Name of Work:- Lining of RWR and sump well with valve chamber at village motasar Under Sub Div. Bajju under DMFT
Sl. No.
Item Description
1
Part A :- LINING OF RWR
2
Earth work in excavation over area ( for Sedimentation cum storage tank) Exceeding 30 cm in depth 1.5 Mtrs in width as well as 10 Sqm on plan) including disposal of excavated earth lead up to 50 M and all lift. Disposed earth to be levelled and neatly dressed including stacking of useful material if any available during excavation for all kind of soil. Earth work to be carried out by means of mechanical system i.e. Tractor craw or any other mechanical system. No extra payment shall be done for lift of any limit. This work also involves dressing of sides & bottom for lining purpose which is to be done manually, slope of sides to be maintained as per specification. Work is to be done as per direction of Engineer In Charge and technical specifications.
3
Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks Cement mortar 1 : 4 (1 cement : 4 coarse sand)
4
Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 4 (1 cement : 4 coarse sand)
5
Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering - All up to plinth level M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size).
6
Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish :
7
20mm thick .
8
12mm thick .
9
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.:All kinds of soil
10
Providing, lowering, aligning, fixing in position in pipe line, CI D/F Sluice valves straight and pocket less body passage of approved make of following Pressure rating & dia complete, confirming to IS:14846 (amended up to date) and of following specifications: Body, Bonnet, Wedge, Gland, Thrust Plate, Cap & Hand wheel of Grey cast iron of IS:210/ FG200 Stem - AISI- 410 ,Body Seat ring, Wedge facing ring & Bushes - LTB2/ SS , Face to face dimensions as per IS 14846/2000 (amended up to date) ,Epoxy ( Non-Toxic- suitable for drinking water) applied inside and outside, Flanges Drilled as per IS 1538. Nut-Bolt confirming to IS:1363 and IS: 1367/ CS/ galvanised steel Insertion rubber of black EPDM 6mm thick . Sluice valves including all jointing & jointing material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer-in-charge. Note: Rates are exclusive of tail piece/ dismantling joints and earth work. Manually Operated CI Sluice valve of Class PN-1.0 150 mm HW
11
120cm. high fencing with angle iron posts 50x50x6mm. placed at every 3 Mtr. apart 30cm. in ground embedded in cement concrete 1:3:6 (30x30x45cm) corner & every tenth posts to be strutted with 50x50x6mm angle iron provided with four horizontal lines and two diagonals of black barbed wire between two posts fitted and fixed with G.I. staple including earth work in excavation etc. complete.
12
SINGLE FLAT BRICK LINING WITH 250 MICRON LDPE FILM:- Preparing surface levelled & dressed to proper slope & laying over it on sand properly rammed and watered in 2 Layers of 5 cm each. Providing and laying 250 micron LDPE film as per ISS:2506-1984 including overlapping on the finished surface of compacted sand. Over LDPE film 15 mm thick cement sand mortar 1:3 shall be provided and laid which shall be cured properly. Over the base mortar single layer Ist class brick lining in cement sand mortar 1:3 shall be provided with joints not more than 8 mm wide and curing shall be done for 14 days. This also includes providing weedicides & anti-termite treatment, complete work as per technical specifications. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.