| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge in AKS = 70% |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge in OR = 20% |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge in HR = 10% |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form fordges of slabs and breaks in floors and walls Above 20 cm wide |
| 12 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete. 50 mm thick with 20mm nominal size stone aggregate. |
| 13 | Hand packing stone filling in horizontal level incl. Supply of stone |
| 14 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone |
| 15 | Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level andcuring complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 16 | Carriage of stone from an average distance of 5Km by MT |
| 17 | Carriage of stone aggregate below 40mm from an average distance of 6Km by MT |
| 18 | Carriage of stone aggregate above 40mm from an average distance of 6Km by MT |
| 19 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:in AKS |
| 20 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 21 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete Please Enable Macros to View BoQ information |