| 1 | Stringing of one km 3 PH 11kV linewith XLPE Insulated ACSR Raccoon orequivalant (3 conductors) after fittinginsulators, binding conductors to pininsulators using suitable tie andanchoring with wedge type anchoringclamps including cutting and removingtree branches wherever necessaryexcluding cut point works. |
| 2 | Labour charges for loading HT PSC polefrom the stacking place and unloadingthe same at work site (transportation by Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4numbers of poles excluding loading&unloading charges. |
| 3 | Fitting and erecting one HT PSC SinglePole in position, including fitting crossarm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 4 | Renewal of existing damaged/old 11kVPSC/RCC Pole with new PSC pole inplace including excavation, erection ofnew pole, backfilling pit and refitting ofall items etc. and conveyance of allmaterials except pole. |
| 5 | Labour charges for loading HT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 6 | Dismantling (without damage) one km11kV line (three conductors) includingdismantling cross arm, insulators, disc,disconnecting jumper connection, rollingthe conductor and stacking the materials. |
| 7 | Dismantling one damaged LT PSC/RCCpole after disconnecting stays, strut etc.attached thereon and stacking the same. |
| 8 | Additional rate for excavation of one Pitfor HT Pole/HT Stay in Hard Laterite. |
| 9 | Fitting and providing one HT Stay for11kV pole, including digging and backfilling pit in ordinary soil. |
| 10 | Renewal of existing damaged/old 11kVStay with new stay in place includingexcavation & backfilling of pit,dismantling, refitting of all items andconveyance of all materials. |
| 11 | Fitting and providing one Strut using HTPSC pole including digging and backfilling pit in ordinary soil. |
| 12 | Providing one Coil Earth using No.8 GIearth wire (50mm dia, 115 turns)including digging separate pit(0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinarysoil & backfilling. |
| 13 | Fitting one set AB switch on existingDP, giving connection and drawingsufficient length of GI earthing leads tothe ground for earthing, excludingprovision of earthing. |
| 14 | Fitting one Additional 2.4m/3m Channelcross arm (100x50x6mm), in existing11kV DP including conveyance ofmaterials. |
| 15 | Drilling hole of various sizes on existingChannel/Cross Arm. |
| 16 | Providing one Earth using GI earth pipeof size 38.1mm dia, 2.5m lengthincluding digging separate pit(0.45x0.45x2.5m) at standard distance(1.5m) away from the pole/structure inordinary soil & backfilling the pit with15cm alternate layer of charcoal, salt andsand up to 90cm from the bottom.including the cost of 20kg salt, 25kgcharcoal, excluding supply of earth pipe. |
| 17 | Fitting and erecting one HT Double PoleStructure using PSC pole in positionincluding fitting 2 channel cross arms,digging and back filling pit in ordinarysoil, drawing sufficient length of GIearthing leads through all cross arms tothe ground for earthing (excludingprovision of earthing). Please Enable Macros to View BoQ information |