|
| 1 | Carriage, loading-unloading with proper stacking of following material from Central Store /department store to Site distance approx 20 Km. |
| 2 | 11 KV 3x70/120/185 sq.mm XLPE cable |
| 3 | 9/11 Mtr long ST pole |
| 4 | PCC Pole 8.5 Mtr |
| 5 | 11 KV cable box straight thru |
| 6 | 11 KV cable box O/D |
| 7 | 11 KV cable box I/D |
| 8 | 11 KV Polymeric Pin INSULATOR with Nut |
| 9 | ABC (3x120+1x95+1x16) Sqmm. |
| 10 | 3 Phase DP Box with Clamp |
| 11 | LT CABLE 1X400sqmm |
| 12 | 11 KV VCB FOR OG CTR 200/100/5. |
| 13 | Stringing & sagging of AB Cable (3x95+1x70+1x16) /(3x120+1x95+1x16) Sqmm with proper jumpring and connections with required Clamps, jumpers, piering connector. (Cost of clamps etc. shall be borne by contractor) (Only Cable shall be supplied by department) |
| 14 | Fabrication, erection of cable exposure on 11 Meter long ST pole with fixing of necessary clamps, accessories required including supply and fixing of straight Ms 100x50mm Top channel (2240mm long) One no, dropper channel 100x50mm (2240mm long) 2 Nos, with arrangement of fixing 3 nos. pin insulator, along with 11 KV DO Fuse set as per RESPO spenc & direction of E/I. ST Pole shall be supplied by the deptt. |
| 15 | Fabrication, erection of single 11 Mtr ST/8.5 PCC Pole with fixing of necessary clamps, accessories required including supply & fixing of clamp, nuts & bolts, Grouting with cement, sand, brick ballast in ratio :1:4:8 and earthing as per RESPO specification & direction of E/I with fixing of T-off with fitting & tapping pole. (Only Pole shall be Supplied by the deptt.) |
| 16 | Fixing of Distribution Box with proper clamps, nuts and bolts & taking connection from ABC to distribution for supply. |
| 17 | Providing and Fixing of M.S. channel/Dropper/T-OFF-TOP channel |
| 18 | Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator |
| 19 | Earthing of poles as per RESPO norms . (All the materials supplied by contractor) |
| 20 | Grouting of poles with help of cement sand & brick ballast. |
| 21 | Painting of pole |
| 22 | Laying of 11 KV 3x185 sq.mm XLPE cable by manual method |
| 23 | Laying of HDPE Pipe PE-80, PN-6, DN-200mm dia pipe for laying of 11 KV 3x185 sqmm, XLPE Cable with HDD (Trenchless) method including cable laying. |
| 24 | Hoisting of cable with the help of GI pipe 4\\" dia each having length of 3 meter along with supply and fixing of MS brackets and GI pipe. |
| 25 | High presure testing of cable |
| 26 | Providing and fixing of danger board |
| 27 | Providing and fixing of Nuts & Bolts OFF SIZE |
| 28 | Providing and fixing of cable route marker |
| 29 | Providing and fixing of under ground warning tape |
| 30 | Providing & Fixing of Suspension clamps (Insulated) with bolts & nut. |
| 31 | Providing & Fixing of dead emd clamps (Insulated) with bolts & nut. |
| 32 | Providing & Fixing of I-Hook (Insulated) for above clamps with bolts & nut. |
| 33 | Installation of 11KV I/C &O/C VCB as per norms. |
| 34 | Chemical earthing of VCB. |
| 35 | Complete testing of VCB. Please Enable Macros to View BoQ information |