| 1 | Cleaning Jungles including uprooting of trunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 meters out side the periphery of area cleared as per s.i.no.259 |
| 2 | Excavation in foundation in ordinary soil (Loam, Clay or sand) including lift up to 1.50m and lead up to 30 as per as per s.i.no.251 |
| 3 | Providing and laying cement concrete in 1:4:8 (1cement , 4C/sand 8 s/ballast in 40mm) and curing complete i/c cost of form work in foundation and floor as per PWD s.i.no.275a ch-5 |
| 4 | Brick work with common burnt clay FPS non modular brick of class designation-100 in foundation and plinth in 1:4 cement, c/sand Sor 6.1.1 |
| 5 | Providing and laying in position specified grade of reinforcement cement concrete including the cost of centering shuttering finishing and excluding reinforcement including supply pf all materials ,labours and T&Petc required for proper completion of the work 1:1.5:3 (1 Cement : 1.5 Coarse sand: 3 Graded stone aggregate 20 mm nominal size) .(SOR -5.1.2a) |
| 6 | Brick work with common burnt clay FPS non modular brick of class designation-100 in superstructure above plinth level in 1:4 cement, c/sand Sor 6.4.1 |
| 7 | RCC work in beam , lintels, suspended floors, roofs, having balconies, shelves, chajjas, bands, staircases, above plinth level upto floor five level, i/c the cost of centering, shuttering, finishing and excluding reinforcement -1:1.5:3 cement, coarse sand and stone aggregate 20 mm nominal size i/c all as per dsr no.5.3 sr 8 ch- 05 |
| 8 | Steel reinforcement for RCC work i/c straightening, cutting, bending all complete as DSR no.-5.22.6 CH-10 |
| 9 | 12 mm cement plaster on brick work with cement mortar 1:4 (1cement:4 coarse ) (SOR 13.4.1) |
| 10 | Wall painting (Two coat) with plastic emulsion paint of approved brand and manufacture on decorative wall surface to give an even shade including thoroughly brushing the surface clean all of dirt, grease loose pieces and prepare smooth surface including cost of all material, Labour, T&P etc. complete required for proper completion of the work. as per PWD SI no.17 new |
| 11 | Steel wok in built up tubular (round,square or rectangular hollow tubes etc.) truses etc. including cutting. Hoisting fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. (Hot finised welded type tubes. as DSR no. 10.16.1 |
| 12 | Painting on Steel/G.S. sheet with synthetic enamel paint .as DSR no. 13.53.1 |
| 13 | Providing and fixing GI barbed Wire (Hot Dip)fencing in three rows including fixing it to postafter stretching it including labour and toolsand plants etc. required for proper completionof the work also including supply of wires(14×14 SWG) with 100mm Barb Spacing (@11.66 Kg /100 mtr.) and excluding supply ofposts.as DSR no. 13.53.1 |
| 14 | P/F signboard of black granite plate in Brick masonary in Cement mortar i/c all complete Please Enable Macros to View BoQ information |