| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size |
| 3 | Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level andcuring complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 7 | Hand packing of stone behind retaining wall excl. Cost of stone. |
| 8 | Carriage of stone aggregate below 40mm at an average distance of 35.00Km by MT |
| 9 | Carriage of stone aggregate above 40mm at an average distance of 35.00Km by MT |
| 10 | Carriage of stone from an average distance of 5.00Km by MT |
| 11 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for Walls any thickness incl attached plaster , buttress , plinth and stair course etc |
| 13 | Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 14 | Providing and laying non-pressure of specified class R.C.C. pipesincluding collars/spigot jointed with stiff mixture of cement mortar in theproportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete. 900 mm dia. R.C.C. Pipe |
| 15 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete. |
| 16 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 17 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 18 | Providing & making Gabion structure with Mechanically Woven DoubleTwisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter3.0mm, mechanically edged/selvedged with partitions at every 1m intervaland shall have minimum 10 numbers of openings per meter of meshperpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied@ 3% by weight of Gabion boxes, filled with boulders with leastdimension of 200 mm, as per drawing, all complete as per direction ofEngineer-in-charge Please Enable Macros to View BoQ information |