| 1 | PART A- Manufacture,Supply of MS pipe line of 300mm dia 10 mm thickness of required lengths conforming IS3589 and IS1239 to site of work, including transportation loading, unloading, stacking at a place shown by (painting with two coating red oxide (Anti corrosive) paint etc as required as on directed the Engineer-in-charge complete. All labour and materials. 300mm dia pipe for Delivery pipe line from MPH to Orrissa Weigh Bridge for Incoming water to S4 PH. |
| 2 | 300mm Dia For Delivery Pipe line From S4 Pump House to Left & Right Branches. |
| 3 | 200mm Dia For Delivery Pipe line to Branches. |
| 4 | Cost of MS Flanges including cost of Bolts, Nuts, Rubber Packing etc., complete and flange thickness confirming to IS:7322 - 1985 and flange dimensions confirming to IS:1538-1993 excluding Cost of MS barrel including cost and conveyance to site, excluding Taxes etc., complete. (Rate per each Flange). 300mm dia.M.S.Flange with Bolt, Nut, Washers and Rubber insertion |
| 5 | 200mm dia.M.S.Flange with Bolt, Nut, Washers and Rubber insertion, |
| 6 | 80mm dia.M.S.Flange with Bolt, Nut, Washers and Rubber insertion |
| 7 | Providing Apoxy resin based enamel zinc chromate primary coat (Two coats) over a MS Pipes both inside and outside which includes self-priming coat (diluted with chemical upto 30%), first coat of Zinc chromate primary coat and second coat of Apoxy resin based with a time interval of 6 to 8 hrs for two coats at 60° c of having density upto 1.26±0.02 gm/cm³ , ph value 8 - 9.5 ,specific gravity 1.1 and recomended DFT of 60 to 80 microns with contract ratio of 96% and including cost and conveyance of all materials and labour charges as per SS and as directed by the department officers. 300 mm dia for delivery pipe line from MPH to Orrissa Weigh Bridge for incoming water to S4 Pump house. |
| 8 | 300 mm dia for delivery pipe line from S4 pump house to left & right |
| 9 | 200 mm delivery pipe to Branches |
| 10 | 80 mm for 29 Branches(1X6 Mtrs Long) |
| 11 | Supply of Shovel 0.85 cum 110 hp / Hydraulic Excavator Earth mover for excavation / levelling and removing debris / earth etc., including fuel, operator charges and incidental charges etc., as directed by the Engineer-in-Charge. All Labour and equipment, spares etc., complete. (Payment will be made for number of hours worked at site only) For Jungle clearance |
| 12 | For removing of heeps |
| 13 | Earthwork in excavation by Manual means for pipelines as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH 300mm dia pipe for Delivery pipe line from MPH to Orrissa Weigh Bridge for Incoming water to S4 PH |
| 14 | 300mm dia 10mm thick pipe for Delivery pipe line from S4 Pump House to Left & Right Branches |
| 15 | 200mm dia 10mm thick pipe for Delivery pipe line to Branches |
| 16 | Bailing out water from foundations/pipe line trenches with oil engine driven pump sets including hire charges, fuel charges and wages for the driver and helper. For Pipe lines & foundations 5HP pump 8hrs.per day for each sprinkler (6 Pumps for 60 days) |
| 17 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviciable material with all liftts and lead of 1000M as per Technical Specification clause MORTH. (RBR-STCL-5-B) (Mechanical) 300mm dia pipe for Delivery pipe line from MPH to Orrissa Weigh Bridge for Incoming water to S4 PH |
| 18 | 300mm dia 10mm thick pipe for Delivery pipe line from S4 Pump House to Left & Right Branches |
| 19 | for 200mm dia 10mm thick pipe for Delivery pipe line to Branches |
| 20 | Supplying and filling in plinth with crusher dust under floors including watering, ramming, consolidating and dressing etc., as required and as directed by the Engineer-in-charge complete. All labour and materials. A) Restoration of Roads |
| 21 | Railway crossing/Road crossing/Canal crossing by adopting trenchless technology tunneling work through specialized pipe jacking method by erecting the equipment to true to the alignment and gradient, by hydraulic pipe jacking technique complete including tunneling, excavation in all types of soils including hard rock and construction of RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other required materials but excluding cost of encasing pipe, in co-ordination with the concerned authorities as per approved drawings and directed by the Engineer-in –Charge. (800 MM Dia) a) Railway crossing |
