| 1 | Schedule-A |
| 2 | Excavation in trenches n.exc 1.5 Mtr wide and n,exc 1.5 Mtr in depth loose/soft and greating out for underground cable/erection of poles, stays etc complete all as specified and as directted by Engeer-in-Charge. |
| 3 | All as per Item No.1.01 but exceeding 1.5 mtr deep but not exc 3.0 mtr deep. |
| 4 | M&L for sand cushioning for cables with river washed sand and punning to provide required cover as per SSR part I complete all as specified and as directed by Engineer-in-Charge. |
| 5 | Supply and laying bricks common burnt clay sub classs 'B' old size for cable protection |
| 6 | Description all as per item Ser No 4 here in before but except bricksNote : Old unbreak bricks retrieved from item No 11 and 12 here in after shall be used. |
| 7 | Material & labour for cement concrete in foundations, filling and mass concrete PCC as foundation to poles, type D2, 1:4:8 using 40 mm graded stone agregate as foundations to poles all as specified. |
| 8 | Material & labour for Cement concrete, filling and mass concrete, PCC type C1, 1:3:6 using 20 mm graded aggregate all as specified. |
| 9 | Material & labour for cement concrete as coping to poles, PCC type B1, 1:2:4 using 20 mm graded stone agregate as foundations to poles all as specified. |
| 10 | Returning, filling in (Soil) including spreading, levelling, watering and well ramming in layers not exc 25CM thick layers complete all as specified and as directed by Engineer-in-Charge.. |
| 11 | Removal of excavated material n,exc 50 Mtr away and depositing depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed by Engineer-in-Charge |
| 12 | Disconnecting & taking out defective underground cable from trenches, pole, pipe, floor, will etc and locate the fault, rectify, the defect and relaying the XLPE cable underground PVC insulated and overall sheathed aluminium conductor heavy duty 1100 volts including and testing for any size complete as directed by Engr-in-charge (Excavation/earth work & sand cushioning, brick and joint shall be measured & paid for seprately). |
| 13 | Disconnecting & taking out defective underground cable any size and any type from trenches, pole, pipe, floor, watt etc. Please Enable Macros to View BoQ information |
| 14 | Disconnecting & taking out defective underground cable any size and any type from trenches, pole, pipe, floor, watt etc. Please Enable Macros to View BoQ information |