| Sl. No. | Item Title | Item Description |
| 1 | SULLAGE BARGE - NR(26)001 HULL WORK PACKAGE Docking Vessel to be docked in both versions.Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in ND(V) Premises (Slipway/Drydock).Note 2:- Last docked on 07 Nov 23 | SULLAGE BARGE - NR(26)001 HULL WORK PACKAGE Docking Vessel to be docked in both versions.Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in ND(V) Premises (Slipway/Drydock).Note 2:- Last docked on 07 Nov 23 |
| 2 | 002 Cleaning (a) Under Water Hull and Boot Top Area HP jet cleaning of entire under water area and boot top area to be carried out (with a pressure not exceeding 3000 PSI) to remove the marine growth/barnacles and prepare for survey. | 002 Cleaning (a) Under Water Hull and Boot Top Area HP jet cleaning of entire under water area and boot top area to be carried out (with a pressure not exceeding 3000 PSI) to remove the marine growth/barnacles and prepare for survey. |
| 3 | 002 Cleaning (b) Sullage tanks(06 Nos) and Passage area Manually cleaning of sullage tanks and passage area to be carried out with soap water to remove accumulated fuel and residual muck. Post cleaning bilges to be presented for survey. . | 002 Cleaning (b) Sullage tanks(06 Nos) and Passage area Manually cleaning of sullage tanks and passage area to be carried out with soap water to remove accumulated fuel and residual muck. Post cleaning bilges to be presented for survey. . |
| 4 | 002 Cleaning (c) Sullage tanks(06 Nos) and Passage area Disposal of waste/residual muck at the bottom of all tanks to be carried out as per extant rule. Firm to provision removal, collection, reception, storage, transport and disposal of hazardous material. | 002 Cleaning (c) Sullage tanks(06 Nos) and Passage area Disposal of waste/residual muck at the bottom of all tanks to be carried out as per extant rule. Firm to provision removal, collection, reception, storage, transport and disposal of hazardous material. |
| 5 | 002 Cleaning(d) Bilges Manually cleaning of pump room bilges to be carried out with soap water followed by fresh water washing and make the bilges free of accumulated oily water and muck. Post cleaning bilges to be presented for survey. | 002 Cleaning(d) Bilges Manually cleaning of pump room bilges to be carried out with soap water followed by fresh water washing and make the bilges free of accumulated oily water and muck. Post cleaning bilges to be presented for survey. |
| 6 | 003 Hull Survey (a) Carry out visual and hammer survey of under water hull and boot top area in accordance with NO 01/15. Note:- (ii) Firm to submit 07 copies of hull survey report . | 003 Hull Survey (a) Carry out visual and hammer survey of under water hull and boot top area in accordance with NO 01/15. Note:- (ii) Firm to submit 07 copies of hull survey report . |
| 7 | 003 Hull Survey (b) Carry out UTG survey in accordance with NO 01/15 of under water hull boot top area. Note:- (i) Firm to submit 07 copies of hull survey report . (ii) Quote for UTG survey points | 003 Hull Survey (b) Carry out UTG survey in accordance with NO 01/15 of under water hull boot top area. Note:- (i) Firm to submit 07 copies of hull survey report . (ii) Quote for UTG survey points |
| 8 | 004 Steel renewalQuote for steel renewal at various locations as per survey reportNote :- Quoted repair cost shall include cost of both sides blasted and primed IS 2062 Grade `B’ quality steel. Degutting/ regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipment's with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal was undertaken etc. | 004 Steel renewalQuote for steel renewal at various locations as per survey reportNote :- Quoted repair cost shall include cost of both sides blasted and primed IS 2062 Grade `B’ quality steel. Degutting/ regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipment's with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal was undertaken etc. |
| 9 | 005 Build ups(a) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 25 x 25 mm | 005 Build ups(a) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 25 x 25 mm |
| 10 | 005 Build ups(b) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 50 x 50 mm | 005 Build ups(b) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 50 x 50 mm |
| 11 | 006 Fairing of deformed structureCarryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor | 006 Fairing of deformed structureCarryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor |
| 12 | 007 Re-weldingCarry out re-welding runs on weld seams as indicated by Hull survey team. | 007 Re-weldingCarry out re-welding runs on weld seams as indicated by Hull survey team. |
| 13 | 008 Draft marks(a) Draught mark letters/numbers corroded, to be renewed. | 008 Draft marks(a) Draught mark letters/numbers corroded, to be renewed. |
| 14 | 008 Draft marks(b) Draught mark letters/numbers to be painted with FR white paint. | 008 Draft marks(b) Draught mark letters/numbers to be painted with FR white paint. |
| 15 | 009 Sacrificial anodes(a) Renew Sacrificial anodes those consumed more than 50% Type: MK-I Note:- Anodes to be supplied by firm. | 009 Sacrificial anodes(a) Renew Sacrificial anodes those consumed more than 50% Type: MK-I Note:- Anodes to be supplied by firm. |
| 16 | 009 Sacrificial anodes(b) Renew Sacrificial anodes those consumed more than 50% Type: MK-VI Note:- Anodes to be supplied by firm. | 009 Sacrificial anodes(b) Renew Sacrificial anodes those consumed more than 50% Type: MK-VI Note:- Anodes to be supplied by firm. |
| 17 | 010 Surface Preparation Under Water area (a) Surface preparation to SA 2.5 standard using grit blasting to be carried out as per the paint OEM rep recommendation. | 010 Surface Preparation Under Water area (a) Surface preparation to SA 2.5 standard using grit blasting to be carried out as per the paint OEM rep recommendation. |
| 18 | 010 Surface Preparation Under Water area (b) Sweep blasting to be carried out as per the paint OEM rep recommendation for removal of loose paint. | 010 Surface Preparation Under Water area (b) Sweep blasting to be carried out as per the paint OEM rep recommendation for removal of loose paint. |
| 19 | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Penguard primer -50 microns | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Penguard primer -50 microns |