| 22 | Laying P.C.C (1:4:8) using 40 mm H.B.G Metal with Concrete Mixture including cost & conveyance of all Material, Labour charges, centering, Machinery, laying in position, vibration, curing for 7 days and all incidental charges etc., complete - 1 Cum. (BLD-CSTN-2.5) a) Railway crossing |
| 23 | b) Thrust Blocks |
| 24 | Supplying, stacking and spreading 12.5 mm and 6 mm granite metal in 60:40 ratio to the required lines and levels for bedding PCC blocks as directed by the Engineer-in-charge. All labour and materials complete. a) Railway crossing |
| 25 | b) Thrust Blocks |
| 26 | Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating, curing etc M20 design mix unit 1.00cum a) 300mm & 200mm main line Support Bends |
| 27 | b) Restoration of Roads |
| 28 | c) Pedestals of pipeline From S4 Pump House to Left & Right Branches. |
| 29 | Pedestals of pipeline For Delivery Pipe line to Branches |
| 30 | Pedestals of pipeline for Delivery pipe line from MPH to Orrissa Weigh Bridge for Incoming water to S4 PH |
| 31 | Supply and delivery of \\"Resilient Seated Soft Sealing\\" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties loading ,unloading complete all taxes and transportation, etc. complete.300mm dia PN1.6(Mpa) a) 300 mm dia |
| 32 | b) 200 mm dia |
| 33 | c) 80 mm dia |
| 34 | Supply & Delivery of Tamper Proof DI Flanged Single Chamber Air Release Valves with body & cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005. All internal parts such as Float, shell, Cove Bolts etc. made of Austenitic alloy steel of SS AISI 304/316 and DN 50 float of and other components with ABS/PTFE/EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination Flange drilling as per IS - 1538 and exclusive of all taxes and transportation. duties all taxes complete.50mm dia a) 80 mm dia air relief valves providing at 500 Mt. intervals |
| 35 | Supply of Man Mazdoor / Women Mazdoor / Watchmen, Gangmen / Mazdoor (unskilled) to work in any site conditions etc., as required and as directed by the EIC complete. All labour and materials. LAB-00120 a) For miscellaneous works coming in the alignment of pipeline |
| 36 | Supply of First class Artisans such as Carpenter/Mason/Painter/Fitter/Welder etc., as required and as directed by the EIC complete. All labour and materials. LAB-00036 a) For miscellaneous works coming in the alignment of pipeline |
| 37 | PART A- Self Dynamic Hydro Control Valves & Accessories. Design,Supply,installation,testing and comissioning of Electrically opearted of 200 mm dia Self Dynamic Hydro control valve along with all accessories like Dirt Box, Expansions Bellows, required MS specials and matching flanges etc., complete to finish the job for pump control purpose as per BOQ and tecnical specifications (as per Annexure-A) |
| 38 | Design,Supply,installation ,testing and comissioning of Electrically opearted 150mm dia Self Dynamic Hydro control valve along with all accessories like Dirt box, Expansions Bellows ,required MS specials and matching flanges etc., complete to finish the job for ON/OFF control purpose of branch valves (as per Annexure-A) |
| 39 | PART-B- Instrumentation Design,Supply, Installation and testing of Instrumantation at S-4 pump house location& for sprinkler managemment i.e 1) Pressure transmitters2) Flow meters3) Ultra sonic Level Sensors 4) Control Valve for isolation(as per Annexure-B) |
| 40 | PART-C- PLC, SCADA& RTU Design,Supply,installation, programming, customization, testing and commissioning of PLC and SCADA control panel for entire pumping station, remote management for branch valves to sprinklers, synchornization with Central SCADA to operate and monitor from single desk at S-4 Pump House which consist of a) PLC - CPU.b) ANALOG INPUT & Out put Module.C) DI/DQ Module.d) PROFINET SWITCH.e) Communiucation Module.F) SMPS.G) Push buttons & Indication lamps.H) SP & DP MCB.i) Relays for entire logic operation.J) PC SERVER with licenced softwares.K) Internal & external power and communication wirings. (as per Annexure-C) |
