply of 6318 C3 bearing for filter 200 hp pump |
| 143 | Supply of 7320 BECBM bearing for 150 HP Gowalkot |
| 144 | Supply of NU 313 ECM bearing for Filter pump house |
| 145 | Supply of 6316 C3 bottam bearing Kherdi pump |
| 146 | Supply of 6318 C3 Bottam bearing Kherdi filter |
| 147 | Supply of 6308 2Z bearing for College Motor |
| 148 | Supply of 6309 2Z bottam Bearing Malewadi |
| 149 | Supply of 10 Hp submercible pump Thirst Bearing |
| 150 | Providing & erecting floor/wall mounting, MCCB panel board, with door, suitable for four pole incoming 400A, 2 ways four pole outgoing, up to 100 A MCCBs on iron frame, as per specification no. SW-SWR/MCCBPB. (Excluding MCCBs) PWD DSR (2022-23) 5-7-6 |
| 151 | Providing & erecting floor/wall mounted MCCB panel board, with door, suitable for four pole incoming 250A, 2 ways four pole outgoing, up to 100 A MCCBs on iron frame, as per specification no SW-SWR/MCCBPB. (Excluding MCCBs) PWD DSR (2022-23) 5-7-1 |
| 152 | Supplying and topping up filtered transformer oil of approved make with test certificate PWD DSR (2022-23) 5-7-2 |
| 153 | Filteration of Transformer oil on site till satisfactory test results PWD DSR (2022-23) 5-7-1 |
| 154 | 10 HP Submersible Pump 150 mm dia (with Bronze / Stainlesssteel(CF8M) Impeller) up to 12 stages MJP SSR 2023-24 PM 1-2-10 |
| 155 | Supplying & erecting four pole ON LOAD change over switch, 415V, 400A, open execution having staggered termination, phase barrier, shroud termination and terminal cover along with auxiliary contacts and ready to upgrade with fuseprotection kit, rotary handle, operational current category AC23A complying toIS/IEC 60947-3 Part-1/3. PWD DSR (2022-23) 5-1-8 |
| 156 | Supplying & erecting four pole ON LOAD change over switch, 415V, 200A, open execution having staggered termination, phase barrier, shroud termination and terminal cover along with auxiliary contacts and ready to upgrade with fuseprotection PWD DSR (2022-23) 5-1-6 |
| 157 | Supplying & erecting flat flexible 3 core 6 sq.mm PVC sheathed submersible type copper cable suitably clamped at fixed intervals with column pipe assembly complete. PWD DSR (2022-23) 12-4-10 |
| 158 | Providing earthing with copper earth plate size 60 x 60 x 0.315 cm with funnel with a wire mesh for watering and brick masonry block C.l. cover with minimum 25 kg Carbon based environment friendly back fill Ground Enhancing compoundcomplete with all materials, testing & recording the results as per specification no ESE -LA PWD DSR (2022-23) 9-1-6 |
| 159 | Supplying & recting submersible pump set suitable for erection on open well of 3.75 KW/5HP with 415V 50C/S AC supply, having delivery head from 36 to 18 m and discharge from 400 to 1000 litres per minute & pipe of suction 80mm/delivery 80 mm diameter erecting with necessary H type Clamps as per Specification no. WP-OSP MJP SSR 2023-24 1-1-5 |
| 160 | Supplying & erecting D.O.L Starter suitable for 415 V, 3 phase 50 cycles with no volt coil and overload element with necessary materials and connected to supply PWD DSR (2022-23) 2-4-3 Please Enable Macros to View BoQ information |