| 20 | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns |
| 21 | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns |
| 22 | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns |
| 23 | 011 Painting Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns | 011 Painting Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns |
| 24 | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns | 011 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns |
| 25 | 011 Painting Under Water Area - JOTUN Scheme. Paint Boot top area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Classic Black- 150 microns | 011 Painting Under Water Area - JOTUN Scheme. Paint Boot top area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Classic Black- 150 microns |
| 26 | 012 Surface preparation Above Water Area including Bulwark (a) Carry out grit blasting to SA 2.5 standard surface preparation for paint application as per survey report by Paint OEM rep | 012 Surface preparation Above Water Area including Bulwark (a) Carry out grit blasting to SA 2.5 standard surface preparation for paint application as per survey report by Paint OEM rep |
| 27 | 012 Surface preparation Above Water Area including Bulwark (b) Carry out sweep blasting on above water area for surface preparation for paint application as per survey report by Paint OEM rep | 012 Surface preparation Above Water Area including Bulwark (b) Carry out sweep blasting on above water area for surface preparation for paint application as per survey report by Paint OEM rep |
| 28 | 013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (a) 1st Coat: Penguard primer - 50 microns DFT | 013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (a) 1st Coat: Penguard primer - 50 microns DFT |
| 29 | 013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT | 013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT |
| 30 | 013 Painting- Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT | 013 Painting- Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT |
| 31 | 013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: RAL 9011 Black | 013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: RAL 9011 Black |
| 32 | 014 Surface preparation Super Structure and Deck Fittings (a) Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application. | 014 Surface preparation Super Structure and Deck Fittings (a) Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application. |
| 33 | 014 Surface preparation Super Structure and Deck Fittings (b) Carry out mechanical cleaning to ST1 standard. | 014 Surface preparation Super Structure and Deck Fittings (b) Carry out mechanical cleaning to ST1 standard. |
| 34 | 015 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT | 015 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT |
| 35 | 015 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80( Red ) - 125 microns DFT | 015 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80( Red ) - 125 microns DFT |
| 36 | 015 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c)3rd Coat: Jotamastic 80(Grey) - 125 microns DFT | 015 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c)3rd Coat: Jotamastic 80(Grey) - 125 microns DFT |
| 37 | 015 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: IS 5/358 Buff colour. 2 Coat of 60 microns DFT each | 015 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: IS 5/358 Buff colour. 2 Coat of 60 microns DFT each |
| 38 | 016 Surface preparation Weather Decks Carry out hydro-jet blasting of entire weather deck, bridge deck and flag deck. | 016 Surface preparation Weather Decks Carry out hydro-jet blasting of entire weather deck, bridge deck and flag deck. |
| 39 | 017 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT | 017 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT |
| 40 | 017 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 - 150 microns DFT | 017 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 - 150 microns DFT |
| 41 | 017 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota armour -800 microns DFT | 017 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota armour -800 microns DFT |
| 42 | 018 Surface preparation Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam a) Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for touch up painting. | 018 Surface preparation Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam a) Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for touch up painting. |
| 43 | 018 Surface preparation Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for touch up painting. | 018 Surface preparation Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for touch up painting. |
| 44 | 019 Painting Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam (JOTUN Scheme) Paint fore peak tank, cofferdam and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a)1st Coat: primer - Penguard primer -50 microns DFT | 019 Painting Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam (JOTUN Scheme) Paint fore peak tank, cofferdam and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a)1st Coat: primer - Penguard primer -50 microns DFT |
| 45 | 019 Painting Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam (JOTUN Scheme) Paint fore peak tank, cofferdam and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacoat universal (Aluminium) - 150 microns | 019 Painting Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam (JOTUN Scheme) Paint fore peak tank, cofferdam and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacoat universal (Aluminium) - 150 microns |
| 46 | 019 Painting Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam (JOTUN Scheme) Paint fore peak tank, cofferdam and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacoat universal (Grey) - 150 microns | 019 Painting Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam (JOTUN Scheme) Paint fore peak tank, cofferdam and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacoat universal (Grey) - 150 microns |
| 47 | 019 Painting Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam (JOTUN Scheme) Paint fore peak tank, cofferdam and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Anticorrosive - Penguard Topcoat - 50 microns | 019 Painting Internal Compartments - Fore Peak Tank, Cable locker, Void space and Cofferdam (JOTUN Scheme) Paint fore peak tank, cofferdam and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Anticorrosive - Penguard Topcoat - 50 microns |
