|
| 1 | DOUBLE WALLED CORRUGATED (DWC) HDPE PIPES:Supply and erection of Double Walled Corrugated(DWC) HDPE pipe to be laid 1mtr. below ground levelincluding excavation placing the pipe in position and backfilling with excavated soil etc. of the required size:- Double Walled Corrugated HDPE Pipe 50/ 38mm (Outer/ Inner dia.) |
| 2 | XLPE INSULATED LT CABLES: XLPE INSULATED UN-ARMOURED CABLES (LOOSE): Supply, laying and erection ofaluminium conductor XLPE insulated PVC sheathedUn-armoured and served cable 1100 volts grade as perIS 7098 (Part-1)1988 to be laid loose in the existingtrench or pipe as per PWD General Specifications: Overall size 10sq.mm (3Core) Un-armoured (Loose) |
| 3 | PVC INSULATED FR COPPER CONDUCTOR CABLES:Supply and erection of PVC insulated FR single coreUnsheathed copper conductor cable (ISI marked) suitableupto 1100 volts grade confirm to IS:694/1990 left bare inpipe or casing of suitable size complete in all respect asdesired by the Engineer-in-charge:- Overall size 1.5sq.mm (Un-sheathed) |
| 4 | 3-STEPPED STEEL TUBULAR POLE: Supply and erection of 3-Stepped steel tubularswaged and welded pole (410-SP-Mpa) of suitablelength confirming to IS: 2713- (PART-II)-1980 (Steeltubes confirming to IS: 1161-1979, UTS 42 kgf/Sq.mm) to fix up to a required planting depth below groundlevel in a hole of excavation about 45 cm dia. and suitabledepth to fill up to 15 cm below G/L with 1:2:4 cementconcrete mixture including painting of pole with two coatsof approved aluminium paint as required:- Overall length 8 metre, length of sections 4.5 metre,1.75 metre and 1.75 metre (Bottom, Middle and Toprespectively), Outer dia and thickness of sections139.7mm x 4.5mm, 114.3mm x 3.65mm and 88.9mm x3.25mm (Bottom, Middle and Top respectively) withapproximate weight 101 kg. (410 SP-13) base Plate weight7.5 kg. of size 12mm thick about 30 cm dia |
| 5 | LAYING OF UNDER GROUND CABLES,DISMANTALLING & ERECTION OF POLES AND CEMENT CONCRETE MUFFS Making of Cement Concrete muff of suitable sizeand length with 1:2:4 cement concrete mixture. The muff isto be made around the steel tubular pole sufficient tocompletely flush a SMC Junction Box (Glass Fibrereinforced polyester sheet moulding compound)confirming to IS:14772, inner dimensions 250mm x 200mmx 100mm with ± 10% tolerance in size & hinged water tight cover with locking arrangement having 1No. terminal strip with 4Nos.terminals & 1No. Single pole MCB of required capacity fixedon din bar (Din Bar Provision for 2Nos. MCBs). The SMCJunction Box is to be fixed with the pole by a MS flatclamp of size 20mm x 2mm thick. PVC pipe 40mm dia.(2No.x0.60m) should be provided for incoming andoutgoing cables. The outer surface of the muff shall befinished with pure cement & two coats of white snowcemcomplete in all respect as approved and desired by theEngineer In-Charge at site: Cement Concrete Muff of Overall Size 450mm dia.,80cm Long with making an extra collar (If pole installed inCentre verge/ Footpath) will be provided with 1:2:4cement Sand & concrete mixture around the Steeltubular pole. The size of collar (height is 40cm & dia. is 45cmincluding pole dia i.e. 168.3mm) |
| 6 | GI PIPE POLES & BRACKETS:SINGLE/ DOUBLE/ TRIPLE/ FOUR/ SIX ARMS BRACKET FOR STEEL TUBULAR POLE: Supply and erection of G.I. Pipe 50mm dia. (Medium)Single/ Double/ Triple arm bracket of suitable lengthwelded with MS canopy 80mm inner dia., outer dia 89.5mm(Medium), 450mm long suitable for 3 stepped steeltubular swaged and welded pole with top outer sectiondia. 76.1mm. The MS canopy should have 3no. holes forfixing the bracket at the top end of the pole with the helpof 3Nos. ½\\" x 1½\\" size nut bolt fully threaded. The bracket should have MS sheet (1.62mm thick) ring of89.5mm dia. for covering the top end of the canopy. The MScanopy and GI bracket should be welded at tentative angle105º (105 degree) inclination with MS sheet 5mm thicktriangular in shape having dimensions 225/300/375mmx 150mm x 5mm thick (225mm for 1.5m, 300mm for2m & 375mm for 2.5m long bracket) with two coats of anapproved aluminium paint as desired by Engineer-in-charge at site: Double Arm Bracket 1.5 metre Long for Steel TubularPole (7 to 8m) |
| 7 | GALVANIZED IRON PIPES AND G.I. EARTHINGSupply & erection of G.I. pipe (A-Class) as per IS:1239(Part-I) 2004 including sockets, bends, inspectionboxes, Steel hooks, GI saddle clamps and other pettymaterials etc., where necessary including paintingas per PWD General Specifications:- Earthing earth rod 20mm dia for providing earth connections upto line earthwith G.I. Wire 8 S.W.G. (4mm dia.). The rod shall be taperedat one end and flatted on other end. The hole size10mm dia shall be drilled on the flatened side forfacilitating connection withG.I. wire and thimble etc. Therod shall be erected in ground upto complete lengthvertically:- GI Earth rod 20 mm dia., 3 mtr. Long |
| 8 | Supply and Erection of LED Street Light 70 watt (includingLED driver) with pressure die cast aluminium housing withcontrol gear ( with IP 65/ IP 66 protection), CRI Minimum70, CCT >5700K, toughened glass fitting, LED fixture glass fitting, LED fixtureminimum 120 lumens per watt and operating voltagebetween 140 to 270 volt, THD <10% ingress protection (as per BIS standards) , surgeprotection 10kv and above (as per (IS/IEC standards)wattage of each LED High power LED of 1 watt to 5 watt with mandatory modularlenses, input AC frequency 50 Hz ± 3 % 5 year warrantyincluding their drivers complete along with erectionof the same with connections, testing etc. complete in allrespects as approved and desired by theEngineer-in-charge at site.LED Fitting as per Specifications approved by Hon. Tech.Advisor to CM Punjab vide Letter no AT-2021/GL1410-1422 Dated 06/05/2021. Dated06/05/2021. Besides this the lighting fixture manufacturesshould have in house NABL accredited labortary. Make Asdesired by Engineer in charge. Please Enable Macros to View BoQ information |