| 1 | SCOPE OF WORK -SR-26 HULL WORK PACKAGE(FRP B)001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway). | SCOPE OF WORK -SR-26 HULL WORK PACKAGE(FRP B)001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway). |
| 2 | 002 Hull Cleaning Under Water area including Boot Top Area, Superstructure and above water area (a) HP jet clean entire U/W area, boot top area and above water area and remove the marine growth/barnacles/salt and contaminants from surface and present for survey. | 002 Hull Cleaning Under Water area including Boot Top Area, Superstructure and above water area (a) HP jet clean entire U/W area, boot top area and above water area and remove the marine growth/barnacles/salt and contaminants from surface and present for survey. |
| 3 | 003 Hull survey (a) Visual/Tapping test Hull Survey Visual/Tapping test Hull survey of entire U/W hull including boot top area, above water area, weather deck, internal tank including bulkheads to be carried out in accordance with NO 20/16Note: firm to submit 04 copies of Hull survey report | 003 Hull survey (a) Visual/Tapping test Hull Survey Visual/Tapping test Hull survey of entire U/W hull including boot top area, above water area, weather deck, internal tank including bulkheads to be carried out in accordance with NO 20/16Note: firm to submit 04 copies of Hull survey report |
| 4 | 003 Hull survey (b) Ultrasonic Inspection All areas found defective during visual/ tapping test survey to be inspected using Ultrasonic Inspection method for further assessing of depth and extent of damage (iaw NO 20/16)Note: firm to submit 04 copies of Hull survey report | 003 Hull survey (b) Ultrasonic Inspection All areas found defective during visual/ tapping test survey to be inspected using Ultrasonic Inspection method for further assessing of depth and extent of damage (iaw NO 20/16)Note: firm to submit 04 copies of Hull survey report |
| 5 | 004 Hull Repairs. (a) All areas found defetive during hull survey are to be repaired/ renewed as indicated by survey report. [Quote for repair/ Renewal of FRP at various locations of hull, above water, upper decks, super structure and internal spaces / tanks.]Max Thickness of hull - 30-50 mm Note: Firms are requested to quote material for FRP laminations including mats,resin, stegthing frames and sheets etc. | 004 Hull Repairs. (a) All areas found defetive during hull survey are to be repaired/ renewed as indicated by survey report. [Quote for repair/ Renewal of FRP at various locations of hull, above water, upper decks, super structure and internal spaces / tanks.]Max Thickness of hull - 30-50 mm Note: Firms are requested to quote material for FRP laminations including mats,resin, stegthing frames and sheets etc. |
| 6 | 005Surface PreparationU/W Hull including boot top areaSurface preparation to be carried out (iaw NO 20/16) using Wooden scraper and sanding machine for removal of paint. | 005Surface PreparationU/W Hull including boot top areaSurface preparation to be carried out (iaw NO 20/16) using Wooden scraper and sanding machine for removal of paint. |
| 7 | 006PaintingU/W Hull including Boot top areaPaint under water area including boot top area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(a) 1st Coat : Penguard Primer - 50 microns | 006PaintingU/W Hull including Boot top areaPaint under water area including boot top area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(a) 1st Coat : Penguard Primer - 50 microns |
| 8 | 006PaintingU/W Hull including Boot top areaPaint under water area with following paint scheme as per OEM recommendationsand NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(b) 2nd Coat : Tie Coat safe guard universal ES (Grey) -75 microns | 006PaintingU/W Hull including Boot top areaPaint under water area with following paint scheme as per OEM recommendationsand NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(b) 2nd Coat : Tie Coat safe guard universal ES (Grey) -75 microns |
| 9 | 006PaintingU/W Hull including Boot top areaPaint under water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(c) 3rd Coat : Sea Quantum U (Dark brown) 150 microns | 006PaintingU/W Hull including Boot top areaPaint under water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(c) 3rd Coat : Sea Quantum U (Dark brown) 150 microns |
| 10 | 006PaintingUnder Water area including Boot top areaPaint under water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(d) 4th Coat : Sea Quantum U (Dark Red) 150 microns | 006PaintingUnder Water area including Boot top areaPaint under water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(d) 4th Coat : Sea Quantum U (Dark Red) 150 microns |
| 11 | 006PaintingUnder Water area including Boot top areaPaint under water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(e) 5th Coat (Boot Top) :Seaquantum Ultra(Black)-1x150 microns DFT. | 006PaintingUnder Water area including Boot top areaPaint under water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also.(e) 5th Coat (Boot Top) :Seaquantum Ultra(Black)-1x150 microns DFT. |
| 12 | 07Draught Marks Draught marks, both Roman and Numeric, corroded/eaten away. To be renewed and painted. | 07Draught Marks Draught marks, both Roman and Numeric, corroded/eaten away. To be renewed and painted. |