| 48 | 020 Surface preparation Pump Room Bilges a) Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application. | 020 Surface preparation Pump Room Bilges a) Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application. |
| 49 | 020 Surface preparation Pump Room Bilges b) Carry out mechanical cleaning to ST 1 standard as survey report of Paint OEM for paint application. | 020 Surface preparation Pump Room Bilges b) Carry out mechanical cleaning to ST 1 standard as survey report of Paint OEM for paint application. |
| 50 | 021 Painting Pump room bilges- JOTUN Scheme. Paint bilges of Pump room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT | 021 Painting Pump room bilges- JOTUN Scheme. Paint bilges of Pump room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT |
| 51 | 021 Painting Pump room bilges- JOTUN Scheme. Paint bilges of Pump room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns | 021 Painting Pump room bilges- JOTUN Scheme. Paint bilges of Pump room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns |
| 52 | 021 Painting Pump room bilges- JOTUN Scheme. Paint bilges of Pump room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns | 021 Painting Pump room bilges- JOTUN Scheme. Paint bilges of Pump room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns |
| 53 | 021 Painting Pump room bilges- JOTUN Scheme. Paint bilges of Pump room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns. | 021 Painting Pump room bilges- JOTUN Scheme. Paint bilges of Pump room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns. |
| 54 | 022 Surface preparation Pump Room Bulkheads Carry out mechanical cleaning to ST 3 standard. | 022 Surface preparation Pump Room Bulkheads Carry out mechanical cleaning to ST 3 standard. |
| 55 | 023 Painting Pump Room Bulkheads - Jotun Scheme. Paint bulkheads of pump room with following paint:-(a) 1st Coat: primer - Penguard primer -50 microns DFT Note:- Quoted repair cost shall be inclusive of cost of paints also. | 023 Painting Pump Room Bulkheads - Jotun Scheme. Paint bulkheads of pump room with following paint:-(a) 1st Coat: primer - Penguard primer -50 microns DFT Note:- Quoted repair cost shall be inclusive of cost of paints also. |
| 56 | 023 Painting Pump Room Bulkheads - Jotun Scheme. Paint bulkheads of pump room with following paint:- (a) 1st Coat: Interior white fire retardant paint (1X100 micron). Note:- Quoted repair cost shall be inclusive of cost of paints also. | 023 Painting Pump Room Bulkheads - Jotun Scheme. Paint bulkheads of pump room with following paint:- (a) 1st Coat: Interior white fire retardant paint (1X100 micron). Note:- Quoted repair cost shall be inclusive of cost of paints also. |
| 57 | 024 Surface preparation Electrical control room Carry out mechanical cleaning to ST 3 standard of entire area of electrical control room. | 024 Surface preparation Electrical control room Carry out mechanical cleaning to ST 3 standard of entire area of electrical control room. |
| 58 | 025 Painting Electrical control room- JOTUN Scheme. Paint Electrical control room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT | 025 Painting Electrical control room- JOTUN Scheme. Paint Electrical control room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT |
| 59 | 025 Painting Electrical control room- JOTUN Scheme. Paint Electrical control room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns | 025 Painting Electrical control room- JOTUN Scheme. Paint Electrical control room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns |
| 60 | 025 Painting Electrical control room- JOTUN Scheme. Paint Electrical control room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns | 025 Painting Electrical control room- JOTUN Scheme. Paint Electrical control room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns |
| 61 | 025 Painting Electrical control room- JOTUN Scheme. Paint Electrical control room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns. | 025 Painting Electrical control room- JOTUN Scheme. Paint Electrical control room with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns. |
| 62 | 026 Surface preparation Internal compartment Carry out mechanical cleaning to ST 3 standard of paint store, deck store for paint application. | 026 Surface preparation Internal compartment Carry out mechanical cleaning to ST 3 standard of paint store, deck store for paint application. |
| 63 | 027 Painting Internal Compartment - JOTUN Scheme. Paint the entire deck area of paint store, deck store with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT | 027 Painting Internal Compartment - JOTUN Scheme. Paint the entire deck area of paint store, deck store with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT |
| 64 | 027 Painting Internal Compartment - JOTUN Scheme. Paint the entire deck area of paint store, deck store with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: primer - Jotamastic 80 grey - 150 microns DFT | 027 Painting Internal Compartment - JOTUN Scheme. Paint the entire deck area of paint store, deck store with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: primer - Jotamastic 80 grey - 150 microns DFT |
| 65 | 027 Painting Internal Compartment - JOTUN Scheme. Paint the entire deck area of paint store, deck store with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: primer - Middle burnswick green finishing paint - 100 microns DFT | 027 Painting Internal Compartment - JOTUN Scheme. Paint the entire deck area of paint store, deck store with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: primer - Middle burnswick green finishing paint - 100 microns DFT |
| 66 | 028 Surface preparation Sullage Tanks Carry out manual cleaning of all sullage tanks and prepare surface for application of OM 750. | 028 Surface preparation Sullage Tanks Carry out manual cleaning of all sullage tanks and prepare surface for application of OM 750. |
| 67 | 029 Painting Sullage Tanks (a) Apply 02 coat of OM 750 oil post surface preparation. | 029 Painting Sullage Tanks (a) Apply 02 coat of OM 750 oil post surface preparation. |
