| 1 | BILL OF QUANTITIES PREAMBLE 1. The Bill of Quantities shall be read in conjunction with Instructions to Tenderers, General, and Special Conditions of Contract. Notice Inviting Tender, Outline Construction Specifications, Architectural Specification and all Employers’ Requirements including appendices, Conditions of contract on Safety & Health and Environment and Tender Drawings. 2. Schedule “A” consists of two Sub-Schedules namely Schedule A1 for NDSR (Non-Delhi Schedule of Rates) items and Scheule A2 for DSR:2023 items for Civil & Structural Works. The tenderer has to quote percentage above/below/at par rates against Sub-Schedules “A1 & A2”. 3. Schedule “B” consists of two Sub-Schedules namely Schedule B1 and B2 of NDSR (Non-Delhi Schedule of Rates) items for Secant Piles work. The tenderer has to quote percentage above/below/at par against Schedule “B1”. The Schedule B2 consists of items for Socketing in Rock for Secant Piles having UCS above 50 Mpa. The tenderer has to quote rates against items of Schedule “B2”. 4. Schedule “C” consists of two Sub-Schedules namely Schedule C1 for DSR:2023 (Delhi Schedule of Rates) items and Scheule C2 for NDSR items (Non-Delhi Schedule of Rates) Architectural Finishing & PEB works. The tenderer has to quote percentage above/below/at par rates against Schedule “C1 & C2”. 5. The rates and prices to be tendered in the Unit Priced Bill of Quantities of Schedule “A”, “B” and “C” are for completed works and complete in all respect. All the rates shall be deemed to include cost of all plants, labour, supervision, materials, scaffolding for masonry work & any work etc., G.I. binding wire, all lead & lifts, carriage, transport, all temporary works, erection, maintenance, utility identification, survey, all other works mentioned in all Employer’s Requirements including appendices, Conditions of contract on Safety & Health and Environment, contractor’s profit and establishment/overheads, together with preparation of As-built drawings, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contract. For taxes and duties, refer clause 11.1.1 of General Condition of Contract (Dec-2025) and C2.6 of ITT. In case of any discrepancy in DSR 2023 items covered under Schedule “A2 & C1”, the relevant item as mentioned in DSR-2023 published by CPWD shall prevail. 6. Demolition of existing structures shall be carried out without making any damage to adjacent structures, utilities and with all safety measures. 7. The Schedule of Payment/Specified in Schedule “A”, “B” & “C” is purely for the purpose of releasing “On Account Payments” for the work executed. The work executed against the BOQ items in Schedule “A”, “B” & “C” would be paid on measurement basis. 8. The payment under the Payment Schedule will cover all work specified in the tender drawings and / or provided in the scope of work. The Schedule of Payment will not get modified due to alterations of any type so far as the modifications/alterations are within the scope of work and/or provided for in the tender drawings. 9. The Contractor may raise their “On Account” payments on monthly basis as per the status of work on the last day of the respective month. 10. If the tenderer fails to quote rates against any item, the tender will be treated as incomplete and non-responsive and shall be rejected. 11. The Financial Package (Pricing Document) must be uploaded by the same person who is authorized as per the submitted Power of Attorney(POA) and who has uploaded the Technical Package using a valid Class-II/III digital signature on behalf of the Tenderer. |
| 9 | Extra over S.no 3 of Schedule B1 for drilling & Socketing in for rock strength above 50 Mpa to above ( Including all tools and machinery as per instruction of engineerIncharge) (For 1200 mm dia Pile) ANNEXURE-13A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS (Refer Clause C 2.2 and C15.1 of ITT) The following are the particulars of minor deviations from the requirements of the Tender Document: Sr. No Clause Deviations Price adjustment for each deviation/s Note : 1. The Tenderer shall indicate price adjustment against each deviation in Annexure 13A of BOQ. This price is the price which the tenderer shall reduced from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3.If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Annexure, it will have no effect. Please Enable Macros to View BoQ information |