| 13 | 08 Surface PreparationWeather Deck Surface preparation to be carried out in occordance with NO 20/16 by Wooden scraper and sanding machine for removal of paint. (light discking by manual methods) | 08 Surface PreparationWeather Deck Surface preparation to be carried out in occordance with NO 20/16 by Wooden scraper and sanding machine for removal of paint. (light discking by manual methods) |
| 14 | 09Painting - JOTUN Scheme. Weather deckPaint above water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard Primer -50 microns Dft | 09Painting - JOTUN Scheme. Weather deckPaint above water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard Primer -50 microns Dft |
| 15 | 09 Painting - JOTUN Scheme. Weather deck Paint above water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Non slip epoxy D.A. grey HDNS - 250 microns Dft | 09 Painting - JOTUN Scheme. Weather deck Paint above water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Non slip epoxy D.A. grey HDNS - 250 microns Dft |
| 16 | 010 Surface Preparation Above Water Area Super Structure including Deck Fittings Surface preparation to be carried out in occordance with NO 20/16 by Wooden scraper and sanding machine for removal of paint. (light discking by manual methods) | 010 Surface Preparation Above Water Area Super Structure including Deck Fittings Surface preparation to be carried out in occordance with NO 20/16 by Wooden scraper and sanding machine for removal of paint. (light discking by manual methods) |
| 17 | 011 Painting - JOTUN Scheme Above Water Area Super Structure including Deck Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1St Coat -Penguard Primer 150 microns | 011 Painting - JOTUN Scheme Above Water Area Super Structure including Deck Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1St Coat -Penguard Primer 150 microns |
| 18 | 011 Painting - JOTUN Scheme Above Water Area Super Structure including Deck Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat -Penguard HB 150 microns | 011 Painting - JOTUN Scheme Above Water Area Super Structure including Deck Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat -Penguard HB 150 microns |
| 19 | 011 Painting - JOTUN Scheme Above Water Area Super Structure including Deck Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 3rd Coat - Hard top XP (Grey-RAL 7040) | 011 Painting - JOTUN Scheme Above Water Area Super Structure including Deck Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 3rd Coat - Hard top XP (Grey-RAL 7040) |
| 20 | 012 Guard Rails and stanchions(a) Alluminium fixed guard rails damaged/bent/broken, to be renewed including relamination of foundation. Mat- AlNote: Only damaged guardrails to be renewed. Each guardrail consist of 05 Alluminium plate (Length 90cm, Breadth 10cm, Thichness 0.8cm). | 012 Guard Rails and stanchions(a) Alluminium fixed guard rails damaged/bent/broken, to be renewed including relamination of foundation. Mat- AlNote: Only damaged guardrails to be renewed. Each guardrail consist of 05 Alluminium plate (Length 90cm, Breadth 10cm, Thichness 0.8cm). |
| 21 | 012 Guard Rails and stanchions(b) All Nut bolts used for securing of guard rail stanchions are to be renewed. | 012 Guard Rails and stanchions(b) All Nut bolts used for securing of guard rail stanchions are to be renewed. |
| 22 | 013 Tank/Vent Pipevent pipe damaged/broken, to be renewed. GRP foundation of vent pipe to be relaminated. | 013 Tank/Vent Pipevent pipe damaged/broken, to be renewed. GRP foundation of vent pipe to be relaminated. |
| 23 | 014BollardsGRP coating on bololard foundation uprooted. GRP coating to be relaminated. | 014BollardsGRP coating on bololard foundation uprooted. GRP coating to be relaminated. |
| 24 | 015CleatsCleats on weather deck broken/damaged. Cleats to be renewed and GRP foundation to be relaminated. Mat-MS | 015CleatsCleats on weather deck broken/damaged. Cleats to be renewed and GRP foundation to be relaminated. Mat-MS |
| 25 | 016Rubber Fenders(a) Cylindrical Rubber fenders damaged to be renewed (As per sample)Specification- EPDM rubber as per NES 170. Length of each fender 3 Mtr, OD-180 mm | 016Rubber Fenders(a) Cylindrical Rubber fenders damaged to be renewed (As per sample)Specification- EPDM rubber as per NES 170. Length of each fender 3 Mtr, OD-180 mm |
| 26 | 016Rubber Fenders(b) Rubber fenders supporting chains and brackets damaged/ perished, to be renewed (As per sample). Chain dia -14 mm Mat-SS | 016Rubber Fenders(b) Rubber fenders supporting chains and brackets damaged/ perished, to be renewed (As per sample). Chain dia -14 mm Mat-SS |
| 27 | 016Rubber Fenders©deck eye for securing of fenders damaged at various lacation. To be renewed. | 016Rubber Fenders©deck eye for securing of fenders damaged at various lacation. To be renewed. |
| 28 | 016Rubber Fenders(c) D shackels for securing of chains for rubber fenders to be renewed (As per sample). D shackle - 10 mm, Mat-SS | 016Rubber Fenders(c) D shackels for securing of chains for rubber fenders to be renewed (As per sample). D shackle - 10 mm, Mat-SS |
| 29 | 017HingesHinges of GRP hatches leading to void space uprooted. To be renewed. Mat - Brass | 017HingesHinges of GRP hatches leading to void space uprooted. To be renewed. Mat - Brass |