| 68 | 029 Painting Sullage Tanks (b) For application of tank coating , firm to provision OM 750 Oil | 029 Painting Sullage Tanks (b) For application of tank coating , firm to provision OM 750 Oil |
| 69 | 030 Anchor and Anchor chain cable. (a) Anchor are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 7/2011 and refit back. Note : -The job involves removal of anchors, chain cables and accessories, laying out for cleaning, painting and refitment. | 030 Anchor and Anchor chain cable. (a) Anchor are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 7/2011 and refit back. Note : -The job involves removal of anchors, chain cables and accessories, laying out for cleaning, painting and refitment. |
| 70 | 030 Anchor and Anchor chain cable. (b) Chain cable (dia 17.5 mm) are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 07/2011 and refit back. (i) Full Shackles- 08 (ii) Half Shackles- 04 | 030 Anchor and Anchor chain cable. (b) Chain cable (dia 17.5 mm) are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 07/2011 and refit back. (i) Full Shackles- 08 (ii) Half Shackles- 04 |
| 71 | 030 Anchor and Anchor chain cable. (c) Swivel piece are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey iaw NO 07/2011 and refit back. | 030 Anchor and Anchor chain cable. (c) Swivel piece are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey iaw NO 07/2011 and refit back. |
| 72 | 030 Anchor and Anchor chain cable. (d) Lug less joining shackles are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey iaw NO 7/2011 and refit back. | 030 Anchor and Anchor chain cable. (d) Lug less joining shackles are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey iaw NO 7/2011 and refit back. |
| 73 | 030 Anchor and Anchor chain cable. (e) D - Shackles are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 07/2011 and refit back. | 030 Anchor and Anchor chain cable. (e) D - Shackles are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 07/2011 and refit back. |
| 74 | 031 Anchor windlass Overhauling of manual anchor windlass system to be carried out. Job involves the following:(a) Completely stripping of entire system to be carried out. Gypsy, warping head, break lining and other assembly to be dismantled.(b) All parts to be cleaned and lubricated.(c) renew brake lining.Note: Prove for satisfactory operation post overhauling. Quoted price to include cost of liners and spares also. | 031 Anchor windlass Overhauling of manual anchor windlass system to be carried out. Job involves the following:(a) Completely stripping of entire system to be carried out. Gypsy, warping head, break lining and other assembly to be dismantled.(b) All parts to be cleaned and lubricated.(c) renew brake lining.Note: Prove for satisfactory operation post overhauling. Quoted price to include cost of liners and spares also. |
| 75 | 032 Bollards (a) Twin bollard and foundation corroded and thinned. To be repaired as per hull survey report. Dimension: 700X250X100 (mm)Pipe dia - 200 mm, Pipe height 250 mm | 032 Bollards (a) Twin bollard and foundation corroded and thinned. To be repaired as per hull survey report. Dimension: 700X250X100 (mm)Pipe dia - 200 mm, Pipe height 250 mm |
| 76 | 032 Bollards (b) Twin bollard and foundations corroded and thinned. To be renewed as per hull survey report. Dimension: 700X250X100 (mm)Pipe dia - 200 mm, Pipe height 250 mm | 032 Bollards (b) Twin bollard and foundations corroded and thinned. To be renewed as per hull survey report. Dimension: 700X250X100 (mm)Pipe dia - 200 mm, Pipe height 250 mm |
| 77 | 033 Guardrails (a) Fixed verticals guardrail stanchions on weather deck deformed/bent from deck. To be renewed. (Mat-MS angle bar) | 033 Guardrails (a) Fixed verticals guardrail stanchions on weather deck deformed/bent from deck. To be renewed. (Mat-MS angle bar) |
| 78 | 033 Guardrails (b) Fixed Horizontal guardrails pipe on weather deck deformed/bent To be renewed. (Mat-GI Pipe, dia 2 inch) | 033 Guardrails (b) Fixed Horizontal guardrails pipe on weather deck deformed/bent To be renewed. (Mat-GI Pipe, dia 2 inch) |
| 79 | 033 Guardrails (c) Fixed Horizontal guardrails pipe on weather deck deformed/bent To be renewed. (Mat- MS rod dia-1 inch) | 033 Guardrails (c) Fixed Horizontal guardrails pipe on weather deck deformed/bent To be renewed. (Mat- MS rod dia-1 inch) |
| 80 | 033 Guardrails (d) Metallic chain (16mm) of guardrails stanchions corroded to be renewed. Renewal cost should include cost of material also. | 033 Guardrails (d) Metallic chain (16mm) of guardrails stanchions corroded to be renewed. Renewal cost should include cost of material also. |
| 81 | 034 Sanitary system Soil pipes to be removed, chemically cleaned, pressure tested and fitted back in situ. Mat: MS , Dia: 2.5 inch. (Pressure: 3Kg/Cm2) | 034 Sanitary system Soil pipes to be removed, chemically cleaned, pressure tested and fitted back in situ. Mat: MS , Dia: 2.5 inch. (Pressure: 3Kg/Cm2) |
| 82 | 035 Ventilation system Mushroom head of ventilation system to be overhauled and fitted back. Job involve the stripping of all parts of mushroom head, cleaning of all parts. greasing of all parts where ever required, renewal of rubber beading and followed by assembling of all parts. Details- Mush room head dia-500 mm | 035 Ventilation system Mushroom head of ventilation system to be overhauled and fitted back. Job involve the stripping of all parts of mushroom head, cleaning of all parts. greasing of all parts where ever required, renewal of rubber beading and followed by assembling of all parts. Details- Mush room head dia-500 mm |
| 83 | 036 Furniture Sunmica to be renewed at indicated locations. | 036 Furniture Sunmica to be renewed at indicated locations. |
| 84 | 037 Sanitary System (a) Shower head to be renewed.Make: JaguarNote:- Job includes fitment of relevant fittings and connections. firm to quote for same in BoQ | 037 Sanitary System (a) Shower head to be renewed.Make: JaguarNote:- Job includes fitment of relevant fittings and connections. firm to quote for same in BoQ |
| 85 | 037 Sanitary System (b) Ceramic Wash basin along with drain pipe to be renewed.Make: CERA Note:- Job includes fitment of relevant fittings and connections. firm to quote for same in BoQ | 037 Sanitary System (b) Ceramic Wash basin along with drain pipe to be renewed.Make: CERA Note:- Job includes fitment of relevant fittings and connections. firm to quote for same in BoQ |
