| 1 | PRICE SCHEDULE: A (SUPPLY) Bidder's Name & Address: To: Superintending Engineer Electricity 765&400 kV Transmission Design Circle U.P.Power Transmission Corporation Ltd. 10th. Floor,ShaktiBhawan 14, Ashok Marg, Lucknow-226001 All Values in Indian Rupees Sn ItemDescription Unit (Qty) Construction of 400kV Orai-Parichha line (20Km) Mode of Transaction (Direct or Bought-out items) Unit Ex-works price Unit Packing & Forwarding Charges Unit Freight & Insurance Charges Unit F.O.R. Destination price (6+7+8) Total F.O.R. Destination price (4x9) |
| 2 | 2.0 A Supply of towers : |
| 3 | Fabrication, Galvanizing, Inspection & supply of various type of towers, Tower Extensions,Stub setting templates, excluding bolts &nuts, step bolts but including hangers, D-Shackles, pack washers etc. i) High Tensile Steel MT 204.0 Direct / Bought-Out 0.0 ii) Mild Steel MT 254.0 Direct / Bought-Out 0.0 |
| 4 | Fabrication, galvanizing & supply of stubs & cleats of various type of towers, tower extensions (complete) excluding bolts & nuts i) High Tensile Steel MT 14.0 Direct / Bought-Out 0.0 ii) Mild Steel MT 3.0 Direct / Bought-Out 0.0 |
| 5 | Supply of Bolts & Nuts including step bolts and spring washers i) Hex. Bolts & Nuts & spring washer & Step Bolts MT 21.0 Bought-out 0.0 ii) Hex.Anti-Theft bolts & nuts& spring washer MT 1.0 Bought-out 0.0 |
| 6 | (a) Supply of Pipe type Earthing material per Tower (b) Supply of Counter Poise type Earthing material including earthwire per Tower Nos. 3.0 Bought-out 0.0 |
| 7 | Supply of following Tower Accessories i) Danger Plate Nos. 20.0 Bought-out 0.0 ii) Number Plate Nos. 20.0 Bought-out 0.0 iii) Phase Plate (Set of three) Sets 40.0 Bought-out 0.0 iv) Circuit Plate (Set of two) Nos. 20.0 Bought-out 0.0 v) Bird Guard Nos. 210.0 Bought-out 0.0 vi) Anti-Climbing Device Nos. 39.0 Bought-out 0.0 B Supply of line materials : |
| 8 | Supply of Disc Insulators i) 120KN Nos 5520.0 Bought-out 0.0 ii) 160KN Nos 2300.0 Bought-out 0.0 |
| 9 | Supply of Hardware Fittings b For 400kV line i) Single 'I' Suspension Insulator String (suitable for 1 x 23, 120 KN Disc Insulators) Sets 190.0 Bought-out 0.0 ii) Single 'I' Suspension Pilot Insulator String (suitable for 1 x 23, 120 KN Disc Insulators) Sets 1.0 Bought-out 0.0 iii) Single 'V' Suspension Insulator String (suitable for 2x23, 120 KN Disc Insulators) Sets 25.0 Bought-out 0.0 iv) Double Tension Insulator String (suitable for 2 x 23, 160 KN Disc Insulators) Sets 50.0 Bought-out 0.0 3a Supply of Accessories for ACSR MOOSE i) Mid Span Compression Joint Nos. 250.0 Bought-out 0.0 ii) Repair Sleeve Nos. 200.0 Bought-out 0.0 iii) Bundle Spacer Nos. 1500.0 Bought-out 0.0 iv) Rigid Spacer for jumper Nos. 75.0 Bought-out 0.0 v) Vibration Damper Nos. 1032.0 Bought-out 0.0 4a Supply of Accessories for 7/3.66 mm G.S. Earthwire i) Suspension Clamp for 7/3.66 mm GS Earthwire Nos. 35.0 Bought-out 0.0 ii) Tension Clamp for 7/3.66 mm GS Earthwire Nos. 10.0 Bought-out 0.0 iii) Mid Span Compression Joint for 7/3.66 mm GS Earthwire Nos. 15.0 Bought-out 0.0 iv) Vibration Damper for 7/3.66 mm GS Earthwire Nos. 90.0 Bought-out 0.0 v) Flexible Copper Bond for 7/3.66 mm GS Earthwire Nos. 45.0 Bought-out 0.0 |
| 10 | Supply of OPGW and its HARDWARE & ACCESSORIES |
| 11 | Fibre Optic Cable & accessories (viii) Supply of Installation Hardware set for 48 Fibre (DWSM) OPGW Fibre Optic cable (excluding joint box) Set* 20.2 Bought-out 0.0 (ix) Joint Boxes (48–Fiber) No. 8.0 Bought-out 0.0 TOTAL 0.0 GST @18% 0.0 GRAND TOTAL 0.0 * One set of installation hardware shall contain all installation hardware fittings as may be required for 1 km of OPGW & fibre optic approach cabling. PRICE SCHEDULE: B (WORK) Bidder's Name & Address: To: Superintending Engineer Electricity 765&400 kV Transmission Design Circle U.P.Power Transmission Corporation Ltd. 10th. Floor,ShaktiBhawan 14, Ashok Marg, Lucknow-226001 All Values in Indian Rupees SI. No. Description Unit (Qty) Construction of 400kV Orai-Parichha line (20Km) Unit Erection Charges Total Erection Charges (4x5) |
