| 1 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth |
| 2 | Fixing charges of new water seal including punching hole and nut bolt complete in all respect |
| 3 | Removing of old water seal from canal gate, including cutting of existing nut bolts etc. complete in all respect |
| 4 | labour charge for fixing roller and welding of lock plates, minor repair of gates for making roller in alignment including drilling new hole of appropriate size |
| 5 | Labor charges for removing existing vertical lift canal gate and lowering of new / existing gate having weight 3 to 5 MT including ,Greasing ,oiling , cutting of accessories as per direction of engineer in charge as per specification and drawing of the department excluding the cost of rollers. |
| 6 | Painting of canal gate with 2-pack Zinc chromate/phosphate primer in two coats. The dry thickness of each coat should be 35 microns and total thickness should not be less than 70 microns. And Painting of 2-pack epoxy paint in three coats of approved colour as per Engineer in-charge. confirming to IS 104 |
| 7 | Supply of water seal musical hollow knot type for canal gate having size 125x12x45 mm as per IS 11855 specification. |
| 8 | Supply of water seal Flat type for canal gate having size 100x12 mm as per IS 11855 specification. |
| 9 | Supply of cast steel roller for canal gate of grade 200-400N as per IS 1030 specification, having size 375 mm Dia and 100 mm Thick including brass bush and 2 nos brass spacer of 10mm thick & single piece stainless steel monolithic pin complete set as per drawing and specification. |
| 10 | Carriage of Bats Ballast, Kankar, Sand, Bajri, Stone, Grit, Murram, Soling Stones For Road, Water, Good Earth.2 KM Katcha |
| 11 | Cutting and burning cactus and thorny bushes and sarkanda. |
| 12 | Uprooting Juli Flora /sarkandaUprooting Juli Flora /sarkanda, pahari kikar or arrows upto 0.50m. depth below ground level. |
| 13 | Note- The rates provided in this Bill of Quantities (BOQ) are based on the latest BSR and are exclusive of GST. Applicable GST, if any, shall be dealt with as per prevailing Government rules and provisions.\\" Please Enable Macros to View BoQ information |