| 86 | 037 Sanitary System (b) Taps in crew bathroom damaged to be renewed.Make: JaguarNote:- Job includes fitment of relevant fittings and connections. firm to quote for same in BoQ | 037 Sanitary System (b) Taps in crew bathroom damaged to be renewed.Make: JaguarNote:- Job includes fitment of relevant fittings and connections. firm to quote for same in BoQ |
| 87 | 037 Sanitary System (b) W/C to be renewed in crew wash room.Make: CERANote:- Job includes fitment of relevant fittings and connections. firm to quote for same in BoQ | 037 Sanitary System (b) W/C to be renewed in crew wash room.Make: CERANote:- Job includes fitment of relevant fittings and connections. firm to quote for same in BoQ |
| 88 | 038 Funnel Exhaust (a) Distance pieces of funnel exhaust pipe corroded including flanges & gaskets , to be renewed. Note:- Quoted repair cost shall include cost all items/spares. Mat: MS, 1.5 inch - 02 nos, 1 inch - 02 nos | 038 Funnel Exhaust (a) Distance pieces of funnel exhaust pipe corroded including flanges & gaskets , to be renewed. Note:- Quoted repair cost shall include cost all items/spares. Mat: MS, 1.5 inch - 02 nos, 1 inch - 02 nos |
| 89 | 038 Funnel Exhaust (b) Dip trays around the vents on deck to be renewed. Draining arrangement to provisioned for dip trays Note:- Quoted repair cost shall include cost all items/spares. | 038 Funnel Exhaust (b) Dip trays around the vents on deck to be renewed. Draining arrangement to provisioned for dip trays Note:- Quoted repair cost shall include cost all items/spares. |
| 90 | 039 Tyre fenders Tyre fender damaged on P&S side , to be renewed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere to SoW (a) OD 750mm; ID 450 mm , width - 250 mm | 039 Tyre fenders Tyre fender damaged on P&S side , to be renewed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere to SoW (a) OD 750mm; ID 450 mm , width - 250 mm |
| 91 | 039 Tyre fenders (b) Renewal of deck eyes for securing of chain. | 039 Tyre fenders (b) Renewal of deck eyes for securing of chain. |
| 92 | 039 Tyre fenders (c) Provisioning and fitment of Securing chain (16 MM DIA) for tyre fenders | 039 Tyre fenders (c) Provisioning and fitment of Securing chain (16 MM DIA) for tyre fenders |
| 93 | 039 Tyre fenders (d) Manufacturing and fitment of Bush for passing chain on tyres.Mat - MS | 039 Tyre fenders (d) Manufacturing and fitment of Bush for passing chain on tyres.Mat - MS |
| 94 | 039 Tyre fenders (e) Provisioning and fitment of D shackles (16 mm) with securing arrangement in all Tyre fenders | 039 Tyre fenders (e) Provisioning and fitment of D shackles (16 mm) with securing arrangement in all Tyre fenders |
| 95 | 040 D shape Fenders (a) 'D' shaped rubber fenders damaged/perished to be renewed. Colour - GREY/WHITE Length - 1000 mm length Material - EPDM rubber as per NES170 | 040 D shape Fenders (a) 'D' shaped rubber fenders damaged/perished to be renewed. Colour - GREY/WHITE Length - 1000 mm length Material - EPDM rubber as per NES170 |
| 96 | 040 D shape Fenders Securing brackets (b) Fender securing flat bar brackets to be renewed as necessary.(Mat- MS). Size : 1100MM x 110MM x 08MM | 040 D shape Fenders Securing brackets (b) Fender securing flat bar brackets to be renewed as necessary.(Mat- MS). Size : 1100MM x 110MM x 08MM |
| 97 | 040 D shape Fenders Securing brackets (c) Fender securing 'C' brackets to be renewed as necessary.(Mat- MS). Size : 200MM x 110MM x 08MM | 040 D shape Fenders Securing brackets (c) Fender securing 'C' brackets to be renewed as necessary.(Mat- MS). Size : 200MM x 110MM x 08MM |
| 98 | 041 Rubber beading (a) Rubber beading of WT doors to be renewed and chalk test to be proved. | 041 Rubber beading (a) Rubber beading of WT doors to be renewed and chalk test to be proved. |
| 99 | 041 Rubber beading (b) Rubber beading of WT hatch to be renewed and chalk test to be proved. | 041 Rubber beading (b) Rubber beading of WT hatch to be renewed and chalk test to be proved. |
| 100 | 042 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (a) Forepeak Tank - 01(b) Sullage tank - 06(c) Void space - 06(d) Cable locker - 02(e) Cofferdam - 04 | 042 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (a) Forepeak Tank - 01(b) Sullage tank - 06(c) Void space - 06(d) Cable locker - 02(e) Cofferdam - 04 |
| 101 | 043 Bilge platform (a) Renew bilge platform plate. Material- aluminium chequered plate, thickness- 05 mm | 043 Bilge platform (a) Renew bilge platform plate. Material- aluminium chequered plate, thickness- 05 mm |
| 102 | 043 Bilge platform (b) Supporting brackets to be renewed where ever required (Mat - Ms angle bar). Securing nut & bolts to be of Mat-SS. | 043 Bilge platform (b) Supporting brackets to be renewed where ever required (Mat - Ms angle bar). Securing nut & bolts to be of Mat-SS. |
| 103 | 044 Cleats Overhauling of MS cleats to be carried out. job involve following: -(a) open nuts and bolts and strip all parts of cleat.(b) clean and apply grease on all parts including nuts and bolts(c) refit all parts. | 044 Cleats Overhauling of MS cleats to be carried out. job involve following: -(a) open nuts and bolts and strip all parts of cleat.(b) clean and apply grease on all parts including nuts and bolts(c) refit all parts. |
| 104 | 045 Tank breathers (a) Tank breather pipe and breather head damaged/corroded to be renewed. Job include renewal of wire mesh, rubber gasket and SS nut bolt. Mat- MS | 045 Tank breathers (a) Tank breather pipe and breather head damaged/corroded to be renewed. Job include renewal of wire mesh, rubber gasket and SS nut bolt. Mat- MS |
| 105 | 045 Tank breathers (a) Tank breather pipe and breather head damaged/corroded to be repaired. Job include renewal of wire mesh, rubber gasket and SS nut bolt. Mat- MS | 045 Tank breathers (a) Tank breather pipe and breather head damaged/corroded to be repaired. Job include renewal of wire mesh, rubber gasket and SS nut bolt. Mat- MS |
| 106 | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (a) Application of Primer - DFT 50 micron | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (a) Application of Primer - DFT 50 micron |
