| 1 | Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptus or other approved timber\bamboo posts 1.4 m above G.L and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid seperately. |
| 2 | a) 75mm. dia bamboo railing & 125mm. Dia Jhau/Eucalyptus/otherapproved timber posts @ 1.60m apart |
| 3 | (ii) Railing with 3 rows |
| 4 | Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Char |
| 5 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. |
| 6 | (a) Depth of excavation not exceeding 1,500 mm. |
| 7 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring |
| 8 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] |
| 9 | Hire & labour charges for diesel generating set for lighting including fuel, 300M wire, 11 points with 200 Watt bulb with post for hanging & maintaining the same for day & night for the period. |
| 10 | Gas cutting of M.S. pipes and/or M.S. plates of different thickness all complete as per specification and direction of the Engineer-in- Charge. |
| 11 | Thickness in mm |
| 12 | 10mm thick plate |
| 13 | Supply of MS plate.(10mm Thick) |
| 14 | Field welding of M.S. plate by means of electric arc welding as per relevent IS specification using standard electrodes including edge preparation and charges of deployment of electric generator set with fuel, lubricant, and all other tools and plants all complete as per specification and direction of Engineer-in-Charge. [ Engineer-in-Charge shall approve the electrodes for arc welding before use ] |
| 15 | Throat thickness in mm |
| 16 | 5mm to 6mm |
| 17 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work. |
| 18 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin-Charge. (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside) |
| 19 | Added GST @ 18% |
| 20 | Added Cess @ 1% Please Enable Macros to View BoQ information |