| 12 | Survey i) Survey including preparation of schedule of materials, marking of locations Kms 20.02 0.0 ii) Check survey and final peg marking Kms 20.02 0.0 |
| 13 | Soil investigation ( All kind of Soil) |
| 14 | Benching of all kinds of soil (i) Normal Soil Cum 10.0 0.0 (ii) Fissured Rock Cum 10.0 0.0 (iii) Hard Rock Cum 10.0 0.0 4a Cost of excavation of foundation pits including all earth work, backfilling and leveling etc. for i) Dry Soil Cum 9.0 0.0 ii) Wet Soil Cum 6500.0 0.0 iii) Fissure Soil Cum 9.0 0.0 iv) Hard Rock Cum 0.0 0.0 |
| 15 | Setting of stubs including all foundation work but excluding the cost of concerting and excavation for following towers (Rates per Location): a For 400kV line i) DA+0, DA+3, DA+6, DA+9 Per Location 30.0 0.0 ii) DB+0,DB+3, DB+6, DB+9 Per Location 4.0 0.0 iii) DA+18/25m Per Location 1.0 0.0 |
| 16 | Cost of concreting for all types of foundation including cost of cement, dewatering, forming, shoring and shuttering and curing but excluding cost and installation of reinforcement bars with i) M20 Concrete Nominal Mix 1:1.5:3 Cum 715.0 0.0 ii) M10 Lean Concrete Nominal Mix 1:3:6 Cum 93.0 0.0 |
| 17 | Installation of steel reinforcement bars in R.C.C. foundation including cost of steel reinforcement bars, cutting, bending, placing, binding etc. |
| 18 | Erection of 400kV DC Twin super structure of all types of towers and their extensions wherever required including all work above ground level excluding hoisting of insulators, but including fitting of danger number, phase plates, and punching of bolts . MT 0.0 0.0 |
| 19 | Laying, tension stringing, tensioning, stringing with TSE, clamping, jointing etc. complete with TWIN MOOSE bundle conductor per phase including hoisting of insulators, fitting of all necessary hardware and accessories etc. for complete route Km. for all the six phases. 11a Laying, stringing, tensioning clamping, jointing etc. of ground wires/OPGW including fitting of all necessary hardware and accessories for : i) One no. 7/3.66 G.S. Earthwire Route Km 20.2 0.0 ii) One no. Optical Fiber Ground wire (OPGW) (Stringing of OPGW shall also be inclusive of installation of Joint Boxes, Jointing & splicing work and its entire associated works.) for 400kV Route Km 20.2 0.0 |
| 20 | Grounding work including earth work etc. for pipe type grounding including all material like cost of coke & salt etc. |
| 21 | Grounding work for counterpoise grounding |
| 22 | Tack & Welding of Nuts and Bolts at different locations including Galv. Paint |
| 23 | Sorting.loading of 400 kV tower at UPPTCL 220 kV SIS Shahjahanpur. All T&P, Manpower etc shall be arranged by contractor at his own cost |
| 24 | Carriage of 400 kV tower material from 220 kV S/S Shahjahanpur(Approx 300 K.M.) and unloading at site. All T&P, Manpower etc shall be arranged by contractor at his own cost |
| 25 | Fabrication of tower part like cross arm , peak , stub etc as per bom including cutting shearing ,welding , drilling bending and proper fixing of peak ,stub, cross arm of tower as per given drawing . |
| 26 | Carriage of new ACSR Moose conductor ( Approximate 80 KM) from UPPTCL substation in the peripheri of 450 K.M. with loading and unloading |
| 27 | Carriage of OPGW ,48 Fibre( Approximate 20 KM/ 15 MT) from UPPTCL substation in the peripheri of 450 K.M. with loading and unloading |
| 28 | Carriage of Earthwire ,7/3.66 GS( Approximate 20 KM/20 MT) from UPPTCL substation in the peripheri of 100 K.M. with loading and unloading TOTAL(A) 0.0 GST@ 18% 0.0 GRAND TOTAL 0.0 Summary Bidder's Name & Address: To: Superintending Engineer Electricity 765&400 kV Transmission Design Circle U.P.Power Transmission Corporation Ltd. 10th. Floor,ShaktiBhawan 14, Ashok Marg, Lucknow-226001 S.No. Name of line Construction of 400kV Orai-Parichha line (20Km) |
| 29 | Supply |
| 30 | Erection Total (Supply+Erection) 0.0 |