| 107 | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (b) Application of Underlay as per NCD 3717 | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (b) Application of Underlay as per NCD 3717 |
| 108 | 048 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments (c) Application of sealer coat and top coat on entire area As Per NCD 3717. | 048 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments (c) Application of sealer coat and top coat on entire area As Per NCD 3717. |
| 109 | 046 Deck underlay Battery store, bridge and crew room Surface preparation to be carried out and apply only sealer coat on entire area. | 046 Deck underlay Battery store, bridge and crew room Surface preparation to be carried out and apply only sealer coat on entire area. |
| 110 | 047 WT Hatches WT hatch clips to be removed, cleaned, greased and refitted Note: each WT hatch fitted with 04 clips. | 047 WT Hatches WT hatch clips to be removed, cleaned, greased and refitted Note: each WT hatch fitted with 04 clips. |
| 111 | 048 WT Doors (a) Water tight door clips, clamps and hinges to be cleaned, make operational and well greased. Note: Each door fitted with 08 clips. | 048 WT Doors (a) Water tight door clips, clamps and hinges to be cleaned, make operational and well greased. Note: Each door fitted with 08 clips. |
| 112 | 048 WT Doors (b) Water tight door gaskets, & water tight seals to be renewed. No paint to be observed on door seal. | 048 WT Doors (b) Water tight door gaskets, & water tight seals to be renewed. No paint to be observed on door seal. |
| 113 | 049 Manhole (a) Rubber Joints of tanks manhole to be renewed | 049 Manhole (a) Rubber Joints of tanks manhole to be renewed |
| 114 | 049 Manhole (b) Studs of manholes perished, to be renewed (Only defective studs to be renewed as per survey report MS Studs with nut, size 20 mm | 049 Manhole (b) Studs of manholes perished, to be renewed (Only defective studs to be renewed as per survey report MS Studs with nut, size 20 mm |
| 115 | 050 Name Board (a) Wooden name board including SS letters damaged/broken. Wooden board and latter to be renewed and as per sample/existing fitting. | 050 Name Board (a) Wooden name board including SS letters damaged/broken. Wooden board and latter to be renewed and as per sample/existing fitting. |
| 116 | 050 Name Board (b) Vessel illuminated board damaged/broken. Board to be renewed including LED light. | 050 Name Board (b) Vessel illuminated board damaged/broken. Board to be renewed including LED light. |
| 117 | 050 Name Board (c) Painting of vessel name on bulwark/Ship side in both Hindi and English with fluorescent paint. | 050 Name Board (c) Painting of vessel name on bulwark/Ship side in both Hindi and English with fluorescent paint. |
| 118 | 051 Surface preparation Overhead FW tank Surface preparation to ST3 standard to be carried out. | 051 Surface preparation Overhead FW tank Surface preparation to ST3 standard to be carried out. |
| 119 | 052 Painting Overhead FW tank to be painted with following paint scheme: Primer - Penguard primer -50 microns | 052 Painting Overhead FW tank to be painted with following paint scheme: Primer - Penguard primer -50 microns |
| 120 | 052 Painting Overhead FW tank to be painted with following paint scheme: Penguard HB (White/Grey/White) - 2X100 microns | 052 Painting Overhead FW tank to be painted with following paint scheme: Penguard HB (White/Grey/White) - 2X100 microns |
| 121 | 053 NWT Hatch 02 Nos NWT hatch of over head fresh water tanks jammed, to be eased for operation. | 053 NWT Hatch 02 Nos NWT hatch of over head fresh water tanks jammed, to be eased for operation. |
| 122 | 054 FW Supply line Fresh water supply line at various location corroded, to be renewed at indicated locations.Mat : Cu-ni (dia 1inch) | 054 FW Supply line Fresh water supply line at various location corroded, to be renewed at indicated locations.Mat : Cu-ni (dia 1inch) |
| 123 | ChairsChairs at crew mesh and wheel house damaged. Chairs to be renewed with roller wheel , height adjustable type chairs. | ChairsChairs at crew mesh and wheel house damaged. Chairs to be renewed with roller wheel , height adjustable type chairs. |
| 124 | 055 Furniture Mattress in crew mess torn. Mattress to be renewed as per sample. | 055 Furniture Mattress in crew mess torn. Mattress to be renewed as per sample. |
| 125 | 056 Mushroom head (a) Mushroom head corroded/ damaged at wheel house deck to be repaired. Wire mesh , rubber gasket and nut bolts to be renewed. | 056 Mushroom head (a) Mushroom head corroded/ damaged at wheel house deck to be repaired. Wire mesh , rubber gasket and nut bolts to be renewed. |
| 126 | 057 Rudder & Steering System Eqpt/System: Hand operated steering gear system Make: Hemant Engg works, SL NO 1424, Torque 0.5 NM | 057 Rudder & Steering System Eqpt/System: Hand operated steering gear system Make: Hemant Engg works, SL NO 1424, Torque 0.5 NM |
| 127 | 057 Rudder & Steering System (a) Wire & pulley arrangement from Wheel house to Rudder stock to be Checked for proper operation. Pulley and wire to greased and eased up. | 057 Rudder & Steering System (a) Wire & pulley arrangement from Wheel house to Rudder stock to be Checked for proper operation. Pulley and wire to greased and eased up. |
| 128 | 057 Rudder & Steering System (b) Wire & Pulley arrangement - Defective pulley to be removed and pulley arrangement to be renewed. | 057 Rudder & Steering System (b) Wire & Pulley arrangement - Defective pulley to be removed and pulley arrangement to be renewed. |
| 129 | 057 Rudder & Steering System (c) Wire & Pulley arrangement - Defective wire to be removed and new suitable wire to provisioned for undertaking operation. | 057 Rudder & Steering System (c) Wire & Pulley arrangement - Defective wire to be removed and new suitable wire to provisioned for undertaking operation. |
| 130 | 058 Sewage Treatment Plant (EVAC) (a) STP tank to be opened and all chambers including sludge return line of tank to be cleaned. | 058 Sewage Treatment Plant (EVAC) (a) STP tank to be opened and all chambers including sludge return line of tank to be cleaned. |
| 131 | 058 Sewage Treatment Plant (EVAC) (b) Serviceability check of low level and high level float switch to be carried out. Firm to provide new float switch if found unserviceable. | 058 Sewage Treatment Plant (EVAC) (b) Serviceability check of low level and high level float switch to be carried out. Firm to provide new float switch if found unserviceable. |
