| 1 | SUPPLY OF FOLLOWING NON CENTRALISED MATERIAL |
| 2 | E Clamp for 11 KV |
| 3 | Cable Holding clamp |
| 4 | Top Channel clamp for SP-55 |
| 5 | Earth wire clamp with N&B |
| 6 | LT Shackle insulator Clamp |
| 7 | Stay Clamp for SP-55 With Nut & Bolt |
| 8 | HT Stay Insulator |
| 9 | Shackle Insulator 100×115 mm with N&B |
| 10 | Dist. Box With N&B ABC Cable 3PH-4 Way |
| 11 | Piercing connector for 95 sqmm 70 sqmm |
| 12 | 11 KV Fuse Set |
| 13 | Aluminium Lug Different Size |
| 14 | LABOUR CHARGE |
| 15 | Erection of Earthing Rod |
| 16 | Fabrication of Steel |
| 17 | Excavation of Pit for Stay Set |
| 18 | Erection of 11 KV Stay Set |
| 19 | Grouting of Stay Set |
| 20 | Excavation of Pit for Pole |
| 21 | Erection of Single SP-55 Pole |
| 22 | Erection of SP-55 Double Pole |
| 23 | Grouting of Pole |
| 24 | Dismantling of SP-21/SP-23 Single Pole |
| 25 | Inst. of 100 KVA DTR on Pole Structure |
| 26 | Fixing of Fuse Set |
| 27 | Fixing of Lightning Arrestor |
| 28 | Laying of Rabbit Conductor in HT Line |
| 29 | Cartage SP-55 Pole, 101-150 KM |
| 30 | Cartage of Petty Material, 151-200 KM |
| 31 | Cartage of 100 KVA DTR, 101-150 KM |
| 32 | Installation of LT Dist Box (1P & 3P) |
| 33 | Dismantling of LT XLPE ABC 3×95+1×70 Sq.mm |
| 34 | Provide and Laying Cement Concrete Wall |
| 35 | Fixing of 11 KV Pin Insulator |
| 36 | Disconn & Reconn. of Service Conn. 1Ph |
| 37 | Supply & Fixing of 11KV J/KIT 3×70 O/D |
| 38 | Laying of 11 KV Cable |
| 39 | Laying of LT XLPE ABC 3×95+1×70+16 Sq.mm |
| 40 | Back Carriage of Scrap Material Please Enable Macros to View BoQ information |