| 1 | TOTAL AMOUNT |
| 2 | DISMANTLING COUNTER WEIGHT, LEVEL, ARM, HYDRAULIC UNIT ETC. AND ALL OTHER COMPONENTS OF THE HYDRAULIC SYSTEM ONE BY ONE OF THE FOLLOWING EXISTING PUMP DISCHARGE VALVES PARTS BY PARTS SEQUENTIALLY AND CAUTIOUSLY AS PER DIRECTION OF THE ENGINEER-IN-CHARGE(EIC) AT GRWW. B)750 MM DIA |
| 3 | DISMANTLING THE FILLOWING PDV/BFV FROM THE EXISTINGPIPE-BAY, INSTALLATION/FITTING-FIXING OF BARREL-PIECE/FLANGE AND LIFTING & KEEPING THE SAME ON THE WORKINGPLATFORM SEQUENTIALLY AND CAUTIOUSLY AS PERDIRECTION OF THE EIC AT GRWW. B)750 MM DIA |
| 4 | TRANSPORTATION CHARGES OF THE FOLLOWING PDV/BFVFROM GRWW TO WORKSHOP INCLUDING LOADING ANDUNLOADING. B)750 MM DIA |
| 5 | DISMANTLING ALL THE COMPONENTS OF THE FOLLOWINGPDV/BFV PARTS BY PARTS SEQUENTIALLY AND CAUTIOUSLY AS PER DIRECTION OF THE EIC AT GRWW/WORKSHOP. B)750MM DIA |
| 6 | SUPPLY, DELIVERY AND FITTING-FIXING OF THE FOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIA PDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLE AND DIRECTION OF THE EIC AT GRWW. A) DRIVE SHAFT. II) 750 MM DIA |
| 7 | SUPPLY, DELIVERY AND FITTING-FIXING OF THE FOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIA PDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLE AND DIRECTION OF THE EIC AT GRWW. B) NON-DRIVE SHAFT. II) 750 MM DIA |
| 8 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIAPDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW. C) VALVE SEAL. II) 750MM DIA |
| 9 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIAPDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW. D) SEAT RING (SS 410).II) 750 MM DIA |
| 10 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIAPDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW. E) SEAT RING (EPDMRUBBER). II) 750 MM DIA |
| 11 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIAPDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW. L) GLAND PLATE. II)750 MM DIA |
| 12 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIAPDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW. P) SHAFT KEY. II) 750MM DIA |
| 13 | RE-ASSEMBLING ALL THE COMPONENTS OF THE FOLLOWING PDV/BFV PARTS BY PARTS SEQUENTIALLY AND CAUTIOUSLY AS PER DIRECTION OF THE EIC AT GRWW. B) 750 MM DIA |
| 14 | PERFORMING OF NECESSARY HYDRO-TESTING OF THEDISC AND BODY OF THE FOLLOWING PDV/BFV AS PERDIRECTION OF EIC AT GRWW. B) 750 MM DIA. |
| 15 | LOWERING FROM THE WORKING-BAY, INSTALLATION,FITTING-FIXING OF THE FOLLOWING PDV/BFV IN THE EXISTINGPIPE-BAY REMOVING THE EXISTING BARREL-PIECE/FLANGESAS PER DIRECTION OF THE EIC AT GRWW. B) 750 MM DIA. |
| 16 | TEST RUN,OPERATION AND COMMISSIONING OF THEENTIRE SYSTEM OF THE FOLLOWING PDV/BFV AS PERDIRECTION OF THE EIC AT GRWW. B) 750 MM DIA |
| 17 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIA.PDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW. Q) HYDRAULIC CYLINDER, II) 750 MM DIA |
| 18 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIA.PDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW.F) STUB BEARING BUSH, II) 750 MM DIA |
| 19 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIA.PDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW.G) DRIVE BEARING BUSH, II) 750 MM DIA |
| 20 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIA.PDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW.I) CLAMPING RING, II) 750 MM DIA |
| 21 | SUPPLY, DELIVERY AND FITTING-FIXING OF THEFOLLOWING SPARES PARTS OF 700 MM AND 750 MM DIA.PDV/BFV SEQUENTIALLY AND CAUTIOUSLY AS PER SAMPLEAND DIRECTION OF THE EIC AT GRWW.J) O RING, II) 750 MM DIA Please Enable Macros to View BoQ information |