| 132 | 058 Sewage Treatment Plant (EVAC) (c) Overhauling of discharge pump to be carried out. Pump to be proved for satisfactory performance, Firm to provide new discharge pump if found unserviceable. | 058 Sewage Treatment Plant (EVAC) (c) Overhauling of discharge pump to be carried out. Pump to be proved for satisfactory performance, Firm to provide new discharge pump if found unserviceable. |
| 133 | 058 Sewage Treatment Plant (EVAC) (d) Overhauling of pressure blower to be carried out. Prove for satisfactory operation, Firm to provide new pressure blower if found unserviceable. | 058 Sewage Treatment Plant (EVAC) (d) Overhauling of pressure blower to be carried out. Prove for satisfactory operation, Firm to provide new pressure blower if found unserviceable. |
| 134 | 058 Sewage Treatment Plant (EVAC) (e) Overhauling and pressure testing of isolating valves to be carried out. Defective valve required to renew. | 058 Sewage Treatment Plant (EVAC) (e) Overhauling and pressure testing of isolating valves to be carried out. Defective valve required to renew. |
| 135 | 058 Sewage Treatment Plant (EVAC) (f) Overhauling of chlorination and dichlorination pumps to be carried out. Pump to be proved for satisfactory performance, Firm to provide new chlorination and dichlorination pumps if found unserviceable. | 058 Sewage Treatment Plant (EVAC) (f) Overhauling of chlorination and dichlorination pumps to be carried out. Pump to be proved for satisfactory performance, Firm to provide new chlorination and dichlorination pumps if found unserviceable. |
| 136 | 058 Sewage Treatment Plant (EVAC) (g) Serviceability/Overhauling of activated sludge airflow meter to be carried out. Firm to provide new if found unserviceable. | 058 Sewage Treatment Plant (EVAC) (g) Serviceability/Overhauling of activated sludge airflow meter to be carried out. Firm to provide new if found unserviceable. |
| 137 | 058 Sewage Treatment Plant (EVAC) (h) Serviceability/Overhauling of discharge flow meter to be carried out. Firm to provide new if found unserviceable. | 058 Sewage Treatment Plant (EVAC) (h) Serviceability/Overhauling of discharge flow meter to be carried out. Firm to provide new if found unserviceable. |
| 138 | 058 Sewage Treatment Plant (EVAC) (i) Chemical cleaning of all pipe line of STP to be carried out and fitted back | 058 Sewage Treatment Plant (EVAC) (i) Chemical cleaning of all pipe line of STP to be carried out and fitted back |
| 139 | 058 Sewage Treatment Plant (EVAC) (J) Chlorination and dichlorination tank are to be cleaned and refilled.Note: On completion of overhauling of complete STP plant, satisfactory trials in presence of OEM rep and ship staff to be conducted. | 058 Sewage Treatment Plant (EVAC) (J) Chlorination and dichlorination tank are to be cleaned and refilled.Note: On completion of overhauling of complete STP plant, satisfactory trials in presence of OEM rep and ship staff to be conducted. |
| 140 | 058 Sewage Treatment Plant (EVAC) (K) Firm to supply 01 in nos Portable H2S Sensor with calibration certificate (Make - Honeywell). | 058 Sewage Treatment Plant (EVAC) (K) Firm to supply 01 in nos Portable H2S Sensor with calibration certificate (Make - Honeywell). |
| 141 | 059DC BAGDC bag torn/ damaged. Firm to supply new DC bag with following DC content.(i) Adjustable - 01 Nos(ii) Jubli Clips - 05 Nos(iii) Soft wood wedges - 15 Nos(iv) Oqum - 2 Kg(v) Spanners - 5 Nos(vi) Multi purpose band - 03 Nos(vii) Stopper plate/ stopper pad - 02 Nos(viii) Rapid Hardening Cement - 20 Kg | 059DC BAGDC bag torn/ damaged. Firm to supply new DC bag with following DC content.(i) Adjustable - 01 Nos(ii) Jubli Clips - 05 Nos(iii) Soft wood wedges - 15 Nos(iv) Oqum - 2 Kg(v) Spanners - 5 Nos(vi) Multi purpose band - 03 Nos(vii) Stopper plate/ stopper pad - 02 Nos(viii) Rapid Hardening Cement - 20 Kg |
| 142 | 060DC Torch(a) DC Torch non-ops/ BER, to be renewed as per sample. | 060DC Torch(a) DC Torch non-ops/ BER, to be renewed as per sample. |
| 143 | 060DC Torch(b) Serviceability checks of DC torch batteries to be carried out. Defective batteries to be renewed. | 060DC Torch(b) Serviceability checks of DC torch batteries to be carried out. Defective batteries to be renewed. |
| 144 | 061KEY SECURING BOARDKey hanging board damaged/ broken to be renewed. | 061KEY SECURING BOARDKey hanging board damaged/ broken to be renewed. |
| 145 | 062GangwayFirm to supply 01 in nos Aluminium gangway of length 6.5 Mtrs with load test certificate. | 062GangwayFirm to supply 01 in nos Aluminium gangway of length 6.5 Mtrs with load test certificate. |
| 146 | 063RopesFirm to supply 220 Mtrs length of 32 mm dia pp ropes. | 063RopesFirm to supply 220 Mtrs length of 32 mm dia pp ropes. |
| 147 | 064Life Saving Appliances(b) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip) including hydrostatic release Unit (HRU Hammer H20R) | 064Life Saving Appliances(b) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip) including hydrostatic release Unit (HRU Hammer H20R) |
| 148 | 064Life raft securing stand(b) Manufacturing and fitment of life raft stand for securing/ placing of life raft. | 064Life raft securing stand(b) Manufacturing and fitment of life raft stand for securing/ placing of life raft. |
| 149 | 065MOB MARKERFirm to supply 02 in nos mob marker. | 065MOB MARKERFirm to supply 02 in nos mob marker. |
| 150 | 065MOB MARKERManufacturing and fitment of 02 in nos securing stand for mob marker. | 065MOB MARKERManufacturing and fitment of 02 in nos securing stand for mob marker. |
| 151 | 066BASCCABASCCA set i.a.w extant naval policies be provisioned for firefighting. Make - dragger or Centurion. Capacity 300 Bar | 066BASCCABASCCA set i.a.w extant naval policies be provisioned for firefighting. Make - dragger or Centurion. Capacity 300 Bar |
| 152 | 067Fire suitFire suit with gloves and boot i.a.w extant naval policies to be provisioned for firefighting . As per sample | 067Fire suitFire suit with gloves and boot i.a.w extant naval policies to be provisioned for firefighting . As per sample |