| 30 | 018Sliding windowSliding glass of window jammed/broken. Window glass to be renewed with locking arrangement and handles and necessary repairs to be undertaken for operation. Quote inclusive of all materialsNote: Each window consist of 02 sliding glasses. | 018Sliding windowSliding glass of window jammed/broken. Window glass to be renewed with locking arrangement and handles and necessary repairs to be undertaken for operation. Quote inclusive of all materialsNote: Each window consist of 02 sliding glasses. |
| 31 | 019Non Water Tight Wooden DoorNWT wooden door to be renewed including door coaming/frame and locking arrangement. | 019Non Water Tight Wooden DoorNWT wooden door to be renewed including door coaming/frame and locking arrangement. |
| 32 | 020Deck head Water leakage observed from Deck head of aft control room. Entire deck head to be renewed using supporting frames for strengthning of deck. Deck to be provisioned with proper slope for drainage of water.Mat-GRP/Wooden, Thickness-12mmNote- Quote for service and material | 020Deck head Water leakage observed from Deck head of aft control room. Entire deck head to be renewed using supporting frames for strengthning of deck. Deck to be provisioned with proper slope for drainage of water.Mat-GRP/Wooden, Thickness-12mmNote- Quote for service and material |
| 33 | 021Drainage systemScupper on main deck damaged/perished. Scupper to be renewed. | 021Drainage systemScupper on main deck damaged/perished. Scupper to be renewed. |
| 34 | 08 Surface PreparationInternal CompartmentSurface preparation to be carried out in occordance with NO 20/16 by Wooden scraper and sanding machine for removal of paint. | 08 Surface PreparationInternal CompartmentSurface preparation to be carried out in occordance with NO 20/16 by Wooden scraper and sanding machine for removal of paint. |
| 35 | 09 Painting - JOTUN Scheme.Internal CompartmentPaint above water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard Primer -50 microns Dft | 09 Painting - JOTUN Scheme.Internal CompartmentPaint above water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard Primer -50 microns Dft |
| 36 | 09 Painting - JOTUN Scheme. Internal Compartment Paint above water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat -White interior fire retardent paint. DFT-2X100 Micron | 09 Painting - JOTUN Scheme. Internal Compartment Paint above water area with following paint scheme as per OEM recommendations and NO 53/16:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat -White interior fire retardent paint. DFT-2X100 Micron |
| 37 | 10 flood light flood light on main deck not working. Lights to be replaced with new lights. | 10 flood light flood light on main deck not working. Lights to be replaced with new lights. |
| 38 | 11 General lighting (a) General lighting arrangement not working. Wiring damaged at various location Serveciability checks of wiring to be carried out. Damaged wire to be renewed. | 11 General lighting (a) General lighting arrangement not working. Wiring damaged at various location Serveciability checks of wiring to be carried out. Damaged wire to be renewed. |
| 39 | 11 General lighting(b) Led bulb not working at various location. Bulb with shed to be renewed. | 11 General lighting(b) Led bulb not working at various location. Bulb with shed to be renewed. |
| 40 | Allied Services(A) Docking and undocking charges (Both Versions) Firm not to quote. Docking and undocking will be done by Navy in Navy premises i.e. ND(V)/ slipway | Allied Services(A) Docking and undocking charges (Both Versions) Firm not to quote. Docking and undocking will be done by Navy in Navy premises i.e. ND(V)/ slipway |
| 41 | Provide two transports (cars-Commercial Vehicle) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 10 hrs or 100KM/day whichever is lessNote: firm not to quote. | Provide two transports (cars-Commercial Vehicle) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 10 hrs or 100KM/day whichever is lessNote: firm not to quote. |
| 42 | Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 4000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals.Note:- firms to quote. | Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 4000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals.Note:- firms to quote. |
| 43 | Provide two nos transport (for material transfer) for entire refit duration. Firm Not to Quote | Provide two nos transport (for material transfer) for entire refit duration. Firm Not to Quote |
| 44 | QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS.Fiem Not Quote | QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS.Fiem Not Quote |
| 45 | Fire main hoses to be Provided for entire refit duration.Firm Not to Quote. | Fire main hoses to be Provided for entire refit duration.Firm Not to Quote. |
| 46 | Fresh Water / Drinking WaterSupply of 05 nos Bottled drinking water cans per day (Each Capacity-20Ltr) for entire refit duration of 90 days. Payment at actuals. | Fresh Water / Drinking WaterSupply of 05 nos Bottled drinking water cans per day (Each Capacity-20Ltr) for entire refit duration of 90 days. Payment at actuals. |