| 41 | Design, Supply, installation, configuration of RTU control Panels at each branch valve which consists of of a) PLC with I/O modules / Controllerb) GSM/GPRS Modem c) Relay Cards d) Solar Charge controller with connected accessories e) Solar Panel with mounting accessories f) Power back up with connected accessories g) Push buttons MCBs, i) Internal and External power, netwrok cabling from Valve to RTU and solar etc..(as per the BOQ at Annexure-C) |
| 42 | PART-D - Power Supply (as per Annexure-D) a) Supply, & Installation, Testing & Commissining of vertiv libert power bank 6KVA UPS with inbuilt isolation transformer including rack and connections. |
| 43 | b) Supply & Installation, Testing & Commissioning of 12 V 65AH SMF batteries make: Exide / Amar raja. |
| 44 | c) 4 core, 6 Sq.mm power cable |
| 45 | d) Supply 24 core SMF armored fiber cable as per Technical specifications. |
| 46 | e) Suply of 40 mm HDPE Duct Make: Tulasi / Godavari (as per Annexure-D) |
| 47 | PART-E - SCADA based PCC Panels: Fabrication, supply,fixing, errection, termination, testing and commissioning of SCADA based indoor type, dust and weather proof PCC with MPCC panels for all pump sets at S-4 pump house which consist of:a) 400 A MCCB-55 KA - 4 Pole MPR for I/C Feeder.B) 100A MCCB 36 Ka 4P TR for O/G feeder to Lighting & Spare.C) 63 A MCCB 36KA 3P TR for O/G feeder to Tanker filling point and Dewatering pump feeder.d) 3.75 KW DOL starter with MPCB for Tanker filling point and Dewatering pump feeder.e) 132 KW- HD VFD with Isolation contactor, TPN SFU with Semi conductor fuses and required safety accessories.f) Multi function metering set.(as per Annexure-E.) |
| 48 | PART-F - HSC Pump Sets wIth Energy efficient and VFD control Motors: Dismantling, supply and erection of 2 Nos of 132 KW capacity Energy efficient HSC pump set (1 W + 1 SB) with specifications of Head range of 115 mtrs, discharge of 240 M3/Hr, Speed 1500 (syn) RPM, Minimum efficiency should not less than 70%, including common base frame, coupling, coupling guard and erection with necessary connected pipe lines, specials ,fabrication and civil works etc., complete. (as per Annexure-F.) |
| 49 | Supply and delivery of 5 HP Monobloc pump sets with Suction and delivery pipe lines with necessry GI pipes and specials for tanker filling station and connected civil works etc., complete charges including cost and convayance of all the material, labor etc., complete and excluding cost of taxes and duties.(as per Annexure-F.) |
| 50 | Supply and delivery of 3 HP Monobloc pump sets with Suction and delivery pipe lines with necessry GI pipes and specials for De watering pumping station and connected civil works etc., complete charges including cost and convayance of all the material, labor etc., complete and excluding cost of taxes and duties (as per Annexure-F.) |
| 51 | PART-G - BUILDING MAINTAINANCE WORKS : Construction of required Civil chambers with top covers for Branch valves as per site condition |
| 52 | Dismantling and Construction of required plinghts, dismantling portions with brick works, Raising of entire pump house floorings up to 2 feet, plastering, Laying of floorings with in pump house and dismantled portions with M 20 Concrete and finished with Tiles flooring etc., complete |
| 53 | Providing aluminum partition, fal ceeling and entrance doors with UPVC at all Power control panels area to keep dust free and controlled weather temperature |
| 54 | Electrification and illumination of internal & external of the pumping ststion with suitable number of wiring points, power points and light fixtures etc., complete |
| 55 | Painting for Internal & External walls for entire pumping ststion, suction sumps and compound walls and iron works with suitable paints. |
| 56 | Providing 2 nos of 2 ton capacity Split air conditioners for Power and SCADA control area in pump house will all necessary works. |
| 57 | Providing sign board to indicate the Branch Nos, SOP, Pump and instrument identifications and tiltle for Pumping station |
| 58 | Any other item required, but not specifically mentioned in the BoQ for successful completion of the project. Please Enable Macros to View BoQ information |