| 153 | 068 ExtinguishersReplace with new of following extinguishers at various places.(a) 9 Ltrs AFFF extinguishers | 068 ExtinguishersReplace with new of following extinguishers at various places.(a) 9 Ltrs AFFF extinguishers |
| 154 | 068ExtinguishersReplace with new of following extinguishers at various places.(b) 2 Kg CO2 extinguishers. | 068ExtinguishersReplace with new of following extinguishers at various places.(b) 2 Kg CO2 extinguishers. |
| 155 | 068ExtinguishersReplace with new of following extinguishers at various places.(c) 10 Kg DCP extinguishers. | 068ExtinguishersReplace with new of following extinguishers at various places.(c) 10 Kg DCP extinguishers. |
| 156 | 068Extinguishers/ fire HoseReplace with new of following hoses with new at various places.(d) Fire hose length 15 Mtrs Dia 63 mm with end coupling of AL. | 068Extinguishers/ fire HoseReplace with new of following hoses with new at various places.(d) Fire hose length 15 Mtrs Dia 63 mm with end coupling of AL. |
| 157 | 068Extinguishers (e) Extinguisher stand to be manufactured and fitted at various locations. | 068Extinguishers (e) Extinguisher stand to be manufactured and fitted at various locations. |
| 158 | 069PanellingSS panelling at indicated locations damaged to be renewed. | 069PanellingSS panelling at indicated locations damaged to be renewed. |
| 159 | 070Life Saving Appliances(a) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip) including hydrostatic release Unit (HRU Hammer H20R) | 070Life Saving Appliances(a) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip) including hydrostatic release Unit (HRU Hammer H20R) |
| 160 | 070Life Saving Appliances(b) Firm to supply new life buoy (Tug name to be indicated) | 070Life Saving Appliances(b) Firm to supply new life buoy (Tug name to be indicated) |
| 161 | 070Life Saving Appliances(c) Lifebuoy stand damaged to be renewed. Mat - MS | 070Life Saving Appliances(c) Lifebuoy stand damaged to be renewed. Mat - MS |
| 162 | 070Life Saving Appliances(d) Firm to replace with new life jacket made as per SOLAS/ IRS/ MMD standard (with ISO certificate). Jacket to be fitted with three buckle with adjustable belt whistle attached with a lanyard reflective tape 04 Nos. | 070Life Saving Appliances(d) Firm to replace with new life jacket made as per SOLAS/ IRS/ MMD standard (with ISO certificate). Jacket to be fitted with three buckle with adjustable belt whistle attached with a lanyard reflective tape 04 Nos. |
| 163 | 071FIRST AID BOXFirm to replace with 01 in nos first Aid box as per sample. | 071FIRST AID BOXFirm to replace with 01 in nos first Aid box as per sample. |
| 164 | 072ESCAPE MARKINGEscape marking required to be renewed with radium florescent sticker. | 072ESCAPE MARKINGEscape marking required to be renewed with radium florescent sticker. |
| 165 | 073Kit lockerFirm to supply Standing locker in crew room as per sample. Mat- CRCA, Qty - 06 | 073Kit lockerFirm to supply Standing locker in crew room as per sample. Mat- CRCA, Qty - 06 |
| 166 | ENGINEERING PACKAGEDEFECT DESCRIPTION1001Eqpt/System: Sullage Pump Engine, MAKE:-M/S GREAVES, MODEL:-3G11NA,TYPE:-(AIR COOLED,4-STROKE,VERTICAL INLINE, DIESEL FUELLED) RATING:-24KW,RPM:-1500 Qty 02 Nos Note:- Firm to quote for services & materials/spares/consumables required to undertake each below mentioned serials | ENGINEERING PACKAGEDEFECT DESCRIPTION1001Eqpt/System: Sullage Pump Engine, MAKE:-M/S GREAVES, MODEL:-3G11NA,TYPE:-(AIR COOLED,4-STROKE,VERTICAL INLINE, DIESEL FUELLED) RATING:-24KW,RPM:-1500 Qty 02 Nos Note:- Firm to quote for services & materials/spares/consumables required to undertake each below mentioned serials |
| 167 | 1001Eqpt/System: Sullage Pump Engine (a) Renewal of fuel filters to be carried out | 1001Eqpt/System: Sullage Pump Engine (a) Renewal of fuel filters to be carried out |
| 168 | 1001Eqpt/System: Sullage Pump Engine (b) Renewal of air filter to be carried out | 1001Eqpt/System: Sullage Pump Engine (b) Renewal of air filter to be carried out |
| 169 | 1001Eqpt/System: Sullage Pump Engine (c) Renewal of Lub oil filter to be carried out | 1001Eqpt/System: Sullage Pump Engine (c) Renewal of Lub oil filter to be carried out |
| 170 | 1001Eqpt/System: Sullage Pump Engine (d) Renewal of V Belts (AX49/1275LD) to be carried out | 1001Eqpt/System: Sullage Pump Engine (d) Renewal of V Belts (AX49/1275LD) to be carried out |
| 171 | 1001Eqpt/System: Sullage Pump Engine (h) Renewal of flexible hose return line pipe to be carried out | 1001Eqpt/System: Sullage Pump Engine (h) Renewal of flexible hose return line pipe to be carried out |
| 172 | 1001Eqpt/System: Sullage Pump Engine (j) Renewal of pump to lube oil line to be carried out | 1001Eqpt/System: Sullage Pump Engine (j) Renewal of pump to lube oil line to be carried out |
| 173 | 1001Eqpt/System: Sullage Pump Engine (k) Renewal of vibration dampers to be carried out | 1001Eqpt/System: Sullage Pump Engine (k) Renewal of vibration dampers to be carried out |
| 174 | 1001Eqpt/System: Sullage Pump Engine (m) Renewal of durettes to be carried out (durettes to be supplied by the firm) | 1001Eqpt/System: Sullage Pump Engine (m) Renewal of durettes to be carried out (durettes to be supplied by the firm) |
| 175 | 1001Eqpt/System: Sullage Pump Engine (s) Overhauling of FIP to be carried out | 1001Eqpt/System: Sullage Pump Engine (s) Overhauling of FIP to be carried out |
| 176 | 1001Eqpt/System: Sullage Pump Engine (u) Tappet setting and clearance to be adjusted | 1001Eqpt/System: Sullage Pump Engine (u) Tappet setting and clearance to be adjusted |
| 177 | 1001Eqpt/System: Sullage Pump Engine (v) chemical cleaning & pressure testing of Exhaust pipe and lagging dia 60mm to be carried out | 1001Eqpt/System: Sullage Pump Engine (v) chemical cleaning & pressure testing of Exhaust pipe and lagging dia 60mm to be carried out |
| 178 | 1001Eqpt/System: Sullage Pump Engine (w) Safety Checks of engine to be carried out. Engine trials to be undertaken & Engine to be proved for satisfactory performance. | 1001Eqpt/System: Sullage Pump Engine (w) Safety Checks of engine to be carried out. Engine trials to be undertaken & Engine to be proved for satisfactory performance. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
| 8 | Click here to download tender document | Tender Documents |
| 9 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail