Tender For Under Zone-01 Ward-1, Construct Borwali Drain From Laxmi Purva Khalwa Ground To 85/62 Sulabh Urinal And From Mandir To Gt Road.
Tender Overview
Project Description
Tender for Under Zone-01 Ward-1, Construct Borwali Drain From Laxmi Purva Khalwa Ground To 85/62 Sulabh Urinal And From Mandir To Gt Road.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 11-Jun-2026 | date | Date | 23-Jun-2026 |
| 2 | 17-Jun-2026 | d | Date | 30-Jun-2026 |
| 3 | 17-Jun-2026 | d | Date | 30-Jun-2026 |
| 4 | 11-Jun-2026 | date | Date | 23-Jun-2026 |
| 5 | 28-Jun-2026 | dt ext | Date | 09-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Dismentling of damage rec including stacking dismental material with in 60m distence etc all comp |
| 2 | Dismentling of damage b/wincluding stacking dismental material with in 60m distence etc all comp |
| 3 | Earth work in excavation means (hydraulic )excavator/manual means in foundation trenches are drains (not exceeding 1.5 mtr in width or 10swm on plan ), excavation soil and disposal off sarface exavated soil as directed, within lead of 50 m.including dressing of side and ramming of bottoms, lift up to 1.5 m, including getting out the all kinds of soil. |
| 4 | Close timbering work including strutting,shoring and packing cavities etc all comp |
| 5 | construction of a chamber.900x.800x.500 etc all |
| 6 | construction of a chamber 1200x1200x1000 mm etc all comp. |
| 7 | Supply and fixing manhole Rcc coller etc all comp. |
| 8 | M-150 b/w with 1:4 cement & C.sand mortar etc all comp. Super structure |
| 9 | Construction of granular sub base (G.S.B) etc all comp. |
| 10 | providing and laying in cement conc Concrete 1:1.5:3 (1 Cement1.5c sand and 3 graded stone Ballast 20 mm nominal size)and curing comp etc all comp. |
| 11 | Cartage of earth and dismental material upto 3.00km including loading unloading etc all comp. |
| 12 | 15 mm thick thick cement plaster (of neet cement of cement and marble dust on rough side 1:4 cement c. sand for celling etc all comp. |
| 13 | providing and laying in position machine best and machine mix design M-25 grade cement concrete for rainforest cement concrete work using cement content as per approved design mix including pumping of concrete to site of laying but including loading the cast of centring shuttering finishing and reinforcement including and mixture in recommended propagation as per IS 9103 to escalate rated setting of concrete improve work imparing strength and durabilities as per direction of engineer in charge (note,-cement content consider in this item is @ 330 kg per cubic meter. Excess/less cement used as per design mix is payable /recoverable separately)all comp. |
| 14 | M.S. or iron in plain work such as reinforcement concrete or reinforced brick work (when not icluding over rate) wrought torequired shape as necessary including bending for proper complition of the work and including suply of steel its wastage bend hooks and authorized ocerlaping shall be measured up two floor two level (over all rate) |
| 15 | M.S. or iron in plain work such as fabrication of MS gate/grill wrought to required shape including welding grinding as required for completion of work |
| 16 | Disilting of nala under liqued mud under foul position etc all comp. |
| 17 | cariage of silt under bucket etc all comp. |
| 18 | Supply/fixing and Jointing RCC hume pipe 300mm dia etc all comp. |
| 19 | De watring by mud pump 1.50 hp etc all comp |
| 20 | 18@ gst /recoverable separately)all comp. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 7 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 days